4) Action plan to remove problem: 5) Date Complete: 3) Verify which possible cause is a real cause:
Action (Risk Assessement Required - see page 2) Who When Done? What to Check How to Check Findings Cause?
Tali seling keluar dari pulley terjadi saat dancing roller yang bergerak
maksimal saat running TCVN 1210 mm,penyebabnya karena saat tape
bergerak,Driving roller terlambat start sehingga dancing roller bergerak
Icen 12/7/2017 Done 1 Tali seling Lihat posisi tali pada pulley
Keluar dari
Pulley Y □ N□
sampai batas maksimal sehingga terjadi hentakan yang menyebabkan
seling keluar dari pulley.Hentakan ini juga menyebabkan tape sering
putus saat TCVN.
2 Bandul Lihat posisi bandul pada cover Tidak tersangkut Y □ N□
1
Action yang dilakukan dengan cara mengeser maju sensor start driving
roller,sehingga saat tape bergerak driving roller cepat berputar sehingga
menghindari dancing roller bergerak maksimal ( terpentok body rel )
3 Dancing roller Lihat pergerakkan harus lancar Lancar Y □ N□
4 Dancing roller Dancing roller berputar lancar Lancar Y □ N□
5 5 Y □ N□
6 6 Y □ N□
7 7 Y □ N□
RS
• thinking about proposed modifications Remember: occurs. Use the scales shown below; consequence 10 8 6 4 2 You need to make sure you have reduced any risks "so far as is reasonably practical".
• asking fellow employees • Normal running, abnormal conditions (operator should be based on the most likely outcome (not the Compare what you are doing with good practice and if there is a difference list what needs to be done.
• discussing with your safety representative intervention), maintenance activity worst case). Likelihood rating should assume that any 100 1000 800 600 400 200 While completing the action were any further hazards found?
• checking manufacturers instructions • people may not be in the work place all the time existing control measures are in place; "if the task is On completion of the action carry out another risk assessment.
• visitors and contractors done every day; what is the likelihood of injury?" 40 400 320 240 160 80
Don't forget long term risks Say how the hazard could cause harm Multiply the two values to get an overall risk score.
Prioritise hazards with the highest risk score to be dealt 21 210 168 126 84 42
with first.
8 80 64 48 32 16
1 10 8 6 4 2
May cause death <-- 100 (Only on people issues) Inevitable - Many time / year: 10
No part of this publication may be reproduced in any material form (including photocopying or storing it in any medium by electronic means and whether or not transiently or incidentally to