You are on page 1of 28

Request For Quotation

RFQ Release Date : 4 Desember 2023


Project Title : Project Restorasi Tangki 36T-102 Kilang RU IV Cilacap
Project Owner : PT. Kilang Pertamina Internasional
Payment Terms : After BAST + Invoice 30 days
Shipping Terms : Franco Workshop

NO MATERIAL SPESIFIKASI SAT. Qty KET.

A.1 PIPE 6" ERW. SCH. STD BE A53-B KG 4.112


A.2 PEKERJAAN BENDING Siku 65x65x6 SS400 KG 1.349
A.3 PIPE 4"SCH 80, SMILS, BE A53-B KG 3.878
B.1 PIPE 6" ERW. SCH. STD BE A53-B M2 75
B.2 PIPE 4"SCH 80, SMILS, BE A53-B M2 466
B.3 PIPE 3"SCH 80, SMILS, BE A53-B M2 691,7
B.4 Siku 50x50 SS400 M2 265
PEKERJAAN SANDBLAST PAINTING
B.5 Siku 65x65x6 SS400 M2 225
B.6 Siku 75x75 SS400 M2 10
B.7 FB. 6tx50 A36 M2 3
B.8 UNP 100x50x5x7,5 A36 M2 344

Demikian Permintaan ini kami sampaikan, mohon dapat mengirimkan penawaran segera ke email kami.
Email : ekkyardiann@gmail.com
Kami tunggu paling lambat Rabu, 4 Desember 2023 sebelum pukul 17.00 WIB

Cilacap, 4 Desember 2023

Maulidin Ridwan
Project Manager

You might also like