RENEWABLE ENERGY EXISTING

RENEWABLES EXISTING UTILIZATION

6.06 5.45
MTOE MTOE
Renewables-based Renewables-based
power generation power generation
BIOMASS (INDUSTRIAL &
MUNICIPALITY WASTES)
14.00 MW

HYDRO
2,109.60 MW

0.61 SOLAR

MTOE 21.96 MWp

Renewables-based GEOTHERMAL
1,193.80 MW
fuel production

FAME (Fatty Acid Methyl


Ester)/B30
3.4GWe
0.59 MTOE (649,357 kL)

West Java REs utilization


BIOGAS
0.0014 MTOE through power generation
(1.6 million m3/year)

BIOMASS
0.01 MTOE (40,994 ton)

MTOE: Million Tonnes of Oil Equivalent


kL: kiloliters; m3: metric cubic; MW: Mega Watt; MWp: Mega Watt peak
GWe: Giga Watt equivalent
Source: DEN; Dinas ESDM, 2022

DESDM | 2023
HYDRO POWER PLANT EXSISTING

CIRATA HYDROELECTRIC
POWER (1,008 MW)
WEST BANDUNG REGENCY

JATILUHUR HYDROELECTRIC
POWER (187,5 MW)
PURWAKARTA REGENCY

Mini Hydroelectric Power spread


across West Java

PLTM CIROMPANG (4 X 2 MW) PLTM CIANTEN (2 X 2,9 MW) PLTM CIBATARUA (2 X 2,5 MW)
BANDUNG REGENCY BOGOR REGENCY GARUT REGENCY

DESDM | 2023
Micro Hydroelectric Power spread
across West Java

PUMPED STORAGE
PROJECT

PUMPED STORAGE
UPPER CISOKAN
CAPACITY : 1040 MW (4 X 260MW)

Electricity experience burden peak (on


moment night day), water streamed from
Upper Reservoir to Lower Reservoir so that
produce electricity 1040 MW During 5.2 hour
(5408 MWh)

At the time of electricity demand at base


load (Base Load, Morning/Afternoon) water
is pumped up (from Lower Reservoir to
Upper Reservoir) using electricity that was
not sold at that time (7210 MWh)

DESDM | 2023
SOLAR POWER PLANT EXSISTING

SOLAR PANEL PT. COCA COLA


AMATIL INDONESIA (7,13 MW)
BEKASI REGENCY

SOLAR PANEL PT. TIRTA


INVESTAMA (770 KW)
BOGOR REGENCY

SOLAR PANEL GROUND


MOUNTING PT. PJB CIRATA
(1 MW)
BOGOR REGENCY

DESDM | 2023
Solar Power Project in Public
Buildings
In 2019, Energy and Mineral
Resources of West Java
Province has built 4 Solar
Rooftop Panel in each branch of
their offices. From the 4
locations of Solar Rooftop Panel
that have been built and
Energy and Mineral Resources of ESDM I Cianjur Office Branch operating until now have
West Java Province
Installed Total : 8.61 kWp resulted in significant energy
Installed Total : 14.1 kWp
savings, so it is hoped that in the
future the development of the
Solar Rooftop Panel
construction can be an example
for other regional apparatus
organizations, so that they can
participate in supporting the
program to increase the
renewable energy mix and
reducing carbon emissions,
ESDM III Purwakarta Office Branch ESDM VI Tasikmalaya Office Branch especially in the West Java
Installed Total : 14.74 kWp Installed Total : 8.61 kWp Province

Solar Power Project in Public


Buildings

DESDM | 2023
UNDER DEVELOPMENT
SOLAR PANEL PROJECT

MASDAR CIRATA
SOLAR PANEL
Masdar is developing the plant with PT. Pembangkit Jawa-Bali
Investasi (PT.PJB), a subsidiary of PLN
Energy Output : 145 MW
Area : 250 Hectare
Location : Cirata, Purwakarta

DESDM | 2023
GEOTHERMAL POWER PLANT EXSISTING

GEOTHERMAL POWER PLANT STAR ENERGY GEOTHERMAL


KAMOJANG PT. INDONESIA SALAK LTD (377 MW)
POWER (140 MW) SUKABUMI REGENCY
BANDUNG REGENCY

STAR ENERGY GEOTHERMAL GEOTHERMAL POWER PLANT


WAYANG WINDU LTD (277 MW) PATUHA UNTI 1 PT. GEO DIPA
BANDUNG REGENCY (60 MW)
BANDUNG REGENCY

GEOTHERMAL POWER PLANT PROJECT

GWA CISOLOK CISUKARAME GWA GUNUNG GALUNGGUNG


ESTIMATED RESOURCE 45 MW ESTIMATED RESOURCE 220 MW
SUKABUMI REGENCY TASIKMALAYA REGENCY

DESDM | 2023
WASTE ENERGY POWER PLANT EXSISTING

WASTE ENERGY POWER PLANT


BANTAR GEBANG
(110,5 KWH/TON)
BEKASI REGENCY

UNDER DEVELOPMENT WASTE ENERGY


POWER PLANT PROJECT

TPPAS LULUT NAMBO

TPPAS Lulut Nambo uses Mechanical Biological


Treatment (MBT) technology to process waste into
Refused Derived Fuel (RDF) and compost.
Capasity : 1500 ton/day

TPPAS LEGOK NANGKA


TPPAS Legok Nangka is planned as a waste to energy
development using thermal technology to produce
electricity. Revenue is obtained from the sale of
electricity to PLN and tipping fees from districts / cities.
Capasity : 1820 ton/day

DESDM | 2023
WIND POWER PLANT PROJECT

WIND POWER PLANT


PROJECT SUKABUMI
UPC-formed companies have developed more than 4,500 MW of now operating wind and
solar projects globally. UPC has successfully developed, built and operating the PLTB
Sidrap 75 MW, The First Wind Farm in Indonesia which has been operating since 2018.
Energy Output : 150 MW
Location : Sukabumi

WIND FARM PROJECT


VESTAS
Vestas Wind Systems A/S is a Danish manufacturer, seller, installer, and servicer of wind
turbines that was founded in 1945. As of 2019 Vestas has installed over 66,000 wind
turbines for a capacity of 100 GW in over 80 countries on five continents.
Energy Output : 150 MW
Area : 150 Hectare
Location : Pameungpek, Cibalong