You are on page 1of 2

Package to increase boiler load

30-50%
• Primary nozzle
Reliability and performance


Upgrade of furnace walls
Bottom ash sieving system
secured by focusing on
• Vortex finder
availability and reaching full load
Valmet CFB Service Solutions
for Asia Pacific market
Package to increase boiler load
Valmet’s professionals around

15-20%
• Furnace heat transfer surface
the world work close to our
customers and are committed
to moving your performance
forward – every day.
• Flue gas recirculation system

LinkedIn.com/company/valmet

Twitter.com/valmetglobal

Youtube.com/valmetglobal

Facebook.com/valmetcorporation

www.valmet.com

© Valmet Corporation, HPGB_B_2310_146-02, 06/2019.


Valmet has improved customers’
performance and reliability since

21,500 MWth
of total delivered capacity in the last ten years
1841 >9,000
years of industrial history For more information, contact your local Valmet office. www.valmet.com
in power generation Specifications in this document are subject to change without notice.
Product names in this publication are all trademarks of Valmet Corporation.
Reduce
Securing operational & Optimize

Return of investment
availability maintenance productivity
costs
We offer a wide range of improvement possibilities
to help you recharge your operations
Valmet Service Solutions for CFB Boilers

Increase safety
Allow fuel
flexiblity
We can help you to
improve the performance
Savings example
One 5-day maintenance shutdown 70 kUSD (steam price – coal cost)
10% increased boiler load 450 kUSD/year (steam price – coal cost)

and secure reliability


Reduce
Build competence
operational &
throughout the Metal spray improvements
maintenance
organization Improved refractory loop seal
costs Flue gas air preheater

1-3 years
Air coil preheater
Plastic sleeves
Cooled cyclones Primary air nozzles
Removal of anti-erosion beam
A recharge by Valmet can help improve your performance to meet sustainability Vortex finder Bottom ash sieving system
Steam attemperators
demands and drive business growth. Reliability and performance secured by focusing Vortex finder
on availability and the possibility of reaching full load.
3-5 years
Retractory improvements
Flue gas air preheaters
Improved refractory

Wing wall
Flue gas cleaning
5-10 years
Upgrade of furnace walls
Coal fuel chute

Reduce
Develop Furnace heat transfer
environmental
personnel
impact
Metal spray enhancements
Based on studies of local boilers, Valmet
know-how, and long experience in CFB-boilers
Loop seal
Typical boiler data
Type: CFB (Circulating Fluidized Bed)
Primary air nozzles Load: 100-500 MWth
Fuel: Coal and bark
Flue gas recirculation system
Improvement areas
Bottom ash sieving system
Low availability, typically 60-80%
Not reaching full load, typically 50-80% of full load

Every year we recharge


• Automatic combustion air control inspections • Training and remote support

~180
years of industrial history in
~120
boiler plants supplied
>100 service centers globally
200
power boilers around the globe
• Service agreements • Reduced slagging and agglomeration

power generation by Valmet since 2006