BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
I PRELIMINARY
1/84
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
9. Local Transport
a Bus unit(s) 1 60,000,000 60,000,000
b Mini Bus unit(s) 1 33,000,000 33,000,000
c Colt Diesel / Light Truck / Pick-up unit(s) 1 21,000,000 21,000,000
- Labour
2/84
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
a safety helmet, safety shoes, helmet, gloves, mask, google set(s) 72 1,000,000 72,000,000
II PILING WORK
(Conforming to Project Standard: PMO-LGEN-K107,
PMO-LGEN-K117 and PMO-LGEN-K118)
Driving of Pile by using Diesel Hammer up to the
1.
required level for:
1.1 450-mm dia. concrete spun piles
- in area of 135- ETP m 52,920 45,000 2,381,400,000 B
3/84
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
- in area of 296- TG9, TG10, Compressed Air and GIS point(s) 1 12,500,000 12,500,000
- in area of 296- TG9, TG10, Compressed Air and GIS point(s) 1 12,500,000 12,500,000
4/84
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
5/84
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
I PRELIMINARY
6/84
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
j Theodolite unit(s) - - -
k Auto Level unit(s) 2 - -
l Other necessary equipment and tools Lot - -
- Service Crane unit(s) 3 ### ###
- Dolly Truck unit(s) - - -
- Electrode Baking Oven unit(s) 1 - -
- Electrode Holding Oven unit(s) 10 - -
- Fuel Tank Truck unit(s) 1 -
- Steel Plate 1.5 x 6 M x 20 Mm unit(s) 25 - -
Rp 820,000,000
9. Local Transport
a Bus unit(s) 1 ### ###
b Mini Bus unit(s) 1 ### ###
c Colt Diesel / Light Truck / Pick-up unit(s) 1 ### ###
- Labour
7/84
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
Jamsostek Lot 1 ### ###
Swab Test, MCU persons 72 ### ###
- Insurance of Equipment at site Lot 1 ### ###
a safety helmet, safety shoes, helmet, gloves, mask, google set(s) 72 ### ###
II PILING WORK
(Conforming to Project Standard: PMO-LGEN-K107,
PMO-LGEN-K117 and PMO-LGEN-K118)
Driving of Pile by using Diesel Hammer up to the
1.
required level for:
1.1 450-mm dia. concrete spun piles
- in area of 135- ETP m 52,920 ### ### B
8/84
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
Rp 507,150,000
Perform High Strain Dynamic Load Test or PDA Test
4.
on the installed pile:
4.1 600-mm dia. concrete spun piles
in area of 474- Recausticizing point(s) 1 ### ###
- in area of 296- TG9, TG10, Compressed Air and GIS point(s) 1 ### ###
- in area of 296- TG9, TG10, Compressed Air and GIS point(s) 1 ### ###
Rp 200,000,000
9/84
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
Total Amou
No. Description Unit Quantity
Rate nt Remarks
[IDR] [IDR]
PT. MASTERPANCANG PONDASI
10/84
CONSTRUCTION SCHEDULE FOR DIESEL HAMMER GROUP B (PACKAGE 8)
PT MASTERPANCANG PONDASI
Durati Februari/21 Maret/21 April/21 May/21 June/21
on Persen Persen/
No. Description Quantity Unit Price Remarks
(days (%) Days (%) 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
)
I PRELIMINARY
1 Mobilization of all personnel and 72 person( 1 ### 1.21% 1.21% ###
manpower, provide skill, and unskill s)
manpower for execution of work
2 Mobilization of all required equipment, 70 unit(s) 7 ### 9.18% 1.31% ### ### ### ### ### ### ###
tools and materials to carry out the work
and to maintain them until job completion
5 Setting out Board Machine area 67 ### 43.55% 0.65% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
II PILING WORK
1 Supplying pile from RAPP is carried out 2
days before the driving of pile
1 ETP (spun piles, 450 mm dia., 59 5 nos/unit/day
L = 36 m (12+12+12), Q
5 nos/unit/day
= 1470 nos)
5 nos/unit/day
5 nos/unit/day
5 nos/unit/day
- Driving of Pile 52,920 m ### 26.65% 0.45% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 24 24 24 24 24 24 24
- Driving of Dolly 2,205 m ### 1.11% 0.02% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 6 6 6 6 6 6 6
- Welding of Pile's Joint 2,940 point(s) 0.10%
### 5.68% ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
1470 nos)
IV PILE SHIFTING
Provision for shifting the Diesel Hammer
between one location to another location
within RAPP mill complex by using lowbed
trailer, mobile crane, and trailer trucks as Rate Only 100%
directed by the engineer
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
PLAN PROGRESS DAILY ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
90%
PLAN PROGRESS ACCUMULATION ### 100%
NO.
DETAIL OF UNIT OF Note: Jakarta, 15th February 2021
RIG PT Masterpancang Pondasi
D1 : Tripodal Crane DHP-80 + Diesel Hammer DD6.5 unit 1 unit Safe Spare Time 80%
D2 : Tripodal Crane DHP-80 + Diesel Hammer DD6.5 unit 2 unit
D3 : Tripodal Crane P&H 85P + Diesel Hammer DD6.5 unit 3 unit
XY
D4 : Tripodal Crane P&H 85P + Diesel Hammer DD6.5 unit 4 unit X: Equipment used
-Z
D5 : Tripodal Crane P&H 85P + Diesel Hammer DD6.5 unit 5 unit - D refers to Diesel Hammer
S55-1 : Service Crane SANY SCC-550A unit 1 unit - P refers to Piling Pontoon Ir. Yung Iskandar
S55-2 : Service Crane SANY SCC-550A unit 2 unit Y: See the detail of unit General Manager
70%
Z: Sequences of unit work
60%
50%
40%
30%
20%
10%
0%
FL3B PROJECT
PT. RIAU ANDALAN PULP AND PAPER
PANGKALAN KERINCI, PELALAWAN, RIAU, SUMATERA
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
I PRELIMINARY 100%
a. Site management & supervisory staff person(s) 7 3 0.12% 0.05% 0.02% 0.05%
b. Supervisors person(s) 5 1 0.09% 0.09%
c. Operators person(s) 8 2 0.14% 0.03% 0.10%
d. QA & QC Engineer person(s) 2 1 0.03% 0.03%
e. Safety Officers person(s) 2 1 0.03% 0.02% 0.02%
f. Skilled and Unskilled manpower person(s) 48 2 0.82% 0.09% 0.74%
70%
Establish and maintain during the entire period of stay at
site contractor's all temporary facilities such as container 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5. Lot 1 75
office, workshop, fabrication area, store, sanitary facilities,
temporary water & electrical supplies, etc.
Provision of site management & supervisory staff, as per 15 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09% 1.09%
8. person(s) 72 16.35%
requirement of the services
a Site management & supervisory staff person(s) 7 5
b Supervisors person(s) 5 5
c Operators person(s) 8 5
d QA & QC Engineer person(s) 2 5
e Safety Officers person(s) 2 5 50%
f Skilled and Unskilled manpower person(s) 48 5
9. Local Transport
a Bus unit(s) 1 69 0.68% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
b Mini Bus unit(s) 1 69 0.38% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
c Colt Diesel / Light Truck / Pick-up unit(s) 1 69 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Loading and unloading of materials from logistic store to 21.14% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31%
10. Lot 52920 69
contractor's fabrication workshop and to job site location
11. Provision & implementation of SMK3 Lot 1 10 0.11% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 40%
- Labour
Jamsostek Lot 1 2 0.17% 0.09% 0.09%
Swab Test, MCU persons 72 4 1.97% 0.08% 0.03% 0.03% 0.19% 1.64%
- Insurance of Equipment at site Lot 1 2 0.86% 0.43% 0.43%
a safety helmet, safety shoes, helmet, gloves, mask, google set(s) 72 4 0.82% 0.03% 0.01% 0.01% 0.08% 0.68%
II PILING WORK
20%
(Conforming to Project Standard: PMO-LGEN-K107,
PMO-LGEN-K117 and PMO-LGEN-K118)
Driving of Pile by using Diesel Hammer up to the
1.
required level for:
1.1 450-mm dia. concrete spun piles m 52920 69 27.19% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.39% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37%
25 25 25 25 25 25 25 25 25 25 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Driving of Dolly by using Diesel Hammer on the 25 50 75 100 125 150 175 200 225 250 271 292 313 334 355 376 397 418 439 460 481 502 523 544 565 586 607 628 649 670 691 712 733 754 775 796 817 838 859 880 901 922 943 964 985 1006 1027 1048 1069 1090 1110 1130 1150 1170 1190 1210 1230 1250 1270 1290 1310 1330 1350 1370 1390 1410 1430 1450 1470
2.
following piles:
2.1 450-mm dia. concrete spun piles 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69
- in area of 135- ETP m 2205 69 1.13% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
PLAN PROGRESS DAILY 100.00% 0.17% 0.00% 0.00% 0.00% 0.44% 0.44% 0.00% 0.17% 0.15% 0.75% 1.84% 1.84% 1.89% 1.13% 0.98% 0.98% 0.96% 0.96% 0.96% 0.43% 0.43% 3.43% 0.00% 0.69% 0.00% 0.23% 0.23% 0.00% 0.91% 0.91% 0.91% 0.91% 0.91% 0.91% 0.00% 0.91% 0.91% 0.91% 0.91% 0.82% 0.82% 0.00% 1.91% 1.91% 1.91% 0.82% 0.00% 0.82% 0.00% 0.82% 0.82% 0.82% 0.82% 0.82% 1.10% 0.00% 0.82% 0.82% 0.82% 0.82% 0.82% 0.82% 0.00% 0.82% 0.82% 0.82% 0.82% 0.82% 0.82% 0.00% 0.82% 0.82% 1.91% 1.91% 1.91% 0.00% 0.00% 0.82% 0.82% 0.82% 0.82% 0.82% 0.82% 0.00% 0.82% 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.82% 0.82% 0.79% 0.00% 0.79% 0.79% 0.00% 0.79% 1.88% 1.88% 0.00% 1.88% 0.00% 0.79% 0.79% 0.79% 0.79% 0.00% 0.79% 0.79% 0.79% 0.79% 0.79% 0.79% 0.00% 0.79% 0.79% 1.11% 1.11% 1.82% 1.82% 1.82% 1.82% 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 1.09% 1.09% 1.28%
PLAN PROGRESS ACCUMULATION 0.2% 0.2% 0.2% 0.2% 0.6% 1.0% 1.0% 1.2% 1.4% 2.1% 4.0% 5.8% 7.7% 8.8% 9.8% 10.8% 12% 13% 14% 14% 15% 18% 18% 19% 19% 19% 19% 19% 20% 21% 22% 23% 24% 25% 25% 25% 26% 27% 28% 29% 30% 30% 32% 34% 36% 36% 36% 37% 37% 38% 39% 40% 40% 41% 42% 42% 43% 44% 45% 46% 46% 47% 47% 48% 49% 50% 51% 51% 52% 52% 53% 54% 56% 58% 60% 60% 60% 60% 61% 62% 63% 64% 64% 64% 65% 66% 66% 66% 66% 66% 66% 66% 66% 66% 67% 68% 68% 68% 69% 70% 70% 71% 73% 75% 75% 76% 76% 77% 78% 79% 80% 80% 80% 81% 82% 83% 84% 84% 84% 85% 86% 87% 88% 90% 92% 94% 95% 97% 97% 97% 97% 97% 97% 98% 99% 100%
ACTUAL PROGRESS DAILY 0.17% 0.00% 0.00% 0.00% 0.44% 0.44% 0.00% 0.10% 0.16% 0.50% 1.59% 1.59% 1.64% 0.94% 0.59% 0.59% 0.59% 0.59% 0.59% 0.67% 0.87% 2.23% 1.97% 0.59% 0.59% 0.48% 0.00% 0.00% 0.94% 0.25% 0.02% 0.06% 0.08% 0.19% 0.34% 0.17% 0.28% 0.52% 0.42% 0.36% 0.02% 0.56% 1.77% 2.20% 2.04% 0.96% 0.95% 1.21% 1.33% 1.17% 1.00% 0.89% 1.19% 1.40% 0.88% 0.00% 1.68% 1.47% 1.39% 1.11% 1.21% 0.02% 1.21% 0.89% 0.91% 0.89% 0.97% 1.16%
ACTUAL PROGRESS ACCUMULATION 0.2% 0.2% 0.2% 0.2% 0.6% 1.1% 1.1% 1.2% 1.3% 1.8% 3.4% 5.0% 6.6% 7.6% 8.2% 8.7% 9.3% 9.9% 10.5% 11.2% 12.0% 14.3% 16.2% 16.8% 17.4% 17.9% 17.9% 17.9% 18.8% 19.1% 19.1% 19.2% 19.3% 19.4% 19.8% 19.9% 20.2% 20.7% 21.2% 21.5% 21.6% 22.1% 23.9% 26.1% 28.1% 29.1% 30.0% 31.2% 32.6% 33.7% 34.7% 35.6% 36.8% 38.2% 39.1% 39.1% 40.8% 42.2% 43.6% 44.7% 46.0% 46.0% 47.2% 48.1% 49.0% 49.9% 50.9% 52.0%
DEVIATION 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% -0.1% -0.1% -0.3% -0.6% -0.8% -1.1% -1.2% -1.6% -2.0% -2.4% -2.8% -3.2% -2.9% -2.5% -3.7% -1.7% -1.8% -1.2% -1.0% -1.2% -1.2% -1.2% -1.8% -2.7% -3.6% -4.4% -5.1% -4.8% -5.5% -6.2% -6.5% -7.0% -7.5% -8.3% -7.7% -7.8% -7.6% -7.4% -7.3% -6.3% -5.9% -4.6% -4.2% -4.1% -4.0% -3.6% -3.0% -3.3% -3.3% -2.4% -1.7% -1.2% -0.9% -0.5% -1.3% -0.1% 0.0% 0.1% 0.2% 0.3% 0.7%
APPROVED BY PROPOSED BY
PT. RIAU ANDALAN PULP AND PAPER PT. MASTERPANCANG PONDASI
BILLS OF QUANTITIES
PILING WORKS - Diesel Hammer Group B
Duration(d Persen
No. Description Unit Qty.
ays) (%) 2/15/21 2/16/21 2/17/21
I PRELIMINARY
9. Local Transport
a Bus unit(s) 1 69 0.68%
b Mini Bus unit(s) 1 69 0.38%
c Colt Diesel / Light Truck / Pick-up unit(s) 1 69 0.24%
- Labour
Jamsostek Lot 1 2 0.17%
Swab Test, MCU persons 72 4 1.97% 0.08%
- Insurance of Equipment at site Lot 1 2 0.86%
a safety helmet, safety shoes, helmet, gloves, mask, google set(s) 72 4 0.82% 0.03%
II PILING WORK
(Conforming to Project Standard: PMO-LGEN-K107,
PMO-LGEN-K117 and PMO-LGEN-K118)
Driving of Pile by using Diesel Hammer up to the
1.
required level for:
1.1 450-mm dia. concrete spun piles m 52920 69 27.19%
0.02%
0.03%
0.03% 0.05%
0.02% 0.02%
0.08% 0.03% 0.23%
0.09% 0.09%
0.03% 0.03% 0.19% 1.64%
0.43% 0.43%
0.07%
0.00% 0.44% 0.44% 0.00% 0.10% 0.16% 0.50% 1.59% 1.59% 1.64% 0.94% 0.59% 0.59% 0.59% 0.59% 0.59% 0.67% 0.87% 2.23%
0.2% 0.6% 1.1% 1.1% 1.2% 1.3% 1.8% 3.4% 5.0% 6.6% 7.6% 8.2% 8.7% 9% 10% 11% 11% 12% 14%
Maret/21
3/9/21 3/10/21 3/11/21 3/12/21 3/13/21 3/14/21 3/15/21 3/16/21 3/17/21 3/18/21 3/19/21 3/20/21 3/21/21 3/22/21 3/23/21 3/24/21 3/25/21 3/26/21 3/27/21
0.05%
0.03% 0.03%
0.03%
0.03%
0.48%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.23% 0.23%
0.57%
0.11%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.68%
0.05%
0.03%
0.04% 0.05% 0.14% 0.29% 0.12% 0.19% 0.43% 0.34% 0.29% 0.00%
71 95 282 566.5 239 376.3 842 664.3 568.5 0
1 2 3 4 5 6 7 8 9 10
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 6 18 36 15 24 53 42 36 0
0.01% 0.01% 0.02% 0.05% 0.02% 0.03% 0.07% 0.06% 0.05% 0.00%
1.97% 0.59% 0.59% 0.48% 0.00% 0.00% 0.94% 0.25% 0.02% 0.06% 0.08% 0.19% 0.34% 0.17% 0.28% 0.52% 0.42% 0.36% 0.02%
16% 17% 17% 18% 18% 18% 19% 19% 19% 19% 19% 19% 20% 20% 20% 21% 21% 22% 22%
April/21
3/28/21 3/29/21 3/30/21 3/31/21 4/1/21 4/2/21 4/3/21 4/4/21 4/5/21 4/6/21 4/7/21 4/8/21 4/9/21 4/10/21 4/11/21 4/12/21 4/13/21 4/14/21 4/15/21
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.09% 1.09% 1.09%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.11% 0.27% 0.45% 0.38% 0.38% 0.39% 0.49% 0.55% 0.48% 0.40% 0.35% 0.48% 0.57% 0.35% 0.00% 0.69% 0.60% 0.57% 0.45%
276 672 1116 948 960 984 1224 1380 1200 1008 888 1212 1428 888 0 1716 1500 1416 1116
0.39% 0.34% 0.55% 0.47% 0.48% 0.48% 0.60% 0.67% 0.57% 0.49% 0.44% 0.59% 0.69% 0.43% 0.00% 0.84% 0.73% 0.69% 0.55%
752 658 1079.5 913 924.7 934 1165.5 1302.5 1114.5 954 855 1155.5 1350 846 0 1629.5 1421.5 1345 1076.5
4457 5115 6194 7107 8032 8966 10131 11434 12548 13502 14357 15513 16863 17709 17709 19338 20760 22105 23181
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
48 42 67 57 60 61 76 85 73 61 52 71 85 53 0 101 88 83 64
0.06% 0.06% 0.09% 0.07% 0.08% 0.08% 0.10% 0.11% 0.10% 0.08% 0.07% 0.09% 0.11% 0.07% 0.00% 0.13% 0.12% 0.11% 0.08%
0.56% 1.77% 2.20% 2.04% 0.96% 0.95% 1.21% 1.33% 1.17% 1.00% 0.89% 1.19% 1.40% 0.88% 0.00% 1.68% 1.47% 1.39% 1.11%
22% 24% 26% 28% 29% 30% 31% 33% 34% 35% 36% 37% 38% 39% 39% 41% 42% 44% 45%
April/21
4/16/21 4/17/21 4/18/21 4/19/21 4/20/21 4/21/21 4/22/21 4/23/21 4/24/21 4/25/21 4/26/21 4/27/21 4/28/21 4/29/21 4/30/21 5/1/21 5/2/21 5/3/21 5/4/21
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.09% 1.09% 1.09%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.49% 0.00% 0.50% 0.35% 0.36% 0.35% 0.39% 0.47% 0.15% 0.00% 0.00% 0.40% 0.43% 0.32% 0.00% 0.00% 0.00% 0.00% 0.00%
1224 0 1248 888 912 888 972 1176 372 0 0 1008 1080 792 0 0 0 0 0
0.61% 0.00% 0.62% 0.45% 0.46% 0.44% 0.49% 0.58% 0.18% 0.00% 0.00% 0.52% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1188 0 1213 872 891 859.5 945.5 1135 351 0 0 1018.5 0 0 0 0 0 0 0
24369 24369 25582 26454 27345 28205 29150 30285 30636 30636 31655 31655 31655 31655 31655 31655
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
70 0 71 50 52 51 55 67 22 0 0 56 60 44 0 0 0 0 0
0.09% 0.00% 0.09% 0.07% 0.07% 0.07% 0.07% 0.09% 0.03% 0.00% 0.00% 0.07% 0.08% 0.06% 0.00% 0.00% 0.00% 0.00% 0.00%
1.21% 0.02% 1.21% 0.89% 0.91% 0.89% 0.97% 1.16% 0.38% 0.00% 0.02% 1.02% 1.62% 1.49% 1.11% 0.00% 0.00% 0.02% 0.02%
46% 46% 47% 48.1% 49.0% 49.9% 50.9% 52.0% 52.4% 52.4% 52.4% 53.4% 55.1% 56.6% 57.7% 57.7% 57.7% 57.7% 57.7%
May/21
5/5/21 5/6/21 5/7/21 5/8/21 5/9/21 5/10/21 5/11/21 5/12/21 5/13/21 5/14/21 5/15/21 5/16/21 5/17/21 5/18/21 5/19/21 5/20/21 5/21/21 5/22/21 5/23/21
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0 0 0 0 0 0 0 0 0 0 0
44 45 46 47 48 49 50 51 52
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0 0 0 0 0 0 0 0 0 0 0
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.02% 0.02% 0.02% 0.02% 0.00% 0.02% 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.02% 0.02% 0.00%
57.7% 57.8% 57.8% 57.8% 58% 58% 58% 58% 58% 58% 58% 58% 58% 58% 58% 58% 58% 58% 58%
APPROVED BY
PT. RIAU ANDALAN PULP A
(..............................
5/24/21 5/25/21 5/26/21 5/27/21 5/28/21 5/29/21 5/30/21 5/31/21 6/1/21 6/2/21 6/3/21 6/4/21 6/5/21 6/6/21 6/7/21 6/8/21 6/9/21 6/10/21 6/11/21
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.09% 1.09% 1.09%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
31655 31655 31655 31655 31655 31655 31655 31655 31655 31655 31655 31655 31655 31655 31655
53 54 55 56 57 58 59 60 61 62 63 64 65 66 67
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.02% 0.02% 0.00% 0.02% 1.11% 1.11% 0.00% 1.11% 0.00% 0.02% 0.02% 0.02% 0.02% 0.00% 0.02% 0.02% 0.02% 0.02% 0.02%
58% 58% 58% 58% 59% 60% 60% 61% 61% 61% 61% 61% 61% 61% 61% 61% 61% 62% 62%
APPROVED BY
DALAN PULP AND PAPER
.......................... )
June/21
6/12/21 6/13/21 6/14/21 6/15/21 6/16/21 6/17/21 6/18/21 6/19/21 6/20/21 6/21/21 6/22/21 6/23/21 6/24/21 6/25/21 6/26/21 6/27/21 6/28/21 6/29/21 6/30/21
0.12%
0.09%
0.14%
0.03%
0.03%
0.82%
0 0 0 0
68 69 70
0.00% 0.00% 0.00% 0.00%
0 0 0 0
0.00% 0.00% 0.00% 0.00%
0.02% 0.00% 0.02% 0.02% 1.11% 1.11% 1.82% 1.82% 1.82% 1.82% 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 1.09% 1.09% 1.28%
62% 62% 62% 62% 63% 64% 66% 67% 69% 71% 72% 72% 72% 72% 72% 72% 73% 74% 76%
PROPOSED BY
PT. MASTERPANCANG PONDASI
ONDASI
an)
ger
DIESEL HAMMER RECORD
Driving by
Pay Length Number of
Progress of Works dolly
[m] joints
[m]
Up To Last Period 5114.6 0 324
This Period 18066.70 0 1137.00
Up To This Period 23181.30 0 1461.00
(…........................................) (….......................................)
SP10
SP100
SP101
SP102
SP103
SP104
SP107
SP108
SP109
SP11
SP110
SP111
SP112
SP113
SP114
SP115
SP12
SP13
SP131
SP132
SP138
SP139
SP14
SP140
SP141
SP15
SP157
SP158
SP159
SP16
SP17
SP177
SP186
SP187
SP2
SP225
SP226
SP23
SP24
SP25
SP26
SP26A
SP27
SP28
SP29
SP3
SP30
SP31
SP32
SP33
SP34
SP35
SP4
SP41
SP42
SP43
SP44
SP45
SP46
SP47
SP48
SP49
SP5
SP50
SP51
SP52
SP53
SP573
SP6
SP62
SP63
SP64
SP65
SP66
SP663
SP67
SP68
SP69
SP7
SP70
SP71
SP72
SP73
SP74
SP75
SP76
SP77
SP78
SP79
SP9
SP93
SP94
SP95
SP96
SP97
SP98
SP99
SP1017
SP1018
SP1019
SP1020
SP1021
SP1022
SP1023
SP1024
SP1025
SP1026
SP1027
SP1028
SP1029
SP1045
SP1046
SP1047
SP1048
SP1049
SP105
SP1050
SP1051
SP1052
SP1053
SP1054
SP1055
SP1056
SP1057
SP1058
SP1059
SP106
SP1060
SP1061
SP1062
SP1063
SP1064
SP1065
SP1066
SP1067
SP1068
SP1069
SP1070
SP1071
SP1072
SP116
SP117
SP118
SP1184
SP1185
SP1186
SP119
SP120
SP121
SP122 4/18
SP123 4/23
SP124
SP125
SP126
SP127
SP128
SP129
SP130
SP133
SP134
SP135
SP136
SP137
SP142
SP143
SP144
SP145
SP146
SP147
SP148
SP149
SP150
SP151
SP152
SP153
SP154
SP155
SP156
SP160
SP161
SP162
SP163
SP164
SP165
SP166
SP167
SP168
SP169
SP170
SP171
SP172
SP173
SP174
SP175
SP176
SP178
SP179
SP18
SP180
SP181
SP182
SP183
SP184
SP185
SP188
SP189
SP19
SP190
SP191
SP192
SP193
SP194
SP195
SP196
SP197
SP198
SP199
SP20
SP200
SP201
SP202
SP203
SP204
SP205
SP206
SP207
SP208
SP209
SP21
SP210
SP211
SP212
SP213
SP214
SP215
SP218
SP219
SP22
SP220
SP221
SP222
SP223
SP224
SP227
SP228
SP229
SP230
SP231
SP232
SP233
SP234
SP235
SP236
SP237
SP238
SP239
SP240
SP241
SP242
SP243
SP244
SP245
SP246
SP247
SP248
SP249
SP250
SP251
SP252
SP253
SP254
SP255
SP256
SP257
SP258
SP259
SP260
SP261
SP262
SP263
SP272
SP273
SP274
SP275
SP276
SP277
SP278
SP279
SP280
SP281
SP282
SP283
SP284
SP285
SP286
SP287
SP288
SP289
SP290
SP291
SP292
SP293
SP294
SP295
SP296
SP297
SP298
SP299
SP300
SP301
SP302
SP303
SP304
SP305
SP306
SP307
SP308
SP309
SP310
SP311
SP312
SP313
SP314
SP315
SP316
SP317
SP318
SP319
SP320
SP321
SP322
SP332
SP333
SP334
SP335
SP336
SP337
SP338
SP339
SP340
SP341
SP342
SP343
SP344
SP345
SP346
SP347
SP348
SP349
SP350
SP351
SP352
SP353
SP354
SP355
SP356
SP357
SP358
SP359
SP36
SP360
SP361
SP362
SP363
SP364
SP365
SP366 4/23
SP497 4/24
SP367
SP368
SP369
SP37
SP370
SP371
SP372
SP373
SP374
SP375
SP376
SP377
SP378
SP379
SP38
SP380
SP381
SP39
SP392
SP393
SP395
SP396
SP397
SP398
SP399
SP40
SP400
SP401
SP402
SP403
SP404
SP405
SP406
SP407
SP408
SP409
SP410
SP411
SP412
SP413
SP414
SP415
SP416
SP417
SP418
SP419
SP420
SP421
SP422
SP423
SP425 4/23
SP424 4/24
SP426 4/23
SP495 4/24
SP427
SP428
SP429
SP430
SP431
SP432
SP433
SP434
SP435
SP436
SP437
SP438
SP439
SP440
SP441
SP442
SP456
SP459
SP460
SP461
SP462
SP463
SP464
SP465
SP466
SP467
SP468
SP469
SP470
SP471
SP472
SP473
SP474
SP475
SP476
SP477
SP478
SP479
SP480
SP481
SP482
SP483
SP484
SP485
SP486
SP487
SP488
SP489
SP491
SP561
SP492
SP493
SP494
SP498
SP496
SP499
SP500
SP501
SP502
SP503
SP504
SP505
SP506
SP507
SP508
SP509
SP510
SP511
SP512
SP513
SP514
SP515
SP528
SP531
SP532
SP533
SP534
SP535
SP536
SP537
SP538
SP539
SP54
SP546
SP547
SP548
SP549
SP55
SP550
SP551
SP552
SP553
SP554
SP555
SP556
SP557
SP558
SP559
SP56
SP560
SP650
SP649
SP563
SP564
SP565
SP566
SP57
SP570
SP571 4/3
SP572 4/27
SP574
SP575
SP576
SP577
SP578
SP579
SP58
SP580
SP581
SP582
SP583
SP584
SP585
SP586
SP587
SP588
SP589
SP59
SP60
SP61
SP611
SP612
SP613
SP614
SP615
SP616
SP617
SP618
SP619
SP620
SP629
SP630
SP631
SP632
SP633
SP634
SP635
SP636
SP637
SP638
SP639
SP640
SP641
SP642
SP643
SP644
SP645
SP646
SP647
SP648
SP490 4/8
SP562 4/8
SP651
SP652
SP653
SP654
SP660
SP664
SP665
SP666
SP667
SP668
SP669
SP670
SP671
SP672
SP673
SP674
SP675
SP676
SP677
SP678
SP679
SP701
SP702
SP703
SP704
SP705
SP706
SP707
SP708
SP709
SP710
SP719
SP720
SP721
SP722
SP723
SP724
SP725
SP726
SP727
SP728
SP729
SP730
SP731
SP732
SP733
SP734
SP735
SP736
SP737
SP738
SP739
SP740
SP741
SP742
SP743
SP744
SP754
SP755
SP756
SP757
SP758
SP760
SP761
SP762
SP763
SP764
SP765
SP766
SP767
SP768
SP769
SP770
SP771
SP772
SP798
SP796
SP797
SP799
SP8
SP80
SP800
SP801
SP802
SP803
SP804
SP805
SP806
SP807
SP808
SP809
SP81
SP810
SP82
SP822
SP823
SP824
SP825
SP826
SP827
SP828
SP829
SP83
SP830
SP831
SP832
SP833
SP834
SP835
SP836
SP837
SP838
SP839
SP84
SP840
SP841
SP842
SP843
SP844
SP845
SP846
SP85
SP86
SP869
SP87
SP870
SP871
SP872
SP873
SP874
SP875
SP876
SP877
SP878
SP879
SP88
SP880
SP881
SP89
SP90
SP904
SP905
SP906
SP907
SP908
SP909
SP9A 4/19
SP91 4/21
SP910
SP911
SP912
SP913
SP914
SP915
SP916
SP92
SP930
SP931
SP932
SP933
SP934
SP935
SP936
SP937
SP938
SP939
SP940
SP941
SP942
SP943
SP944
SP945
SP946
SP947
SP948
SP949
SP950
SP951
SP952
SP953
SP954
SP978
SP979
SP980
SP981
SP982
SP983
SP984
SP985
SP986
SP987
SP988
SP989
SP990
SP329
SP269
SP1013
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL
0
Rig 1 = Diesel Pile Hammer MPP-111
Rig 2 = Diesel Pile Hammer MPP-110
Rig 3 = Diesel Pile Hammer MPP-101
Rig 4 = Diesel Pile Hammer MPP-103
Rig 5 = Diesel Pile Hammer MPP-106
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LOADING UNLOADING PILE RECORD
Pay Length
Progress of Works
[m]
Up To Last Period 948
This Period 17604.00
Up To This Period 18552.00
(…........................................) (….......................................)
DIESEL HAMMER RECORD
RIG 1 (MPP-111) RIG 2 (MPP-110) RIG 3 (MPP-101) RIG 3 (MPP-103) RIG 4 (MPP-106)
Total Total Total Total Total TOTAL TOTAL
No. Date Length of Length of Length of Length of Length of Nos/days Pile Used CUMLATIVE
Nos/Days Nos/Days Nos/Days Nos/Days Nos/Days
Pile Used Pile Used Pile Used Pile Used Pile Used
[m] [m] [m] [m] [m]
1 18/Mar/21 2 72 2 72 2
2 19/Mar/21 2 96 2 96 4
3 20/Mar/21 3 144 3 144 6 288 10
4 21/Mar/21 6 288 6 288 12 576 22
5 22/Mar/21 2 96 4 156 6 252 28
6 23/Mar/21 2 96 6 288 8 384 36
7 24/Mar/21 7 336 6 288 5 228 18 852 54
8 25/Mar/21 5 288 6 288 3 144 14 720 68
9 26/Mar/21 5 240 5 240 2 96 12 576 80
10 27/Mar/21 0 0 80
11 28/Mar/21 5 228 4 192 6 264 2 96 17 780 97
12 29/Mar/21 6 288 6 288 2 96 14 672 111
13 30/Mar/21 5 240 6 288 6 252 9 336 26 1116 137
14 31/Mar/21 8 384 8 336 6 6 22 726 159
15 01/Apr/21 6 288 8 384 6 288 20 960 179
16 02/Apr/21 4 192 6 276 6 14.5 5 228 21 710.5 200
17 03/Apr/21 7 336 6 276 7 336 6 276 26 1224 226
18 04/Apr/21 6 288 8 384 8 360 8 348 30 1380 256
19 05/Apr/21 6 288 5 240 9 372 7 300 27 1200 283
20 06/Apr/21 5 228 6 276 6 288 6 216 23 1008 306
21 07/Apr/21 5 240 5 240 5 192 6 216 21 888 327
22 08/Apr/21 7 276 7 336 7 276 9 324 30 1212 357
23 09/Apr/21 7 312 8 384 10 408 9 324 34 1428 391
24 10/Apr/21 3 132 4 192 5 204 5 180 4 180 21 888 412
25 11/Apr/21 412
26 12/Apr/21 8 384 8 384 8 312 10 360 6 216 40 1656 452
27 13/Apr/21 6 252 7 336 9 372 9 324 6 216 37 1500 489
28 14/Apr/21 0 0 489
CUMLATIVE PERCENT
72 0.17%
168 0.33%
456 0.83%
1032 1.82%
1284 2.32%
1668 2.99%
2520 4.48%
3240 5.64%
3816 6.63%
3816 6.63%
4596 8.04%
5268 9.20% 439
6384 11.36% 532
7110 13.18% 592.5
8070 14.84% 672.5
8781 16.58% 731.7083
10005 18.74% 833.7083
11385 21.23% 948.7083
12585 23.47% 1048.708
13593 25.37% 1132.708
14481 27.11% 1206.708
15693 29.60% 1307.708
17121 32.42% 1426.708
18009 34.16% 1500.708
18009 34.16% 1500.708
19665 37.48% 1638.708
21165 40.55% 1763.708
21165 40.55% 1763.708