YAYASAN PENDIDIKAN PESANTREN AL-HIKMAH

Sekretariat : Kp. Selakaso Desa Selawangi Kecamatan Sariwangi Kabupaten Tasikmalaya

RENCANA ANGGARAN BIAYA


NO NAMA BARANG VOLUME SATUAN HARGA SATUAN JUMLAH
1 Besi beton 6 Inc 90 Btg 27,500 2,475,000
2 Besi beton 10 Inc 120 Btg 60,000 7,200,000
3 Besi beton 8 Inc 300 Btg 38,000 11,400,000
4 Besi beton 12 Inc 75 Btg 80,000 6,000,000
5 Bendarat 50 Kg 15,000 750,000
6 Semen 400 Zak 55,000 22,000,000
7 Batu Belah 20 Engkle 220,000 4,400,000
8 Pasir Cor 25 Engkle 350,000 8,750,000
9 Pasir Pasang 35 Engkle 230,000 8,050,000
10 Batu Seplit 13 Engkle 350,000 4,550,000
11 Paku 50 Kg 12,000 600,000
12 Papan Cor 7 Kb 1,200,000 8,400,000
13 Kusen 400 m 35,000 14,000,000
14 Pintu 8 Bh 350,000 2,800,000
15 Daun Jendela 60 Bh 50,000 3,000,000
16 Kaca 3 mm 60 Bh 50,000 3,000,000
17 Internit 30 Kas 45,000 1,350,000
18 Engsel Jendela 60 Psg 10,000 600,000
19 Kunci Pintu 8 Psg 120,000 960,000
20 Engsel Pintu 8 Psg 25,000 200,000
21 Batu Merah 15000 Bh 400 6,000,000
22 Keramik 200 Duz 55,000 11,000,000
23 Cat Tembok 5 GL 400,000 2,000,000
24 Cat Kayu 10 GL 50,000 500,000
25 Koas besar 3 Bh 10,000 30,000
26 Koas kecil 3 Bh 7,500 22,500
27 Roll Cat 2 Bh 20,000 40,000
28 Bak Cat 2 Bh 15,000 30,000
29 Terpentin 5 Btl 7,500 37,500
30 Lem Kayu 2 Buah 8,000 16,000
31 Milk/Calsium 25 Kg 1,000 25,000
32 Cape 3 Buah 7,500 22,500
33 Hampelas 5 Lbr 2,000 10,000
34 Cemped 4 m 13 Btg 15,000 195,000
35 Intalasi Listrik 80 m 35,000 2,800,000
36 Dudukan Colokan 4 Buah 10,000 40,000
37 Dudukan Lampu 8 Bh 10,000 80,000
38 Lampu 8 Bh 30,000 240,000
39 Pagar Besi/Tempa 60 m 110,000 6,600,000
40 Pasir Urug 30 Truk 150,000 4,500,000
41 Pekerja Tukang 4 orang 90 Hr 50,000 4,500,000
42 Pekeja laden 7 orang 90 Hr 40,000 3,600,000
Jumlah 152,773,500

Ketua Sekretaris

H. DUDUNG ABDULAH ENI HUSAENI


YAYASAN PENDIDIKAN PESANTREN AL-HIKMAH SELAKASO
Akta Notaris : RACHMAHNIA, S.H., M.Kn
Nomor : 1 Tanggal 02-06-2008
KEP. MENHUM DAN HAM RI NO : AHU-3275.AH.01.02.Tahun 2008
Sekretariat : Kp. Selakaso Desa Selawangi Kecamatan Sariwangi Kabupaten Tasikmalaya Provinsi Jawa Barat

RENCANA PENGGUNAAN DANA

NO BARANG / BAHAN VOLUME SATUAN HARGA SATUAN

I Bahan Material
1 Semen 900 zak 65,000
2 Bata Merah 10000 biji 600
3 Keramik 650 dus 31,000
4 Internit 83 kas 27,000
5 Loster 160 biji 10,000
6 Batu 20 engkel 350,000
7 Pasir Gunung 40 engkel 350,000
8 Batu Split 10 engkel 600,000
9 Pasir Air 15 engkel 400,000
10 Kapur 10 ton 350,000
II Besi dan Perlengkapan
1 Standar Kunci 3 psg 175,000
2 Baud Sofi 335 biji 5,000
3 Ram Kawat 34 m 15,000
4 Selot Jendela 35 biji 12,000
5 Selot Pintu 6 biji 14,000
6 Besi 12 mm 145 lente 96,000
7 Besi 10 mm 295 lente 68,000
8 Besi 8 mm 655 lente 48,000
9 Besi 6 mm 400 lente 28,000
10 Paku berbagai ukuran 200 kg 12,000
11 kawat 120 kg 16,000
12 Kunci Pintu 14 biji 75,000
13 Engsel Jendela 40 pasang 15,000
14 Engsel Pintu 7 pasang 25,000
15 Atap Spandek 460 m2 65,000
III Kayu,Kaca Dan Perlengkapan
1 Kayu pasagian 10 m3 2,500,000
2 Kayu usuk 6 m3 2,000,000
3 Kayu papan cor 14 m3 1,500,000
4 Pintu 6 buah 500,000
5 Kusen Pintu 3 buah 250,000
6 Kusen Jendela 30 buah 200,000
7 Daun Jendela 30 buah 70,000
8 Kaca 30 m3 55,000
9 Bambu 559 jejer 8,000
IV Cat Tembok / Kayu
1 Cat Tembok 300 kg 18,000
2 Cat Kayu 92 kg 30,000
3 Tinner 134 kg 20,000
4 Cat Meni 134 kg 15,000
5 Kuas 10 buah 10,800
V Upah tukang 3 orang x Rp. 80.000,- 130 hari 240,000
VI Upah laden 6 orang x Rp. 50.000,- 130 hari 300,000
JUMLAH
TERBILANG : EMPAT RATUS JUTA RUPIAH
AH SELAKASO
M.Kn
01.02.Tahun 2008
aten Tasikmalaya Provinsi Jawa Barat

JUMLAH

58,500,000
6,000,000
20,150,000
2,241,000
1,600,000
7,000,000
14,000,000
6,000,000
6,000,000
3,500,000

525,000
1,675,000
510,000
420,000
84,000
13,920,000
20,060,000
31,440,000
11,200,000
2,400,000
1,920,000
1,050,000
600,000
175,000
29,900,000

25,000,000
12,000,000
21,000,000
3,000,000
750,000
6,000,000
2,100,000
1,650,000
4,472,000
5,400,000
2,760,000
2,680,000
2,010,000
108,000
31,200,000
39,000,000
400,000,000