You are on page 1of 11

TRAINI

NG
MODUL
E
S.No Time Session Objectiv
e
1 ### Introduc To
tion to introduc
Program e the
me objectiv
e,
rationale
and
schedule
of the
program
me to
the
participa
nts and
to share
the
expectat
ion

- 11:15 from the


am participa
nts

2 11:15 Introduc To
am – tion to present
VPRP the
rationale
and
objectiv
e of the
VPRP

###
3 12:45 Introduc Access
pm – tion to to social
LSDG protecti
Themes on
measure
s and
schemes.

2:00 PM Efficient
impleme
ntation
of
MGNRE
GS.

Income
generati
on
through
skills
training.
employ
ment,
building
Self-
Help
Groups.

Skill
upgrada
tion in
agricultu
re and
animal
husband
ry .
Improve
ment in
land
producti
vity-
irrigatio
n, better
seeds,
bio-
fertilizer
s.

Identific
ation of
appropri
ate new
technolo
gies
Access
to basic
services-
housing,
water,
sanitatio
n,
electricit
y,fuel,
educatio
n, NFSA,
mid-day
meals in
schools.

Lunch
Break
4 02:45 To
pm - sensitize
on the
importa
nce of
GPDP

encoura
ge them
to look
at local
governa
nce as a
space

3:30 PM Introduc that


tion to ensures
GPDP social
justice
and
equity.
To
Integrat
e VPRP
in to the
GPDP.

5 03:30 Introduc Basic


pm - tion to understa
INRM nding on
INRM.

4:00 PM Better
planning
of INRM
during
the
planning
of VPRP.

6 04:00 E-Gram
pm - Swaraj
Sequence: LSDG, ( they work on SDG 1 and 2, which comes under LSDG 1 Poverty Free and
1. Selecting LSDG1 as the theme of ZHP.
under LSDG 1 Poverty Free and enhanced livelihoods)VPRP, INRM Planning, GPDP, E-Gram Swaraj Portal and their roles
m Swaraj Portal and their roles in the whole process.
Module on training of VPRP-GPDP, LSDG (Theme-1 , Theme-4 and Theme-9) INRM planning and

Objective: The orientation aims to enhance the perspective around VPRP-GPDP planning and its im
further, Selection of Themes in Intensive Panchayat, INRM planning and to enhance the technical
swaraj portal for tracking plan entry and implementation process of the activities. This orientation
understand the connection between VPRP – GPDP and e-gram swaraj, so that they have a holistic p
preparation and its execution.

Participants: Approx. 56 participants


Expected outcome: After the orientation participants will have-
Shared understanding on the process followed in VPRP and GPDP, moreover the challenges faced i
Selecting LSDG 1 as the theme of ZHP.
Enhanced technical knowledge on key features of the e-gram swaraj and tracking process of schem
Enhanced technical knowledge on INRM planning
Time: 6 hours.
Trainer: NSK Fellows
Material and equipment require: A big hall (for 56 participants), projector, internet facilities, lapto
chart paper marker.
Time Topic
10:30 am – 10:45 am Introduction and context setting

10:45 am – 12:00pm Basic understanding of VPRP and


GPDP

12:00 pm – 1:30 pm LSDG

1:30pm -02:00 pm Lunch


02:00pm – 03:00 pm Overview of e-gram swaraj portal
1:45 pm – 2:15 pm Demonstration by participants

2:15 pm – 3:00 pm Consolidate action plan from


participants
me-1 , Theme-4 and Theme-9) INRM planning and E-gram Swaraj.

perspective around VPRP-GPDP planning and its implementation process,


yat, INRM planning and to enhance the technical knowledge on using e-gram
entation process of the activities. This orientation will help participants to
DP and e-gram swaraj, so that they have a holistic picture from plan

pants will have-


n VPRP and GPDP, moreover the challenges faced in plan approval process.

of the e-gram swaraj and tracking process of schemes.


g

56 participants), projector, internet facilities, laptop, chart paper (10 pcs),

Method Expected result


Group facilitation Introduction and tone setting. To
help participants to relate the
topic and focus on further
discussion.

PPT presentation by It will reinforce participants to


facilitator: understand on VPRP and GPDP
Component of VPRP and
GPDP
Understanding the Theme- It will develop a shared
1 ,Theme-2 and Theme-9, understanding about the process
Overview on Vibrant Gram followed, challenges faced during
Sabha the selection of theme-1 as the
theme of ZHP., Panchayat will
select the theme -1

Lunch
PPT presentation through live Participants will develop basic
demonstration: understanding of the portal and
understand the entry and tracking
Participants will ask to install process.
e-gram swaraj portal.
Presentation on

Key features of the portal


How to check GP level sector
wise planning
Process of tracking GP wise
progress
Participants will ask to visit To give participants to
their panchayat plan and demonstrate their learning
understand different aspect immediately and provide hand
of e-gram swaraj portal and hold support
share their understanding.

Individual sharing Participants will develop a plan of


Participants to prepare action for their GP.
immediate (monitoring of the
progress of last plan) and
medium-term action plan
(keeping the upcoming
planning process in mind)

You might also like