CONSULTANT CLIENT CONTRACTOR

Nippon Koei Co. Ltd and Eight - Japan SHIMIZU -


UGANDA NATIONAL
Engineering Consultants Inc., in Association KONOIKE JOINT
ROADS AUTHORITY
with ICS - Engineering & Environment Ltd. VENTURE

KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT LOT-1

CONTRACT NO:UNRA/WORKS/2016-17/00127
MC-30 and K-160 SPRAY RATE

Type of Specific Average Spray


Date Chainage Weather Temperature Time Speed
binder gravity rate
KM:0+915 - 1+040 RHS
10/7/2023 (NSAMBYA ROAD - MC-30 SUNNY 65◦C 0.934 4:17 PM 4.0 KPH 0.99
OVERPASS)
10/11/2023 KM:0+980 - 1+065 K-160 SUNNY 25◦C 0.934 11:30AM 21.0 KPH 0.17
KM: 0+60-0+800 LHS
10/12/2023 K-160 SUNNY 24◦C 1.000 10:50 AM 20.0 KPH 0.24
QUEEN'S WAY
KM: 0+040-0+078
10/13/2023 MC-30 SUNNY 72◦C 0.934 10:10 AM 5.0 KPH 1.03
KATWE LINK ROAD
KM: 0+000 - 0+140 RHS,
MENGO HILL & KM:
10/14/2023 K-160 SUNNY 28◦C 1.000 7:50 AM 30.0 KPH 0.24
0+550 - 0+610 LHS
QUEENS WAY
KM: 0+700 - 0+740/
10/14/2023 NSAMBYA ROAD - A2 K-160 SUNNY 25◦C 1.000 10:20 AM 25.0 KPH 0.26
APPROACH
KM: 0+570 LHS
10/19/2023 (NSAMBYA ROAD MC-30 SUNNY 65◦C 0.925 4:10 PM 5.0 KPH 65◦C
ACCESS)
KM: 0+080 - 0+192
10/20/2023 (SHOPRITE/ BEN K-160 SUNNY 26◦C 1.000 9:34 AM 30.0 KPH 0.31
KIWANUKA)
KM: 0+370-1+520
10/21/2023 K-160 SUNNY 24◦C 1.000 9:40 AM 4.5 KPH 0.26
QUEENSWAY, MEDIAN
KM: 0+200-0+260/ KM:
24/10/2023 0+370 - 0+200 K-160 SUNNY 25◦C 1.000 10:05 AM 30.0 KPH 0.23
QUEENSWAY
KM: 0+905 - 0+810 RHS
26/10/2023 K-160 SUNNY 25◦C 1.000 11:40 AM 30.0 KPH 0.21
(NSAMBYA ROAD)
KM: 0+110-0+334/ KM:
0+040 - 0+070
27/10/2023 K-160 SUNNY 28◦C 1.000 10:30 AM 30.0 KPH 0.21
QUEENSWAY A1 &
KATWE LINK
KM: 0+540/0+735 RHS
10/28/2023 (QUEENSWAY & MC-30 CLOUDY 60◦C 0.934 5:10 PM 4.5 KPH 0.74
NSAMBYA ROAD)
KM: 0+540/0+735 RHS
10/28/2023 (QUEENSWAY & MC-30 CLOUDY 60◦C 0.934 5:10 PM 4.5 KPH 0.74
NSAMBYA ROAD)
KM: 0+905 - 0+730 RHS
10/28/2023 K-160 SUNNY 28◦C 1.000 10:00 AM 30.0 KPH 0.22
NSAMBYA ROAD
KM: 0+810 - 0+600 RHS
10/28/2023 K-160 SUNNY 25◦C 1.000 10:00 AM 30.0 KPH 0.27
NSAMBYA ROAD
KM: 0+060, 0+730,
0+765, 0+820 RHS
10/28/2023 MC-30 SUNNY 60◦C 0.934 12:00 AM 4.5 KPH 0.76
(NSAMBYA ACCESS
ROAD)
KM: 0+690 - 0+540 RHS
10/30/2023 K-160 SUNNY 24◦C 1.000 12:30 PM 30.0 KPH 0.27
(NSAMBYA ROAD)
KM: 0+700-0+910 RHS
10/31/2023 K-160 SUNNY 28◦C 1.000 10:47 AM 30 KPH 0.28
NSAMBYA ROAD
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.

KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L


CONTRACT NO:UNRA/WORKS/2016-17/00127
MC-30 SPRAY RATE

DATE: 07-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM:0+915 - 1+040 RHS (NSAMBYA ROAD -OVERPASS)
TIME: 4:17 PM WEATHER:
SPECIFIC GRAVITY: 0.934 kg/m3 TEMP.

S/N CHAINAGE TRAY No WT OF TRAY + WT OF TRAY WT OF


BINDER (Kg) BINDER
(Kg) (Kg)

A 2.676 2.583 0.093

1 1st Run B 2.736 2.651 0.085

A' 2.691 2.612 0.079

2 2nd Run B' 2.746 2.670 0.076


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL SHIMIZU - KONOIKE
ROADS JOINT VENTURE
AUTHORITY

AD UPGRADING PROJECT LOT-1


S/2016-17/00127
TE

PE OF BINDER: MC-30
4.0 KPH

SUNNY
65◦C

AREA OF TRAY VOLUME OF SPRAY RATE


(m2) BINDER (lit/m2)
(lit)

0.090 0.100 1.11

0.090 0.091 1.01

0.090 0.085 0.94

0.090 0.081 0.90


Average Spray Rate = 0.99

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 11-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM:0+980 - 1+065
TIME: 11:30AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.585 2.571 0.014

1 1st Run B 2.554 2.539 0.015

C 2.533 2.517 0.016


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
21.0 KPH

SUNNY

25◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.014 0.16

0.090 0.015 0.17

0.090 0.016 0.18


Average Spray Rate = 0.17

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 12-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+60-0+800 LHS QUEEN'S WAY
TIME: 10:50 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.563 2.540 0.023

1 1st Run B 2.541 2.519 0.022

C 2.552 2.532 0.020


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
20.0 KPH

SUNNY

24◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.023 0.26

0.090 0.022 0.24

0.090 0.020 0.22


Average Spray Rate = 0.24

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 13-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+040-0+078 KATWE LINK ROAD
TIME: 10:10 AM WEATHER:
SPECIFIC GRAVITY: 0.934 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.630 2.542 0.088

1 1st Run B 2.689 2.603 0.086

C 2.639 2.552 0.087


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: MC-30
5.0 KPH

SUNNY

72◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.094 1.05

0.090 0.092 1.02

0.090 0.093 1.03


Average Spray Rate = 1.03

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 14-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+000 - 0+140 RHS, MENGO HILL & KM: 0+550 - 0+610 LHS QUEENS WAY
TIME: 7:50 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.607 2.586 0.021

1 1st Run B 2.616 2.594 0.022

C 2.554 2.533 0.021

A' 2.628 2.607 0.021

2 2nd Run B' 2.638 2.616 0.022

C' 2.576 2.554 0.022


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
30.0 KPH
EENS WAY
SUNNY

28◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.021 0.23

0.090 0.022 0.24

0.090 0.021 0.23

0.090 0.021 0.23

0.090 0.022 0.24

0.090 0.022 0.24


Average Spray Rate = 0.24

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 14-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+700 - 0+740/ NSAMBYA ROAD - A2 APPROACH
TIME: 10:20 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.571 2.547 0.024

1 1st Run B 2.558 2.534 0.024

C 2.576 2.553 0.023


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
25.0 KPH

SUNNY

25◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.024 0.27

0.090 0.024 0.27

0.090 0.023 0.26


Average Spray Rate = 0.26

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
MC-30 SPRAY RATE

DATE: 19-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+570 LHS (NSAMBYA ROAD ACCESS)
TIME: 4:10 PM WEATHER:
SPECIFIC GRAVITY: 0.925 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

M1 2.612 2.533 0.079

1 1st Run M2 2.562 2.478 0.084

M3 2.624 2.543 0.081


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: MC-30
5.0 KPH

SUNNY

65◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.085 0.95

0.090 0.091 1.01

0.090 0.088 0.97


Average Spray Rate = 0.98

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 20-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+080 - 0+192 (SHOPRITE/ BEN KIWANUKA)
TIME: 9:34 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.455 2.428 0.027

1 1st Run B 2.545 2.517 0.028

C 2.531 2.503 0.028


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
30.0 KPH

SUNNY

26◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.027 0.30

0.090 0.028 0.31

0.090 0.028 0.31


Average Spray Rate = 0.31

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 21-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+370-1+520 QUEENSWAY, MEDIAN
TIME: 9:40 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.631 2.605 0.026

1 1st Run B 2.634 2.608 0.026

C 2.643 2.618 0.025

B" 2.655 2.631 0.024

2 2nd Run C" 2.655 2.634 0.021

D" 2.663 2.643 0.020


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
4.5 KPH

SUNNY
24◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.026 0.29

0.090 0.026 0.29

0.090 0.025 0.28

0.090 0.024 0.27

0.090 0.021 0.23

0.090 0.020 0.22


Average Spray Rate = 0.26

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 24-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+200-0+260/ KM: 0+370 - 0+200 QUEENSWAY
TIME: 10:05 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.279 2.256 0.023

1 1st Run B 2.275 2.250 0.025

C 2.278 2.263 0.015


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
30.0 KPH

SUNNY

25◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.023 0.26

0.090 0.025 0.28

0.090 0.015 0.17


Average Spray Rate = 0.23

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
MC-30 SPRAY RATE

DATE: 26-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+905 - 0+810 RHS (NSAMBYA ROAD)
TIME: 11:40 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.271 2.250 0.021

1 1st Run B 2.265 2.247 0.018

C 2.272 2.253 0.019

A' 2.286 2.265 0.021

2 2nd Run B' 2.270 2.253 0.017

C 2.289 2.269 0.020


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
30.0 KPH

SUNNY
25◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.021 0.23

0.090 0.018 0.20

0.090 0.019 0.21

0.090 0.021 0.23

0.090 0.017 0.19

0.090 0.020 0.22


Average Spray Rate = 0.21

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 27-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+110-0+334/ KM: 0+040 - 0+070 QUEENSWAY A1 & KATWE LINK
TIME: 10:30 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.269 2.250 0.019

1 1st Run B 2.276 2.259 0.017

A' 2.279 2.261 0.018

2 2nd Run B' 2.293 2.273 0.020

A" 2.286 2.270 0.016

3 3rd Run B" 2.305 2.284 0.021


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
30.0 KPH

SUNNY

28◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.019 0.21

0.090 0.017 0.19

0.090 0.018 0.20

0.090 0.020 0.22

0.090 0.016 0.18

0.090 0.021 0.23


Average Spray Rate = 0.21

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
MC-30 SPRAY RATE

DATE: 28-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+060, 0+730, 0+765, 0+820 RHS (NSAMBYA ACCESS ROAD)
TIME: WEATHER:
SPECIFIC GRAVITY: 0.934 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.575 2.520 0.055

1 1st Run C 2.583 2.509 0.074

A 2.599 2.534 0.065

2 2nd Run C 2.581 2.520 0.061

A 2.594 2.538 0.056

3 3rd Run C 2.599 2.529 0.070

A 2.608 2.547 0.061

4 4th Run C 2.604 2.538 0.066


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: MC-30
4.5 KPH

SUNNY
60◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.059 0.65

0.090 0.079 0.88

0.090 0.070 0.77

0.090 0.065 0.73

0.090 0.060 0.67

0.090 0.075 0.83

0.090 0.065 0.73

0.090 0.071 0.79


Average Spray Rate = 0.76

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.

KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L


CONTRACT NO:UNRA/WORKS/2016-17/00127
MC-30 SPRAY RATE

DATE: 28-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+540/0+735 RHS (QUEENSWAY & NSAMBYA ROAD)
TIME: 5:10 PM WEATHER:
SPECIFIC GRAVITY: 0.934 kg/m3 TEMP.

S/N CHAINAGE TRAY No WT OF TRAY + WT OF TRAY WT OF


BINDER (Kg) BINDER
(Kg) (Kg)

A 2.636 2.568 0.068

1 0+540 B 2.586 2.524 0.062

A 2.645 2.590 0.055

2 0+535 B 2.614 2.549 0.065


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL SHIMIZU - KONOIKE
ROADS JOINT VENTURE
AUTHORITY

AD UPGRADING PROJECT LOT-1


S/2016-17/00127
TE

PE OF BINDER: MC-30
4.5 KPH

CLOUDY
60◦C

AREA OF TRAY VOLUME OF SPRAY RATE


(m2) BINDER (lit/m2)
(lit)

0.090 0.073 0.81

0.090 0.066 0.74

0.090 0.059 0.65

0.090 0.070 0.77


Average Spray Rate = 0.74

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.

KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L


CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 28-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+905 - 0+730 RHS NSAMBYA ROAD
TIME: 10:00 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

S/N CHAINAGE TRAY No WT OF TRAY + WT OF TRAY WT OF


BINDER (Kg) BINDER
(Kg) (Kg)

A 2.270 2.251 0.019

1 1st Run B 2.272 2.254 0.018

A' 2.284 2.263 0.021

2 2nd Run B' 2.294 2.269 0.025

C 2.276 2.259 0.017


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL SHIMIZU - KONOIKE
ROADS JOINT VENTURE
AUTHORITY

AD UPGRADING PROJECT LOT-1


S/2016-17/00127
TE

PE OF BINDER: K-160
30.0 KPH

SUNNY
28◦C

AREA OF TRAY VOLUME OF SPRAY RATE


(m2) BINDER (lit/m2)
(lit)

0.090 0.019 0.21

0.090 0.018 0.20

0.090 0.021 0.23

0.090 0.025 0.28

0.090 0.017 0.19


Average Spray Rate = 0.22

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.

KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L


CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 28-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+810 - 0+600 RHS NSAMBYA ROAD
TIME: 10:00 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

S/N CHAINAGE TRAY No WT OF TRAY + WT OF TRAY WT OF


BINDER (Kg) BINDER
(Kg) (Kg)

A 2.271 2.248 0.023

1 1st Run B 2.278 2.253 0.025

A' 2.279 2.255 0.024

2 2nd Run B' 2.287 2.261 0.026


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL SHIMIZU - KONOIKE
ROADS JOINT VENTURE
AUTHORITY

AD UPGRADING PROJECT LOT-1


S/2016-17/00127
TE

PE OF BINDER: K-160
30.0 KPH

SUNNY
25◦C

AREA OF TRAY VOLUME OF SPRAY RATE


(m2) BINDER (lit/m2)
(lit)

0.090 0.023 0.26

0.090 0.025 0.28

0.090 0.024 0.27

0.090 0.026 0.29


Average Spray Rate = 0.27

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 30-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+690 - 0+540 RHS (NSAMBYA ROAD)
TIME: 12:30 PM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.595 2.571 0.024

1 1st Run B 2.558 2.532 0.026

C 2.542 2.518 0.024

A' 2.618 2.595 0.023

2 2nd Run B' 2.580 2.557 0.023

C' 2.566 2.542 0.024


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
30.0 KPH

SUNNY
24◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.024 0.27

0.090 0.026 0.29

0.090 0.024 0.27

0.090 0.023 0.26

0.090 0.023 0.26

0.090 0.024 0.27


Average Spray Rate = 0.27

ONSULTANT

_________ __________________
chnician Materials Engineer
CONSULTANT CLIENT

Nippon Koei Co. Ltd and Eight - Japan


Engineering Consultants Inc., in
Association with ICS - Engineering &
Environment Ltd.
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT L

CONTRACT NO:UNRA/WORKS/2016-17/00127
K-160 SPRAY RATE

DATE: 31-Oct-23 TYPE OF BINDER:


SPEED:
SECTIONS: KM: 0+700-0+910 RHS NSAMBYA ROAD
TIME: 10:47 AM WEATHER:
SPECIFIC GRAVITY: 1.000 kg/m3 TEMP.

WT OF TRAY + WT OF
WT OF TRAY
S/N CHAINAGE TRAY No BINDER BINDER
(Kg)
(Kg) (Kg)

A 2.275 2.251 0.024

1 1st Run B 2.284 2.259 0.025

C 2.284 2.254 0.030

A' 2.278 2.254 0.024

2 2nd Run B' 2.289 2.263 0.026

C' 2.285 2.261 0.024


REMARKS:-

FOR CONTRACTOR FOR CONSULTANT

_______________ __________________ _______________ ___________


Lab Technician Lab Manager Lab Technician Materials Eng
CLIENT CONTRACTOR

UGANDA
NATIONAL
ROADS SHIMIZU - KONOIKE
AUTHORITY JOINT VENTURE
AD UPGRADING PROJECT LOT-1

S/2016-17/00127
TE

PE OF BINDER: K-160
30 KPH

SUNNY
28◦C

VOLUME OF
AREA OF TRAY SPRAY RATE
BINDER
(m2) (lit/m2)
(lit)

0.090 0.024 0.27

0.090 0.025 0.28

0.090 0.030 0.33

0.090 0.024 0.27

0.090 0.026 0.29

0.090 0.024 0.27


Average Spray Rate = 0.28

ONSULTANT

_________ __________________
chnician Materials Engineer