You are on page 1of 6
‘SANKEN GONSTRUCTIONPVT.LTD. au RECORDS) LEVELS : Record RT [( sane cowsrrucrion. ) Revision Na @ Dale of UE TATE Page We TOR PROIECT: | Gonstucton of Hesdquerers Buiding for Ceylon Eletioty Board(SKEB) CONTRACTOR'S REQUEST FOR APPROVAL (RFA) To. The Engineer Slate Enginesring Corporation of Si Lanka Due: Mh February 2022 ATIN ‘Me Samitha ReERFA No: EDY DWREA-093 cc 1 MeSanja| Prepared by : Ami RE omnmeee Document Ref. \ \ Contractors | Method statement forthe rack repairing for Approval { on sta pairing for Approval | cud tndlh ype e.Smmm ME prowécl melwos Comments cm be acceplee Bol fa move — ban ‘oy ger cal, need te be Slur mueshgate o.smm whith are chuboally cave date fie neciier tin Bsimm , dawurscaue epecy grant 1) Ye _depln Ve greater Loe asm gt ees Pgee fala For Tender Documentation For aention eum After Use Nom Charge te deucle Vieed te T] for oman rend for sevew for Asta cuunee (OEE eae re For Payne Applon For sale Tes Reet ropes Pty Wem Sree Eoper For Sop Dring For eso [7] sete For Preliminary For Contuton Dwg For tteeee ctewe se eqs For acon anton or exsogse [i] Far apa Test Rest [ew tent ats For comments For inpesion oer (ter iastetin/emaks ACKNOWLEDGEMENT BY ADDRESSEE NAME, SIGNATURE, DATE ‘APPROVED OR NOT APPROVED NAME ; EV. Withee mesels Dare. proved ———— Approved wih comments weed ¥esub nt Resi ot Approved [Nate Psformat shoot be changed wilt prior approve of OMS Oganng Comme Eng. coPy PISANKEN ‘CONSTRUCTIONPVT.LTD. QUALITY RECORDS. LEVELS - ecard Wo ima ( SANKEN CONSTRUCTION. } Revsten NG o Da oa ARTES Page Nor TOF ‘ROECT: | Consraton of Headquarters Guiding for Ceylon Eleciy Board (SHES) CONTRACTOR'S REQUEST FOR APPROVAL (RFA) TO “The Engineer Slate Engineering Corporation of Si Lanka ‘Daw Mth Febroay 2022 ATIN Me Samitha ReERFA No: ED DWIRFA.O93 cc E_ MsSanja| Prpare_by Aria RE Hi Document Ref, Contractors Method statement forthe crack repairing for Approval Request nea ‘Comments For Tender Documentation VW] For information second For Payment Application For Shop Dawing For Constastion Bue For aetion/atention 1 Technical Data ter instruction remarks ACKNOWLEDGEMENT BY ADDRESSEE For rstention ReturAfr Use Non-Chargeable For review For Aebuit Chargeable For sample Test Report Progress Photo For laieation Schade For Preliminary For reference ‘cenente ‘As requested For catalogue [¥ ] For approval Test Result For comments For inspection ter MAME sDaganeyale rH suowarune : (Y. DATE: (Jina foeo22 ‘APPROVED OR NOT APPROVED NAME. Approved Approved with comments Resubmit Not Approved DATE [Notes Thr formal shod nt be chan wiht rar proof OMS. Orang Comoe Finex Repairing system R2 Proposed Products MASTERFLOW 810 / MAPEFILL GP. - Nonshrink, comentitious grout for use engineering works GALVANY 800 - Zinc rich, single component, high molecular weight primer EMACO 157D PRIMER - SBR acrylic based bonding and polymer modifying agent for concrete and mortars MASTERKURE 181 - Acrylic based, concrete curing compound Manufacturer BASF South East Asia Pvt Ltd, Singapore. Mapei Far East Pvt Ltd, Singapore. Application Methodology 1. Remove the existing plaster(if any) and chip & remove loose materials, loose particles, ete and expose the sound concrete surface. 2 Using angle grinder form 25 mm x 25 mm "U" groove along the erack. 3 Apply bonding agent EMACO 157 D primer as per Manufacturer's Specifications 4 Mix and pour high strength non shrink MASTERFLOW 810 / MAPEFILL GP according to the Manufacturer's Specifications. ERKURE 181. 5 Cure the repaired area with MAS 6 Final finishing - Plastering work. Detailed data sheets of the products proposed to be used have been enclosed for your perusal FINEX ENGINEERING PVT LTD FINEX ENGINEERING FINEX CONSTRUCTION GROUT GP. Non-shrink,cementitious grout for use in general civil engineering works FINEX CONSTRUCTION GROUT GP is ready to use, non-shrink, natural aggregate cementitious grout for use in general civil engineering works. FINEX CONSTRUCTION GROUT GP provides extended working life and high early and ultimate strengths. INEX CONSTRUCTION GROUT GP is recommended for: +Stanchion base-plates and columns +Prefabricated concrete panels and beams +Bridge bearing plates, “Anchor bolts and bars *Underpinning +Patch repair works sHigh strength-Provides good early and ultimate ‘strengths which ensure quick return to service and long term durability Non shrink-Hardens free of bleeding, settlement and “ving shrinkage when placed at _ flowable eunsistency “Flowable consistency-Ensures complete filing of even intricate voids often without the need for pumping and strapping sAmple working time-Remains placeable up to 1 hour, even at high ambient temperatures ‘Dense, impermeable grout-Provides a good watertight seal -Economical-Greater volumes of grout can be mixed and handled with less labour +Easy to use-Requires no special mixing equipment, it can be mixed in a pail using a grout stirrer *No added Chloride-Does not add to Chloride load on structure sProvides complete non shrink performance-When tested in accordance with simulated Bedplate technique +Versatile-Can be placed from flowable to trowelable consistency Flowable Compressive strength (ASTM C109) ‘day 30. Nimm2 days 40 Nimm2 Tdays 50 Nimm2 28days 60 Nimm2 Setting Time Initial 5:30hr Final 6:30hr Note: Tested using cubes of size: 50 mm x 50mmx 50mm, restrained for 24 hrs, cured by immersion in water. ‘Supply form Powder Colour ‘Cement grey Water addition Flowable 18% Trowelable 128-126% Density (wet) Flowable 2.48 Kalk Trowelable 2.26 Kgl Date - 06/06/2019 Revision -03 FINEX CONSTRUCTION GROUT GP Non-shrink,cementitious grout for use in general civil engineering works FINEX CONSTRUCTION GROUT GPcan be mixed to a flowabale or trowelable consistency. The quantity of water required for a 25 kg bag is approximately as shown below: Flowable:4 6 ters Trowelable: 3.2-3.4 liters Water addition may be affected by temperature conditions on site, Trials are recommended to determine the correct water requirement. FINEX CONSTRUCTION GROUT GP should be mixed using a suitable mixer, For flowable consistency, use a hand drill and paddle for small works up to two bags at a time and specialize grout mixers for larger volume. Drum type mixers may not provide sufficient mixing efficiency to derive the optimum performance from the grout ‘The correct volume of water should be added to the mixer followed by the powder. Mixing should continue Until the grout has @ smooth, lump-free appearance. This will normally be between 3-5 minutes after mixing has started For best results, FINEX CONSTRUCTION GROUT GP should be usedwithin 30 minutes once mixed. The substrate should be properly prepared and should be free from contamination, laitance and loose material. Thoroughly saturate the substance with water at least 2-3 hours prior to pouring the grout. All free water ponding should be blown out of the void just before pouring the grout. As for all cementitious materials, curing is essential to prevent rapid drying out of the grout and shrinkage caused by the water loss. Curing should be effected by accepted methods such as curing compounds, polythene sheets, wet hessian or water ponding Ifa shaped shoulder is required, it should be formed before the grout has reached its final set Carefully remove the formwork once the FINEX CONSTRUCTION GROUT GP is self-supporting and cut the shape of the shoulder with a trowel. Preferably the shoulder should be cut to a 450 angle to minimize stresses Clean tools and equipment with water, before FINEX CONSTRUCTION GROUT GP has hardened, otherwise mechanical cleaning will be required ‘A 25 kg bag of FINEX CONSTRUCTION GROUT GPwhen mixed to a flowable or trowelab! consistency will yield the following volumes: Flowable: Add 4.5 liters water Yeild: 13.5 liters grout Add 3.4 liters water Yeild: 12.5 liters grout FINEX CONSTRUCTION GROUT GP is packaged in 28kg_multi-ply paper sacks. FINEX CONSTRUCTION GROUT GP has a shelf life of approximately 12months when stored in a cool dry place in unopened sacks For detailed Health, Safety and Environmental recommendations, please consult and follow all instructions on the product Material Safety Data Sheet Date - 06/06/2019 Revision -03 FINEX ENGINEERING (P FINEX CONSTRUCTION GROUT GP Non-shrink,cementitious grout for use in general civil engineering works All FINEX Technical Data Sheets are updated on regular basis.It is the user's responsibility to obtain, the most recent issue. For additional information contact FINEX representative. Corporate Office :- 291, ModeraStreet, Colombo 01500 T : 014 254 6052, 011 751 3500, F : 011 254 6056, E : info@finexengineering.com,W :www.finexengineering.com ‘The technical information and application advice given in this Finex Engineering (Pvt) Ltd, publication are based on the era sent ‘ur best sciontiic and pracieal knowledge, As the infarmaion herein is of a general nature, no assumption STATEMENT OF present state of cur best scenic and practical knowledge. As the infomation herein is ofa general nature, pt fan be made 28 to a products sullabilty for @ particular use oF application and no warranty as to is accuracy, reliably or ‘completeness eter expressed or implied ie given other than those required by law, The user is responsible for checking the ‘Suitability of products for ther intended use. Flold sence where provided does not constitute supervisory responsibly. Suggestions made by Finex Engineering (Pvt) Lid ether oraly or In ting may be flowed, madited or rejectes by the ower, engineer or contractor sinco they, and not Finex Engineering (Pv) L1d, are responsibie for carrying aut procedures appropriate to a specific application Page 30f3 Date - 06/06/2019, a Revision -03

You might also like