PENAWARAN

PEKERJAAN RDS Pengembangan SPAM Regional Prov. Kal


Lama Pekerjaan 60 Hari

Personil
Uraian JML MM Billing Rate Total
Team Leader 1 2 Rp 18,447,000.00 Rp 36,894,000.00
Asisten Teknik Lingkungan 1 2 Rp 4,000,000.00 Rp 8,000,000.00
Surveyor 4 1.5 Rp 3,300,000.00 Rp 19,800,000.00
Rp 64,694,000.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 800,000.00 Rp 800,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 11,750,000.00 Rp 11,750,000.00
Laporan Pendahuluan 3 eks Rp 250,000.00 Rp 750,000.00
laporan Akhir 3 eks Rp 375,000.00 Rp 1,125,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 25,275,000.00

Personil Rp 64,694,000.00
non-personil Rp 25,275,000.00
Rp 89,969,000.00
ppn 11% Rp 9,896,590.00
Total Rp 99,865,590.00
mbangan SPAM Regional Prov. Kalsel Wilayah Barat

RSD PENGEMBANGAN SPAM WILAYAH BARAT


Uraian JML MM Billing Rate Total
Team Leader 1 2 Rp 18,447,000.00 Rp 36,894,000.00
Asisten Teknik Lingkungan 1 2 Rp 4,000,000.00 Rp 8,000,000.00
Surveyor 4 1.5 Rp 3,300,000.00 Rp 19,800,000.00
Rp 64,694,000.00
Non Personil
Transportasi LS 1 Rp 4,800,000.00 Rp 4,800,000.00
ATK LS 1 Rp 800,000.00 Rp 800,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 11,700,000.00 Rp 11,700,000.00
Laporan Pendahuluan 3 eks Rp 250,000.00 Rp 750,000.00
laporan Akhir 3 eks Rp 350,000.00 Rp 1,050,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 24,950,000.00

Personil Rp 64,694,000.00
non-personil Rp 24,950,000.00
Rp 89,644,000.00
ppn 11% Rp 9,860,840.00
Total Rp 99,504,840.00
selisih Rp 360,750.00
Rp36,894,000.00 Rp 64,694,000.00
Rp8,000,000.00
Rp19,800,000.00
Rp 64,694,000.00

Rp5,000,000.00 Rp 4,800,000.00
Rp2,550,000.00 Rp 1,800,000.00
Rp4,000,000.00 Rp 4,000,000.00
Rp 24,950,000.00
Rp11,000,000.00

Rp 11,700,000.00
Rp2,500,000.00 Rp 2,650,000.00
Rp 89,644,000.00 Rp 89,644,000.00
Rp89,744,000.00
Rp9,871,840.00 Rp 89,644,000.00
Rp99,615,840.00 Rp 9,860,840.00
Rp 99,504,840.00

HPS DINAS
Rp 99,865,590.00
PENAWARAN

PEKERJAAN RDS Pengembangan SPAM Regional Prov. Kalsel Wilayah


Lama Pekerjaan 60 Hari

Personil
Uraian JML MM Billing Rate Total
Team Leader 1 2 Rp 18,447,000.00 Rp 36,894,000.00
Asisten Teknik Lingkungan 1 2 Rp 4,000,000.00 Rp 8,000,000.00
Surveyor 4 1.5 Rp 3,300,000.00 Rp 19,800,000.00
Rp 64,694,000.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 1,700,000.00 Rp 1,700,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 11,000,000.00 Rp 11,000,000.00
Laporan Pendahuluan 3 eks Rp 250,000.00 Rp 750,000.00
laporan Akhir 3 eks Rp 350,000.00 Rp 1,050,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 25,350,000.00

Personil Rp 64,694,000.00
non-personil Rp 25,350,000.00
Rp 90,044,000.00
ppn 11% Rp 9,904,840.00
Total Rp 99,948,840.00
an SPAM Regional Prov. Kalsel Wilayah Batulicin-Kotabaru

RSD PENGEMBANGAN SPAM WILAYAH BATULICIN


Uraian JML MM Billing Rate Total
Team Leader 1 2 Rp 18,447,000.00 Rp 36,894,000.00
Asisten Teknik Lingkungan 1 2 Rp 4,000,000.00 Rp 8,000,000.00
Surveyor 4 1.5 Rp 3,300,000.00 Rp 19,800,000.00
Rp 64,694,000.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 1,600,000.00 Rp 1,600,000.00
Komunikasi LS 1 Rp 950,000.00 Rp 950,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 11,000,000.00 Rp 11,000,000.00
Laporan Pendahuluan 3 eks Rp 200,000.00 Rp 600,000.00
laporan Akhir 3 eks Rp 350,000.00 Rp 1,050,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 25,050,000.00

Personil Rp 64,694,000.00
non-personil Rp 25,050,000.00
Rp 89,744,000.00
ppn 11% Rp 9,871,840.00 HPS DINAS
Total Rp 99,615,840.00 Rp 99,948,840.00
selisih Rp 333,000.00
Rp36,894,000.00
Rp8,000,000.00
Rp19,800,000.00

Rp5,000,000.00
Rp2,550,000.00 1987 2004
Rp4,000,000.00 17
Rp11,000,000.00

Rp2,500,000.00
PENAWARAN

PEKERJAAN Kajian Timbulan dan Karakteristik Sampah TPA Sampah Regional Provinsi Kalim
Lama Pekerjaan 45 Hari

Personil
Uraian JML MM Billing Rate Total
Team Leader 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten Teknik Lingkungan 1 1.5 Rp 7,000,000.00 Rp 10,500,000.00
Surveyor 4 1 Rp 3,750,000.00 Rp 15,000,000.00
Rp 62,105,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 2,000,000.00 Rp 2,000,000.00
Komunikasi LS 1 Rp 1,200,000.00 Rp 1,200,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 13,000,000.00 Rp 13,000,000.00
Laporan Pendahuluan 3 eks Rp 250,000.00 Rp 750,000.00
laporan Akhir 3 eks Rp 375,000.00 Rp 1,125,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 27,925,000.00

Personil Rp 62,105,250.00
non-personil Rp 27,925,000.00
Rp 90,030,250.00
ppn 11% Rp 9,903,327.50
Total Rp 99,933,577.50
ah TPA Sampah Regional Provinsi Kalimantan Selatan Wilayah Kabupaten Banjar

TIMBULAN SAMPAH KAB. BANJAR


Uraian JML MM Billing Rate Total
Team Leader 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten Teknik Lingkungan 1 1.5 Rp 7,000,000.00 Rp 10,500,000.00
Surveyor 4 1 Rp 3,750,000.00 Rp 15,000,000.00
Rp 62,105,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 2,000,000.00 Rp 2,000,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 13,000,000.00 Rp 13,000,000.00
Laporan Pendahuluan 3 eks Rp 250,000.00 Rp 750,000.00
laporan Akhir 3 eks Rp 350,000.00 Rp 1,050,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 27,650,000.00

Personil Rp 62,105,250.00
non-personil Rp 27,650,000.00
Rp 89,755,250.00
ppn 11% Rp 9,873,077.50 HPS DINAS
Total Rp 99,628,327.50 Rp 99,933,577.50
selisih Rp 305,250.00
Rp36,605,250.00
Rp10,500,000.00
Rp15,000,000.00

Rp5,000,000.00
Rp3,000,000.00
Rp4,000,000.00

Rp13,000,000.00

Rp2,650,000.00

Rp89,755,250.00
Rp9,873,077.50
Rp99,628,327.50
PENAWARAN

PEKERJAAN Kajian Timbulan dan Karakteristik Sampah TPA Sampah Regional Provinsi Kalima
Lama Pekerjaan 45 Hari

Personil
Uraian JML MM Billing Rate Total
Team Leader 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten Teknik Lingkungan 1 1.5 Rp 7,000,000.00 Rp 10,500,000.00
Surveyor 4 1 Rp 3,750,000.00 Rp 15,000,000.00
Rp 62,105,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 2,000,000.00 Rp 2,000,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 13,000,000.00 Rp 13,000,000.00
Laporan Pendahuluan 3 eks Rp 300,000.00 Rp 900,000.00
laporan Akhir 3 eks Rp 375,000.00 Rp 1,125,000.00
HDD Eksternal 1 pc Rp 875,000.00 Rp 875,000.00
Rp 27,900,000.00

Personil Rp 62,105,250.00
non-personil Rp 27,900,000.00
Rp 90,005,250.00
ppn 11% Rp 9,900,577.50
Total Rp 99,905,827.50
TPA Sampah Regional Provinsi Kalimantan Selatan Wilayah Kabupaten Tanah Laut

TIMBULAN SAMPAH TALA


Uraian JML MM Billing Rate Total
Team Leader 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten Teknik Lingkungan 1 1.5 Rp 7,000,000.00 Rp 10,500,000.00
Surveyor 4 1 Rp 3,750,000.00 Rp 15,000,000.00
Rp 62,105,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 1,900,000.00 Rp 1,900,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 13,000,000.00 Rp 13,000,000.00
Laporan Pendahuluan 3 eks Rp 300,000.00 Rp 900,000.00
laporan Akhir 3 eks Rp 350,000.00 Rp 1,050,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 27,700,000.00

Personil Rp 62,105,250.00
non-personil Rp 27,700,000.00
Rp 89,805,250.00
ppn 11% Rp 9,878,577.50 HPS DINAS
Total Rp 99,683,827.50 Rp 99,905,827.50
selisih Rp 222,000.00
Rp36,605,250.00
Rp10,500,000.00
Rp15,000,000.00

Rp5,000,000.00
Rp2,900,000.00
Rp4,000,000.00

Rp13,000,000.00

Rp2,800,000.00

Rp89,805,250.00
Rp9,878,577.50
Rp99,683,827.50
PENAWARAN

PEKERJAAN Kajian Timbulan dan Karakteristik Sampah TPA Sampah Regional Provinsi Kalim
Lama Pekerjaan 45 Hari

Personil
Uraian JML MM Billing Rate Total
Team Leader 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten Teknik Lingkungan 1 1.5 Rp 7,000,000.00 Rp 10,500,000.00
Surveyor 4 1 Rp 3,750,000.00 Rp 15,000,000.00
Rp 62,105,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 2,000,000.00 Rp 2,000,000.00
Komunikasi LS 1 Rp 1,300,000.00 Rp 1,300,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 12,750,000.00 Rp 12,750,000.00
Laporan Pendahuluan 3 eks Rp 300,000.00 Rp 900,000.00
laporan Akhir 3 eks Rp 375,000.00 Rp 1,125,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 27,925,000.00

Personil Rp 62,105,250.00
non-personil Rp 27,925,000.00
Rp 90,030,250.00
ppn 11% Rp 9,903,327.50
Total Rp 99,933,577.50
pah TPA Sampah Regional Provinsi Kalimantan Selatan Wilayah Kota Banjarbaru

TIMBULAN SAMPAH KOTA BANJARBARU


Uraian JML MM Billing Rate Total
Team Leader 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten Teknik Lingkungan 1 1.5 Rp 7,000,000.00 Rp 10,500,000.00
Surveyor 4 1 Rp 3,750,000.00 Rp 15,000,000.00
Rp 62,105,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 2,000,000.00 Rp 2,000,000.00
Komunikasi LS 1 Rp 1,200,000.00 Rp 1,200,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, BBM,


Konsumsi, Penggandaan
Kuisioner, Rekap Data) LS 1 Rp 12,600,000.00 Rp 12,600,000.00
Laporan Pendahuluan 3 eks Rp 300,000.00 Rp 900,000.00
laporan Akhir 3 eks Rp 350,000.00 Rp 1,050,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 27,600,000.00

Personil Rp 62,105,250.00
non-personil Rp 27,600,000.00
Rp 89,705,250.00
ppn 11% Rp 9,867,577.50 HPS DINAS
Total Rp 99,572,827.50 Rp 99,933,577.50
selisih Rp 360,750.00
Rp36,605,250.00
Rp10,500,000.00
Rp15,000,000.00

Rp5,000,000.00
Rp3,200,000.00

Rp4,000,000.00

Rp12,600,000.00
Rp2,800,000.00

Rp89,705,250.00
Rp9,867,577.50
Rp99,572,827.50
PENAWARAN

PEKERJAAN Penyusunan Dokumen Proyeksi Target Akses Penyediaan Air Minum dan Pengelolaan Air
Lama Pekerjaan 45 Hari

Personil
Uraian JML MM Billing Rate Total
TA PWK 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten Ahli PWK 2 1.5 Rp 7,500,000.00 Rp 22,500,000.00
Surveyor 2 1.5 Rp 3,750,000.00 Rp 11,250,000.00
Rp 70,355,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 2,000,000.00 Rp 2,000,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00
FGD 3 kali Rp 1,500,000.00 Rp 4,500,000.00
Laporan Pendahuluan 3 eks Rp 300,000.00 Rp 900,000.00
laporan Akhir 3 eks Rp 400,000.00 Rp 1,200,000.00
HDD Eksternal 1 pc Rp 1,000,000.00 Rp 1,000,000.00
Rp 19,600,000.00

Personil Rp 70,355,250.00
non-personil Rp 19,600,000.00
Rp 89,955,250.00
ppn 11% Rp 9,895,077.50
Total Rp 99,850,327.50
aan Air Minum dan Pengelolaan Air Limbah Domestik Provinsi Kalimantan Selatan 2025-2045

PROYEKSI AKSES AM ALD


Uraian JML MM Billing Rate Total
TA PWK 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten Ahli PWK 2 1.5 Rp 7,500,000.00 Rp 22,500,000.00
Surveyor 2 1.5 Rp 3,750,000.00 Rp 11,250,000.00
Rp 70,355,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 2,000,000.00 Rp 2,000,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00
FGD 3 kali Rp 1,500,000.00 Rp 4,500,000.00
Laporan Pendahuluan 3 eks Rp 300,000.00 Rp 900,000.00
laporan Akhir 3 eks Rp 350,000.00 Rp 1,050,000.00
HDD Eksternal 1 pc Rp 950,000.00 Rp 950,000.00
Rp 19,400,000.00

Personil Rp 70,355,250.00
non-personil Rp 19,400,000.00
Rp 89,755,250.00
ppn 11% Rp 9,873,077.50
Total Rp 99,628,327.50
selisih Rp 222,000.00
Rp36,605,250.00
Rp22,500,000.00
Rp11,250,000.00

Rp5,000,000.00
Rp3,000,000.00
Rp8,500,000.00
Rp2,900,000.00

Rp89,755,250.00
Rp9,873,077.50
Rp99,628,327.50

HPS DINAS
Rp 99,850,327.50
Tahun 2019-2022
a. Nama Proyek :-
b. Lokasi Proyek : Provinsi Kalimantan Selatan
c. Pengguna Jasa :-
Balai Prasarana Permukiman Wilayah Kalimantan
d. Nama Perusahaan :
Selatan

Pelaksana teknis program infrastruktur berbasis


e. Uraian Tugas :
masyarakat (IBM) PISEW

f. Waktu Pelaksanaan : 2019-2022


g. Posisi Penugasan : Penata Bangunan Gedung dan Permukiman
h. Status Kepegawaian : Tidak Tetap

Tahun 2017-2019
a. Nama Proyek :-
b. Lokasi Proyek : Provinsi Kalimantan Selatan
c. Pengguna Jasa :-
Satuan Kerja Pengembangan Kawasan Permukiman
d. Nama Perusahaan :
Provinsi Kalimantan Selatan
Pelaksana teknis program infrastruktur berbasis
e. Uraian Tugas :
masyarakat (IBM) PISEW
f. Waktu Pelaksanaan : 2017-2019
g. Posisi Penugasan : Penelaah Bangunan Gedung dan Permukiman
h. Status Kepegawaian : Tidak Tetap

Tahun 2016
a. Nama Proyek : Konsultan Individual
b. Lokasi Proyek : Provinsi Kalimantan Selatan

c. Pengguna Jasa :-
d. Nama Perusahaan : -
e. Uraian Tugas : Analisis spasial & struktur ruang
f. Waktu Pelaksanaan : 2016
g. Posisi Penugasan : Tenaga Ahli Perencana Wilayah dan Kota
h. Status Kepegawaian : Tidak Tetap
Tahun 2022
a. Nama Proyek :
b. Lokasi Proyek :
c. Pengguna Jasa :
d. Nama Perusahaan :

e. Uraian Tugas :

f. Waktu Pelaksanaan :
g. Posisi Penugasan :

Tahun 2021
a. Nama Proyek :
b. Lokasi Proyek :
c. Pengguna Jasa :
d. Nama Perusahaan :
e. Uraian Tugas :

f. Waktu Pelaksanaan :
g. Posisi Penugasan :

Tahun 2019-2020
a. Nama Proyek :
b. Lokasi Proyek :
c. Pengguna Jasa :
d. Nama Perusahaan :

e. Uraian Tugas :
f. Waktu Pelaksanaan :
g. Posisi Penugasan :

Tahun 2017-2019
a. Nama Proyek :
b. Lokasi Proyek :
c. Pengguna Jasa :
d. Nama Perusahaan :

e. Uraian Tugas :
f. Waktu Pelaksanaan :
g. Posisi Penugasan :

Tahun 2016
a. Nama Proyek :
b. Lokasi Proyek :
c. Pengguna Jasa :
d. Nama Perusahaan :
e. Uraian Tugas :
f. Waktu Pelaksanaan :
g. Posisi Penugasan :
Review Studi Kelayakan dan Detail Engineering
Design (DED) Jembatan Sungai Jingah
Kota Banjarmasin
Dinas PUPR Kota Banjarmasin
PT Winaya Konteks Kharisma

Melaksanakan identifikasi kesesuaian pekerjaan


dengan Rencana Tata Ruang Wilayah Kota
Banjarmasin
2022
Tenaga ahli perencana wilayah dan kota

Penyusunan Draft Peraturan Daerah Bangunan


Gedung Kabupaten Tanah Laut
Kabupaten Tanah Laut
Dinas PUPRP Kabupaten Tanah Laut
PT Winaya Konteks Kharisma
Menyusun rancangan peraturan daerah bangunan
gedung di Kabupaten Tanah Laut

2021
Tim leader

-
Provinsi Kalimantan Selatan
-
Balai Prasarana Permukiman Wilayah Kalimantan
Selatan
Pelaksana teknis program infrastruktur berbasis
masyarakat (IBM) PISEW
2019-2022
Penata Bangunan Gedung dan Permukiman

-
Provinsi Kalimantan Selatan
-
Satuan Kerja Pengembangan Kawasan
Permukiman Provinsi Kalimantan Selatan
Pelaksana teknis program infrastruktur berbasis
masyarakat (IBM) PISEW
2017-2019
Penelaah Bangunan Gedung dan Permukiman

Konsultan Individual
Provinsi Kalimantan Selatan
-
-
Analisis spasial & struktur ruang
2016
Tenaga Ahli Perencana Wilayah dan Kota
PENAWARAN

PEKERJAAN SISTEM INFORMASI MONEV BANGUNAN GEDUNG DAN LING


Lama Pekerjaan 45 Hari

Personil
Uraian JML MM Billing Rate Total
Leader 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten web programmer 1 1.5 Rp 9,000,000.00 Rp 13,500,000.00
Surveyor 3 1.5 Rp 3,500,000.00 Rp 15,750,000.00
Rp 65,855,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 1,500,000.00 Rp 1,500,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, bbm,


konsumsi, domain, langganan
server) 1 kali Rp 10,000,000.00 Rp 10,000,000.00
Laporan Pendahuluan 3 eks Rp 250,000.00 Rp 750,000.00
laporan Akhir 3 eks Rp 350,000.00 Rp 1,050,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 24,150,000.00

Personil Rp 65,855,250.00
non-personil Rp 24,150,000.00
Rp 90,005,250.00
ppn 11% Rp 9,900,577.50
Total Rp 99,905,827.50
NEV BANGUNAN GEDUNG DAN LINGKUNGAN BERBASIS APLIKASI

APLIKASI MONEV BG
Uraian JML MM Billing Rate Total
Leader 1 1.5 Rp 24,403,500.00 Rp 36,605,250.00
Asisten web programmer 1 1.5 Rp 9,000,000.00 Rp 13,500,000.00
Surveyor 3 1.5 Rp 3,500,000.00 Rp 15,750,000.00
Rp 65,855,250.00
Non Personil
Transportasi LS 1 Rp 5,000,000.00 Rp 5,000,000.00
ATK LS 1 Rp 1,300,000.00 Rp 1,300,000.00
Komunikasi LS 1 Rp 1,000,000.00 Rp 1,000,000.00
Ekspose 2 kali Rp 2,000,000.00 Rp 4,000,000.00

Lumpsum (transport, bbm,


konsumsi, domain, langganan
server) 1 kali Rp 10,000,000.00 Rp 10,000,000.00
Laporan Pendahuluan 3 eks Rp 225,000.00 Rp 675,000.00
laporan Akhir 3 eks Rp 350,000.00 Rp 1,050,000.00
HDD Eksternal 1 pc Rp 850,000.00 Rp 850,000.00
Rp 23,875,000.00

Personil Rp 65,855,250.00
non-personil Rp 23,875,000.00
Rp 89,730,250.00
ppn 11% Rp 9,870,327.50
Total Rp 99,600,577.50
selisih Rp 305,250.00
Rp36,605,250.00
Rp13,500,000.00
Rp15,750,000.00

Rp5,000,000.00
Rp2,300,000.00

Rp4,000,000.00

Rp10,000,000.00
Rp2,575,000.00

Rp89,730,250.00
Rp9,870,327.50
Rp99,600,577.50

HPS DINAS
Rp 99,905,827.50