You are on page 1of 20

PAY L E SS W A I T L E SS

5-Drawer Chest with 1 Door


CDA-07 Assembly Manual

120 MIN 2
NUMBER OF
PACKAGES
APPROXIMATE
ASSEMBLY TIME
1
01
2 PEOPLE ASSEMBLE
Exploded View




⑧ ③



⑪ ⑩


et
rp
Ca



Drawer 5X
Panel List
Please check the Panel list before installation.
Item no. ⑨ ⑩ ⑪ ⑫
Qty. 1 1 1 1 1 1 1 2 5 10 5 5

02
Accessories List
Please check the Accessories list before installation.

Item Item
no. Reference Image Qty. no. Reference Image Qty.

A ×6 H ×2

B ×6
I ×2
FRONT

×5
C J2
KIT J
J1
×10

K1 K2
D ×12 K ×20

E ×58
L ×10

F ×6
M ×2

G2
G G1 ×46 N ×4

03
1 A×6

When the thread


is fully screwed
in, it is installed.

A×6

1
BA
C
K

04
2 C×5 E×15
ON
T
ion
1
FR at
t all
15 le i ns
d
ril
-d
re
tc hp
27 e ma
as
Ple

ONT
FR

3
CK
BA
TO
P

E×15

C×5
TO
P

Pre-drilled

T
ON
FR 3
CK
BA

05
3 C×5 E×15

1
NT
ion
lat
O
FR l
ta
15 led ins
ril
-d
p re
tch
27 e ma
as
Ple

BA
C
K
FR
O
N
T P
TO
4

E×15

C×5
P
TO
Pre-drilled

4
BA

FR
C

O
K

N
T

06
4 D×12

TO
P
CK
BA

D×12

TO
P

√ BA
CK

×
TO
P

CK
BA
4

07
5 B×6

TOP
3
4

BA
CK

LEFT

Step1 Step2 Step3

Arrow Arrow
B×6 (Unlocked) (Unlocked)
Arrow
Locked

Unlocked

08
6


BAC
K

TOP

FT
LE

09
7 F×6

F×6

BAC
K
TOP

FT
LE

10
8 I×2 H×2 E×16

How to use "H"

"OPEN" "LOCK"

E×16

11
9
G2
G1

G×16

90° 90°

90° 90°

Put on corner guard to make the cabinet stable.

G2×16
G1×16

12
10 M×2 E×4

E×4

M×2

Pre-drilled

13
11 E×8

Pre-drilled Pre-drilled

6 E×8

14
Non-essential steps
fine-tune this method if needed

+2mm

-2mm

+2mm +2mm
-2mm
-2mm

Door hinge adjustment method and principle

15
12 N×4
Adjust the height to install according to your needs.

STEP 1

N×4 STEP 3

Fasten the notch of the active


laminate to the laminate grain
STEP 2

Tilt the movable shelf


and enter the cabinet

16
13
K1
K2 Drawer Installation ×5

K×20 L×10
K2×4
DRAWER INSTALLATION
SCAN QR CODE TO WATCH THE VIDEO

Outward

K1×4

Drawer installation
L×1
STEP 1

11

Drawer installation L×1


STEP 2

10

Pay attention to the


slot and slot alignment

Drawer installation 10
STEP 3
9

17
Drawer Installation ×5

9
Drawer installation

STEP 4
12

11

Drawer installation

STEP 5

If you need to disassemble the drawer, please follow the steps below.

REMOVE DRAWER SIDE PANELS


Step1 SCAN QR CODE TO WATCH THE VIDEO

Step2

18
14 Drawer Installation ×5
G2
G1

G×20

G2×4

t
ec
eff G1×4
bled
m
A sse

90°
90°

RIGHT ANGLE DETECTION


SCAN QR CODE TO WATCH THE VIDEO
Dr
aw
e r
M
ou
nt
in
g
ta
ble

19
15
J1 J2

J×12

DRAWER ASSEMBLY
SCAN QR CODE TO WATCH THE VIDEO

Step1 Step2 Step3

J2×10
J1×10

20

You might also like