1 - Electricity Connection Date Procedure eS iets No. Drea! ito) Cory Tita tL 1 Private Villa Without connection date 2 Agricultural Projects Without connection date 3 Commercial / Commercial Two Years | Residential / Industrial / Local Government / Federal Government 4 Residential Villas located in Two Years commercial areas or real estate developer area ele For the following categories: Commercial / Commercial Residential / Private Residential / Agricultural / Industrial / Local Government / Federal Government. The connection date will be as following: toe DY Tot at Cl) Connection Date 1 250 KVA transformer Three Years 2 500 KVA transformer Three Years 3 1,000 KVA transformer Three Years 4 1,500 KVA transformer Three Years 5 More than one 1,500 KVA transformer Four Years 6 Connection from suggested or under Four Years construction Substation 7 High Voltage Substations (33KV/132KV) Without connection date 3 - Electricity Connection Date Alteration Procedure 1- Connection date alteration application must be filled along with an explanatory letter from the owner 2- To apply for alteration, the building completion percentage must be more than 50% 3- Payment of Study fees to confirm the possibility of altering the connection or not (3,000 Dirhams non-refundable) 4- Once the possibility of connection date alteration is approved, an electricity drawing approval application must be opened along with the 1 previous application receipt (original) 5- Payment of connection date alteration fees 1- Electricity Connection Date Alteration request + explanatory letter approved by the owner 2- To accept the application, the building completion percentage must be at least 50% 3-__ Incase of Alteration, a final application for the approval of electricity Drawing shall be submitted along with the original payment receipt 4- Payment of the study fees for the Possibility of Alteration and delivery or not (AED 3000) is not refundable 5- Alteration fees will be paid to issue a new date 6- Connection date will be issued for the projects when the application for approving electricity Drawing is opened Table no. 6 Fees in Dirhams as per Duration CT ary ae 1 bras re Ty ea a er Crs 110,000 30,000 50,000 A dire (-) Table no. 7 Fees in Dirhams as per Transformer Capacity & Duration BCU Oar rs 6Months 1Year 1Year& 2Year 2Year& 3 Year OU CTT ty 250 KVA 20.000 | 40.000 | 80.000 |120.000| 160.000 | 200.000 500 KVA 30.000 | 60.000 | 120.000 |180.000| 240.000 | 300.000 1,000 KVA | 40.000 | 80.000 | 160.000 240.000| 320.000 | 400.000 1,500 KVA | 50.000 |100.000| 200.000 300.000) 400.000 | 500.000 alolrnja The following to be considered: 1- If it exceeds 2 years, 20,000 Dirhams is added for each 6 months (for LV) 2- The previous fees are calculated per transformer (for HV) 3- If it exceeds 2 years, the fees of the first year is added for each 6 months (for HV) 4 What is less than 6 months is considered complete 6 months 5- The fees above do not apply to transformers in Private Villas

You might also like