PROJECT: PROJECT NAME SITE NO.:
COMMISSIONING CHECK SHEET FOR CHILLED WATER PUMP. Sheet No.
SUBCONTRACTOR:
EQUIPMENT NO. SEQUENCE NO.
SERIAL NO. : DATE
LOCATION : COMMISSIONED ON
‘Checked
ITEM POINTS TO BE CHECKED by REMARKS
1 Chilled water distribution network pressure tested
and cleared.
Makeup connection made.
Dosing pot connected.
‘Strainers are cleaned.
Drain connections to all equipment provided,
Pressure gauges and flow switches are installed
Tightness of electrical connections.
‘Supply voltage and motor rating.
Free rotation of impeller.
Pump and motor are clean
Overload setting and fuse rating.
Pump and motor alignment.
Pumps are interfaced with BMS.
2
3
4
3
6
7
z
9
10 | MCC is clean.
11
12
13
14
15
Pumps are in manual made.
THE ABOVE POINTS HAVE BEEN CHECKED AND FOUND 10 COMPLY WITH CONTRACT
SPECIFICATIONS.
CHECKED BY SUBCONTRACTOR:
Signature
WITNESSED BY CLIENT:
Signature
WITNESSED / ACCEPTED BY CONSULTANT:
Signature