Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:

Student Names: Tom Doe, Ollie Bielecki, Tuan Lee, Elias Acellam, Genesis Argana Sheet

Production Title: Positive Vibration Headphones Advert 0 of 0

DATE / LESSON: PRE / PROD / POST TASK TO BE COMPLETED BY? TO BE RESCHDULED?

Complete storyboard with the group and


29/11/23 PRE 29/11/23 -
finish the idea of the advert.

Paperwork for upcoming video shoots (risk


30/11/23 PRE assessments, location recces, contingency 30/11/23 -
plans)

Complete risk assessments for beach,


04/12/23 PRE 07/12/23 -
college and bench shots.

Beach day – Camera equipment collected


at 9:00am – bus to beach/Bournemouth Possible reshoots in
07/12/23 PROD 07/12/23
town to film various shots January
Back at college by 15:00pm.

Filming of bed scene – 13:00-14:00


- Bedding to be brought in. Possible reshoots in
14/12/23 PROD 14/12/23
- Ask Ben to set up scene. January
- Shoot ending ‘product’ scene.

Filming of in between shots – 14:00-15:00


- Permission for staff room usage Possible reshoots in
14/12/23 PROD 14/12/23
- Risk assessment to be January
completed.

Filming of bench shot around traffic –


15:00-16:00 Possible reshoots in
14/12/23 PROD 14/12/23
- Film multiple behind the head January
shots.

Begin editing of the advert If reshoots are held


04/01/24 POST - Compile all clips 12/01/24 editing will be
- Work out if reshoots are needed postponed.

Finish editing advert


NOT TO BE
11/01/24 POST - Audio editing 12/01/24
RESCHEDULED
- VFX editing