REKAPITULASI PERHITUNGAN VOLUME PENGERUKAN

PEKERJAAN : JASA KONSULTASI BATHYMETRI DERMAGA UPS. SAMARINDA


KONSULTAN : PUSLITBANG SDA LPPM UNHAS
JENIS PEKERJAAN : GALIAN SEDIMEN/PENGERUKAN
SATUAN : M3

Jarak Luasan Luasan Rata2 Volume


No Section Ket
(m) (m2) (m2) (m3)
1 A-A 126.42
10 130.119 1301.19
2 B-B 133.82
10 130.978 1309.78
3 C-C 133.84
10 137.247 1372.47
4 D-D 140.65
10 136.838 1368.38
5 E-E 133.02
10 131.295 1312.95
6 F-F 129.57
10 131.229 1312.29
7 G-G 132.89
10 134.511 1345.11
8 H-H 133.43
10 134.780 1347.80
9 I-I 136.13
10 133.875 1338.75
10 J-J 131.62
10 129.878 1298.78
11 K-K 128.14
10 126.418 1264.18
12 L-L 124.70
10 124.544 1245.44
13 M-M 124.39
10 127.323 1273.23
14 N-N 130.26
10 132.577 1325.77
15 O-O 134.90
10 145.399 1453.99
16 P-P 155.90

Panjang (m) 150 Volume Total (m3) 19870.11