Professional Documents
Culture Documents
Questionnaire-Mbe G-Area-3
Questionnaire-Mbe G-Area-3
1
8. Which of the following occupancy project group / division
does not belong?
a. Libraries c. Seminar Facilities
b. Gymnasia d. Museums
13. What is the total area of the common single size bed?
a. 2.10 sq.m. c. 1.90 sq.m.
b. 1.71 sq.m. d. 2.57 sq.m.
2
sky, deeded, dedicated or otherwise permanently
appropriated for public use?
a. Hallway c. Alley
b. Public way d. Highway
3
SITUATIONAL 06 – PROJECT 06:
26. What is the TOTAL BF of the Commercial for the 4
hectares property?
a. 510 sqm. c. 2,040 sqm.
b. 1,530 sqm. d. 1,020 sqm.
SITUATIONAL 07 – PROJECT 1:
31. What is the area of bedside table?
a. 0.25 sqm. c. 0.50 sqm.
b. 0.30 sqm. d. 0.22 sqm.
4
SITUATIONAL 08 – PROJECT 02:
36. What was the proper zone location of the cistern tank?
a. Institutional c. Commercial
b. Residential d. Industrial
38. What is the technical term for the pipe that provides
drainage for ground water and rainwater from parking lots,
streets and roofs?
a. Waste Sewer c. Storm Sewer
b. PVC d. Metal
40. What was the proper zone location of the septic tank?
a. Institutional c. Commercial
b. Residential d. Industrial
43. What is the AMBF of the project based on NBCP Rule VIII,
Table 8.1 with Firewall?
a. 487.11 sqm. c. 380.40 sqm.
b. 451.66 sqm. d. 349.27 sqm.
44. What is the max ISA of the project based on NBCP Rule
VIII, Table 8.1 with Firewall?
a. 174.63 sqm. c. 58.21 sqm.
b. 524.11 sqm. d. 232.94 sqm.
45. What is the min USA of the project based on NBCP Rule
VIII, Table 8.1 with Firewall?
5
a. 116.42 sqm. c. 58.21 sqm.
b. 524.11 sqm. d. 232.94 sqm.
54. What is the TGFA of the project based on the max PSO and
BHL?
a. 1,231 sqm. c. 1,545.80 sqm.
b. 2,874 sqm. d. 3,714 sqm.
6
55. What is the TOSL of the project based on NBCP Rule VIII,
Table 8.1 with firewall?
a. 495.20 sqm. c. 352 sqm.
b. 750 sqm. d. 504.65 sqm.
7
b. 312.28 sqm. d. 675 sqm.
65. What is the TGFA of the project based on the max PSO and
BHL?
a. 445.50 sqm. c. 578.80 sqm.
b. 419.50 sqm. d. 765.40 sqm.
68. As per NBCP Rule VIII Table 8.1, what is the AMBF with
firewalls of the project?
a. 723.10 sqm. c. 855.72 sqm.
b. 798.46 sqm. d. 626.81 sqm.
69. As per NBCP Rule VIII Table 8.1, what is the maximum ISA
with firewalls?
a. 290.45 sqm. c. 155.67 sqm.
b. 125.32 sqm. d. 226.60 sqm.
70. As per NBCP Rule VIII Table 8.1, what is the minimum USA
with firewalls?
a. 290.45 sqm. c. 155.67 sqm.
b. 113.30 sqm. d. 263.98 sqm.
73. Which side of the structure will be exposed to the sun for
approximately 8 months?
a. North c. East
b. South d. West
8
b. East d. West
82. As per NBCP Rule VIII Table 8.1, what is the minimum USA
with firewalls?
a. 290.45 sqm. c. 155.67 sqm.
b. 371.40 sqm. d. 247.60 sqm.
9
84. What is the RMax ISA of the project?
a. 290.45 sqm. c. 155.67 sqm.
b. 371.40 sqm. d. 247.60 sqm.
10
94. A horizontal transparent element between rows of windows
in successive storms, this glass is designed as an external
opaque covering for back-up walls or structural elements.
a. Safety Glass c. Fusion Glass
b. Spandrel Glass d. Toughened Glass
11
102. What is the MACA of the project?
a. 873.51 sqm. c. 1,091.89 sqm.
b. 523.90 sqm. d. 1,048.21 sqm.
105. What is the Maximum TGFA of the project based on BHL / PSO?
a. 873.51 sqm. c. 1,091.89 sqm.
b. 524.11 sqm. d. 1,047.81 sqm.
12
a. Exterior Walls c. Party Walls
b. Firewall d. Abutment Walls
13
118. The space planning, Architectural lay outing and
utilization of spaces within and surrounding a specific
building/structure in relation with the existing natural
and/or built environment have to be a well-coordinated
effort so that the building/structure and the host
environment shall act as one.
a. Site Design c. Site Utilization
b. Site Planning d. Site Devt. Planning
120. Shows the slope and contour of the land as well as other
natural and artificial features; show locations and
elevations of natural as well as man-made features, relief
and vegetation; shows limited set of features including
terrain, streams, boundaries and roads.
a. Topographic Map c. Contour Lines
b. Contour Intervals d. Contour Elevation
14
b. 854.21 sqm. d. 923.93 sqm.
15
b. 80% d. 60%
16
145. What should be the Archetype for a Government Office
Building?
a. Modern with Clean lines c. Colorful & Inviting
b. Warm & Relaxed d. Informal & Carefree
17
154. Based on PD 1096 or the National Building Code of the
Philippines, Rule VII section 806, what is the minimum air
space for Habitable Rooms?
a. 12 cum./ person c. 3 cum. / person
b. 14 cum. / person d. 6 cum. / person
155. Rooms intended for any use, not provided with artificial
ventilation system, shall be provided with a window or
windows with a total free area of openings equal to at least
__% of the floor area of the room.
a. 10% c. 5%
b. 20% d. 15%
18
163. When formed steel decking is a part of the composite
beam, the spacing of stud shear connector along the length
of the supporting beam or girder shall not exceed _______mm.
a. 500 mm. c. 900 mm.
b. 800 mm. d. 750 mm.
165. What is the typical depth of lintel beams above and below
windows?
a. 300mm c. 200mm
b. 150mm d. 450mm
19
172. What is the best style for a Government Building if there
is a limited budget?
a. Neo-classical c. International Style
b. Modern d. Mediterranean
20
180. As per RA 9514, a document issued by the BFP as a
prerequisite for the grant of Certificate of Occupancy,
Business Permit, Certificate of Annual Inspection from PEZA
and other licenses and permits being issued by other
government agencies upon determining that the required fire
safety construction are in place, and fire protective and/
or warning systems are properly installed in accordance with
the approved plans and specifications and in compliance with
RA 9514 and its RIRR.
a. FSEC c. FSMR
b. FSIC d. FSCCR
21
b. 0.70 - 1.20 d. 1.50
22
194. If you select a sanitary fitting for this project, which
brand would you not select?
a. Kohler c. Karat
b. Toto d. Whirlpool
195. Which should not be used for its water main pipe?
a. Galvanized Iron c. Ceramic
b. Stainless Steel d. PVC
23
PROJECT 01:
PROPOSED BUNGALOW RESIDENTIAL BUILDING
PROJECT 02:
PROJECT 03:
24
Proposed Family Rest House-Two Storey Single Attached
Residential Building WITH Attic and Swimming Pool.
PROJECT 04:
A PROPOSED MULTI-LEVEL PARKING BUILDING
Design Objectives:
a. To maximize the Client’s profit for the Project
Proponent
25
b. To plan/design a building that serve as a landmark in
the Project area with a sustainable least-cost.
DESIGN REQUIREMENTS:
Ground Floor:
PROVINCIAL ENGINEERING OFFICE
ENVIRONMENT & NATURAL RESOURCES OFFICE
PROVINCIAL EQUIPMENT POOL OFFICE
PROVINCIAL COOPERATIVE OFFICE
PROVINCIAL TOURISM OFFICE
PROVINCIAL EMPLOYMENT, SPORTS, CULTURE & ARTS FOR YOUTH
DEVELOPMENT OFFICE
26
PROVINCIAL DISASTER RISK REDUCTION & MANAGEMENT OFFICE
PROVINCIAL LEGAL OFFICE
OFFICE OF THE PROVINCIAL INTERNAL AUDIT SERVICES
PROVINCIAL WARDEN’S DIVISION
PROVINCIAL HUMAN RESOURCE MANAGEMENT OFFICE
PROVINCIAL PLANNING & DEVELOPMENT OFFICE
PROVINCIAL ASSESSOR’S OFFICE
PROVINCIAL HEALTH OFFICE
PROVINCIAL SOCIAL WELFARE & DEVELOPMENT OFFICE
PROVINCIAL AGRICULTURE OFFICE
PROVINCIAL GENERAL SERVICES OFFICE
Second Floor:
OFFICE OF THE PROVINCIAL GOVERNOR
COMMUNICATION DIVISION
PUBLIC AFFAIRS INFORMATION ASSISTANCE DIVISION
INVESTMENT PROMOTION DIVISION
SANGGUNIANG PANLALAWIGAN OFFICE
OFFICE OF THE PROVINCIAL ADMINISTRATOR
PROVINCIAL BUDGET OFFICE
PROVINCIAL ACCOUNTING OFFICE
PROVINCIAL TREASURY OFFICE
27
There will be warehouses, 1st will be for 28m x 40m and the
2nd one is for 28m x 30m area. There’s a 200 square meter motor
pool, a truck parking for 8m x 85m area, loading/unloading for
640 square meters, and a generator and utility room for 8m x
10m. Up ahead is a single storey 300 square meter staff/driver’s
house.
These requirements have been done to the expansion and will also
be done to the new acquired one-hectare adjacent lot.
28