No. 6 Farid Print
No. 6 Farid Print
700
600
Q Total (m3/detik)
500
400
300
200
100
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Waktu (Jam)
2 TAHUN 5 TAHUN 10 TAHUN 20 TAHUN 50 TAHUN 100 TAHUN 500 TAHUN 1000 TAHUN
Tabel 7.14 Hidrograf Banjir Rancangan Periode Ulang 1000 Tahun Metode NAKAYASU
Waktu Qp RC1 RC2 RC3 RC4 RC5 Base Flow QTotal
(Jam) 3
(m /dtk) 97,616 25,373 17,798 14,169 11,965 3
(m /dtk) (m3/dtk)
0 0,000 0,000 22,820 22,820
1 0,861 84,008 0,000 22,820 107,689
2 4,542 443,398 21,836 0,000 22,820 492,596
2,201209 5,717 558,096 115,249 15,317 0,000 22,820 717,199
3 4,220 411,926 145,061 80,844 12,194 0,000 22,820 677,065
4 2,885 281,649 107,068 101,757 64,360 10,297 22,820 590,837
5 1,973 192,573 73,206 75,106 81,008 54,350 22,820 501,037
5,368029 1,715 167,429 50,054 51,353 59,792 68,409 22,820 421,571
6 1,461 142,648 43,518 35,112 40,882 50,492 22,820 336,933
7 1,134 110,711 37,077 30,527 27,952 34,523 22,820 264,745
8 0,880 85,925 28,776 26,009 24,303 23,605 22,820 212,317
9 0,683 66,687 22,334 20,186 20,706 20,523 22,820 173,938
10 0,530 51,757 17,333 15,667 16,070 17,485 22,820 141,662
10,11826 0,515 50,229 13,453 12,159 12,472 13,570 22,820 125,218
11 0,435 42,477 13,055 9,437 9,680 10,532 22,820 108,437
12 0,360 35,124 11,041 9,158 7,513 8,174 22,820 94,190
13 0,298 29,043 9,129 7,745 7,291 6,344 22,820 82,670
14 0,246 24,015 7,549 6,404 6,166 6,157 22,820 73,357
15 0,203 19,858 6,242 5,295 5,098 5,207 22,820 64,724
16 0,168 16,420 5,162 4,379 4,216 4,305 22,820 57,470
17 0,139 13,578 4,268 3,621 3,486 3,560 22,820 51,471
18 0,115 11,227 3,529 2,994 2,882 2,944 22,820 46,511
19 0,095 9,284 2,918 2,476 2,383 2,434 22,820 42,410
20 0,079 7,676 2,413 2,047 1,971 2,013 22,820 39,019
21 0,065 6,347 1,995 1,693 1,630 1,664 22,820 36,215
22 0,054 5,249 1,650 1,400 1,348 1,376 22,820 33,896
23 0,044 4,340 1,364 1,157 1,114 1,138 22,820 31,978
24 0,037 3,589 1,128 0,957 0,921 0,941 22,820 30,393
0,933 0,791 0,762 0,778 22,820 26,084
0,654 0,630 0,643 22,820 24,748
0,521 0,532 22,820 23,873
0,440 22,820 23,260
Debit Puncak (Qmaks / Qp) 717,199
700
600
Q Total (m3/dt)
500
400
Debit Banjir
300 Base Flow
200
100
0
-1,000 4,000 9,000 14,000 19,000 24,000
Waktu (Jam)
Tabel 7.13 Hidrograf Banjir Rancangan Periode Ulang 500 Tahun Metode NAKAYASU
Waktu Qp RC1 RC2 RC3 RC4 RC5 Base Flow QTotal
(Jam) 3
(m /dtk) 72,105 18,742 13,147 10,466 8,838 3
(m /dtk) (m3/dtk)
0 0,000 0,000 22,820 22,820
1 0,861 62,053 0,000 22,820 85,734
2 4,542 327,518 16,129 0,000 22,820 371,009
2,201209 5,717 412,240 85,129 11,314 0,000 22,820 537,220
3 4,220 304,271 107,150 59,716 9,007 0,000 22,820 507,183
4 2,885 208,041 79,086 75,163 47,540 7,606 22,820 443,141
5 1,973 142,245 54,074 55,477 59,837 40,145 22,820 376,572
5,368029 1,715 123,672 36,972 37,932 44,165 50,530 22,820 317,807
6 1,461 105,368 32,145 25,935 30,197 37,296 22,820 255,223
7 1,134 81,777 27,387 22,549 20,647 25,501 22,820 201,816
8 0,880 63,469 21,256 19,212 17,951 17,436 22,820 163,023
9 0,683 49,259 16,497 14,910 15,294 15,159 22,820 134,623
10 0,530 38,230 12,803 11,572 11,870 12,915 22,820 110,742
10,11826 0,515 37,102 9,937 8,981 9,213 10,024 22,820 98,591
11 0,435 31,376 9,643 6,971 7,150 7,780 22,820 86,175
12 0,360 25,944 8,155 6,765 5,549 6,038 22,820 75,632
13 0,298 21,453 6,743 5,721 5,385 4,686 22,820 67,106
14 0,246 17,739 5,576 4,730 4,554 4,548 22,820 60,214
15 0,203 14,668 4,611 3,911 3,766 3,846 22,820 53,826
16 0,168 12,129 3,813 3,234 3,114 3,180 22,820 48,458
17 0,139 10,029 3,153 2,674 2,575 2,630 22,820 44,020
18 0,115 8,293 2,607 2,211 2,129 2,174 22,820 40,350
19 0,095 6,857 2,156 1,829 1,761 1,798 22,820 37,315
20 0,079 5,670 1,782 1,512 1,456 1,487 22,820 34,806
21 0,065 4,689 1,474 1,250 1,204 1,229 22,820 32,731
22 0,054 3,877 1,219 1,034 0,995 1,017 22,820 31,015
23 0,044 3,206 1,008 0,855 0,823 0,841 22,820 29,597
24 0,037 2,651 0,833 0,707 0,681 0,695 22,820 28,423
0,689 0,585 0,563 0,575 22,820 25,231
0,483 0,465 0,475 22,820 24,244
0,385 0,393 22,820 23,598
0,325 22,820 23,145
Debit Puncak (Qmaks / Qp) 537,220
500
Q Total (m3/dt)
400
300
Debit Banjir
Base Flow
200
100
0
-1,000 4,000 9,000 14,000 19,000 24,000
Waktu (Jam)
Tabel 7.12 Hidrograf Banjir Rancangan Periode Ulang 100 Tahun Metode NAKAYASU
Waktu Qp RC1 RC2 RC3 RC4 RC5 Base Flow QTotal
(Jam) (m3/dtk) 48,443 12,591 8,833 7,032 5,938 (m3/dtk) (m3/dtk)
0 0,000 0,000 22,820 22,820
1 0,861 41,690 0,000 22,820 65,371
2 4,542 220,042 10,836 0,000 22,820 258,240
2,201209 5,717 276,962 57,193 7,601 0,000 22,820 370,294
3 4,220 204,423 71,988 40,120 6,051 0,000 22,820 349,623
4 2,885 139,771 53,134 50,498 31,939 5,110 22,820 306,158
5 1,973 95,567 36,330 37,272 40,201 26,972 22,820 261,134
5,368029 1,715 83,088 24,840 25,484 29,672 33,949 22,820 221,569
6 1,461 70,791 21,596 17,425 20,288 25,057 22,820 179,439
7 1,134 54,942 18,400 15,149 13,872 17,132 22,820 143,450
8 0,880 42,641 14,281 12,907 12,060 11,714 22,820 117,304
9 0,683 33,094 11,083 10,017 10,275 10,185 22,820 98,159
10 0,530 25,685 8,602 7,775 7,975 8,677 22,820 82,064
10,11826 0,515 24,927 6,676 6,034 6,189 6,734 22,820 73,895
11 0,435 21,080 6,479 4,683 4,804 5,227 22,820 65,528
12 0,360 17,431 5,479 4,545 3,728 4,057 22,820 58,419
13 0,298 14,413 4,531 3,843 3,618 3,148 22,820 52,671
14 0,246 11,918 3,746 3,178 3,060 3,055 22,820 48,024
15 0,203 9,855 3,098 2,628 2,530 2,584 22,820 43,718
16 0,168 8,149 2,561 2,173 2,092 2,137 22,820 40,100
17 0,139 6,738 2,118 1,797 1,730 1,767 22,820 37,109
18 0,115 5,572 1,751 1,486 1,430 1,461 22,820 34,635
19 0,095 4,607 1,448 1,229 1,183 1,208 22,820 32,590
20 0,079 3,809 1,197 1,016 0,978 0,999 22,820 30,899
21 0,065 3,150 0,990 0,840 0,809 0,826 22,820 29,500
22 0,054 2,605 0,819 0,695 0,669 0,683 22,820 28,344
23 0,044 2,154 0,677 0,574 0,553 0,565 22,820 27,387
24 0,037 1,781 0,560 0,475 0,457 0,467 22,820 26,597
0,463 0,393 0,378 0,386 22,820 24,440
0,325 0,313 0,319 22,820 23,777
0,259 0,264 22,820 23,343
0,218 22,820 23,039
Debit Puncak (Qmaks / Qp) 370,294
350
300
Q Total (m3/dt)
250
200
Debit Banjir
150 Base Flow
100
50
0
-1,000 4,000 9,000 14,000 19,000 24,000
Waktu (Jam)
Tabel 7.11 Hidrograf Banjir Rancangan Periode Ulang 50 Tahun Metode NAKAYASU
Waktu Qp RC1 RC2 RC3 RC4 RC5 Base Flow QTotal
(Jam) 3
(m /dtk) 38,773 10,078 7,069 5,628 4,753 3
(m /dtk) (m3/dtk)
0 0,000 0,000 22,820 22,820
1 0,861 33,368 0,000 22,820 57,049
2 4,542 176,117 8,673 0,000 22,820 212,152
2,201209 5,717 221,674 45,776 6,084 0,000 22,820 302,072
3 4,220 163,616 57,618 32,111 4,843 0,000 22,820 285,228
4 2,885 111,870 42,527 40,418 25,564 4,090 22,820 250,174
5 1,973 76,490 29,077 29,832 32,176 21,587 22,820 213,956
5,368029 1,715 66,502 19,881 20,397 23,749 27,172 22,820 182,237
6 1,461 56,660 17,285 13,946 16,238 20,055 22,820 148,466
7 1,134 43,974 14,727 12,125 11,103 13,712 22,820 119,596
8 0,880 34,129 11,430 10,331 9,653 9,376 22,820 98,619
9 0,683 26,488 8,871 8,018 8,224 8,152 22,820 83,256
10 0,530 20,558 6,885 6,223 6,383 6,945 22,820 70,344
10,11826 0,515 19,951 5,343 4,830 4,954 5,390 22,820 63,802
11 0,435 16,872 5,186 3,748 3,845 4,183 22,820 57,089
12 0,360 13,951 4,385 3,638 2,984 3,247 22,820 51,385
13 0,298 11,536 3,626 3,076 2,896 2,520 22,820 46,772
14 0,246 9,539 2,998 2,544 2,449 2,445 22,820 43,042
15 0,203 7,888 2,479 2,103 2,025 2,068 22,820 39,587
16 0,168 6,522 2,050 1,739 1,674 1,710 22,820 36,684
17 0,139 5,393 1,695 1,438 1,385 1,414 22,820 34,284
18 0,115 4,459 1,402 1,189 1,145 1,169 22,820 32,300
19 0,095 3,687 1,159 0,983 0,947 0,967 22,820 30,659
20 0,079 3,049 0,958 0,813 0,783 0,799 22,820 29,302
21 0,065 2,521 0,793 0,672 0,647 0,661 22,820 28,180
22 0,054 2,085 0,655 0,556 0,535 0,547 22,820 27,252
23 0,044 1,724 0,542 0,460 0,443 0,452 22,820 26,485
24 0,037 1,425 0,448 0,380 0,366 0,374 22,820 25,850
0,370 0,314 0,303 0,309 22,820 24,117
0,260 0,250 0,256 22,820 23,586
0,207 0,211 22,820 23,238
0,175 22,820 22,995
Debit Puncak (Qmaks / Qp) 302,072
300
250
Q Total (m3/dt)
200
Debit Banjir
150
Base Flow
100
50
0
-1,000 4,000 9,000 14,000 19,000 24,000
Waktu (Jam)
Tabel 7.10 Hidrograf Banjir Rancangan Periode Ulang 20 Tahun Metode NAKAYASU
Waktu Qp RC1 RC2 RC3 RC4 RC5 Base Flow QTotal
(Jam) (m3/dtk) 27,556 7,162 5,024 4,000 3,378 (m3/dt) (m3/dtk)
0 0,000 0,000 22,820 22,820
1 0,861 23,714 0,000 22,820 47,395
2 4,542 125,165 6,164 0,000 22,820 158,691
2,201209 5,717 157,543 32,533 4,324 0,000 22,820 222,937
3 4,220 116,281 40,949 22,821 3,442 0,000 22,820 210,533
4 2,885 79,505 30,224 28,725 18,168 2,907 22,820 185,234
5 1,973 54,361 20,665 21,201 22,868 15,342 22,820 159,230
5,368029 1,715 47,263 14,129 14,496 16,878 19,311 22,820 136,613
6 1,461 40,268 12,285 9,912 11,540 14,253 22,820 112,539
7 1,134 31,252 10,466 8,617 7,891 9,745 22,820 91,926
8 0,880 24,255 8,123 7,342 6,860 6,663 22,820 76,944
9 0,683 18,825 6,304 5,698 5,845 5,793 22,820 65,969
10 0,530 14,610 4,893 4,422 4,536 4,936 22,820 56,748
10,11826 0,515 14,179 3,798 3,432 3,521 3,831 22,820 52,095
11 0,435 11,991 3,685 2,664 2,732 2,973 22,820 47,301
12 0,360 9,915 3,117 2,585 2,121 2,307 22,820 43,225
13 0,298 8,199 2,577 2,186 2,058 1,791 22,820 39,929
14 0,246 6,779 2,131 1,808 1,740 1,738 22,820 37,263
15 0,203 5,606 1,762 1,495 1,439 1,470 22,820 34,795
16 0,168 4,635 1,457 1,236 1,190 1,215 22,820 32,722
17 0,139 3,833 1,205 1,022 0,984 1,005 22,820 31,008
18 0,115 3,169 0,996 0,845 0,814 0,831 22,820 29,590
19 0,095 2,621 0,824 0,699 0,673 0,687 22,820 28,418
20 0,079 2,167 0,681 0,578 0,556 0,568 22,820 27,449
21 0,065 1,792 0,563 0,478 0,460 0,470 22,820 26,648
22 0,054 1,482 0,466 0,395 0,380 0,388 22,820 25,985
23 0,044 1,225 0,385 0,327 0,315 0,321 22,820 25,437
24 0,037 1,013 0,318 0,270 0,260 0,266 22,820 24,984
0,263 0,223 0,215 0,220 22,820 23,742
0,185 0,178 0,182 22,820 23,364
0,147 0,150 22,820 23,117
0,124 22,820 22,944
Debit Puncak (Qmaks / Qp) 222,937
200
Q Total (m3/dt)
150
Debit Banjir
100
Base Flow
50
0
-1,000 4,000 9,000 14,000 19,000 24,000
Waktu (Jam)
Tabel 7.9 Hidrograf Banjir Rancangan Periode Ulang 10 Tahun Metode NAKAYASU
Waktu Qp RC1 RC2 RC3 RC4 RC5 Base Flow QTotal
(Jam) 3
(m /dtk) 22,145 5,756 4,038 3,214 2,714 3
(m /dtk) (m3/dtk)
0 0,000 0,000 22,820 22,820
1 0,861 19,058 0,000 22,820 42,739
2 4,542 100,589 4,954 0,000 22,820 132,906
2,201209 5,717 126,610 26,145 3,475 0,000 22,820 184,767
3 4,220 93,450 32,909 18,340 2,766 0,000 22,820 174,505
4 2,885 63,895 24,290 23,085 14,601 2,336 22,820 153,911
5 1,973 43,687 16,608 17,039 18,378 12,330 22,820 132,834
5,368029 1,715 37,983 11,355 11,650 13,564 15,519 22,820 114,607
6 1,461 32,361 9,873 7,965 9,274 11,455 22,820 95,210
7 1,134 25,116 8,411 6,925 6,341 7,832 22,820 78,580
8 0,880 19,493 6,528 5,900 5,513 5,355 22,820 66,490
9 0,683 15,129 5,067 4,579 4,697 4,656 22,820 57,631
10 0,530 11,742 3,932 3,554 3,646 3,967 22,820 50,191
10,11826 0,515 11,395 3,052 2,758 2,829 3,079 22,820 46,448
11 0,435 9,636 2,962 2,141 2,196 2,389 22,820 42,580
12 0,360 7,968 2,505 2,078 1,704 1,854 22,820 39,289
13 0,298 6,589 2,071 1,757 1,654 1,439 22,820 36,628
14 0,246 5,448 1,713 1,453 1,399 1,397 22,820 34,475
15 0,203 4,505 1,416 1,201 1,157 1,181 22,820 32,484
16 0,168 3,725 1,171 0,993 0,956 0,977 22,820 30,811
17 0,139 3,080 0,968 0,821 0,791 0,808 22,820 29,428
18 0,115 2,547 0,801 0,679 0,654 0,668 22,820 28,284
19 0,095 2,106 0,662 0,562 0,541 0,552 22,820 27,338
20 0,079 1,741 0,547 0,464 0,447 0,457 22,820 26,556
21 0,065 1,440 0,453 0,384 0,370 0,378 22,820 25,909
22 0,054 1,191 0,374 0,318 0,306 0,312 22,820 25,374
23 0,044 0,985 0,309 0,263 0,253 0,258 22,820 24,932
24 0,037 0,814 0,256 0,217 0,209 0,213 22,820 24,567
0,212 0,180 0,173 0,177 22,820 23,561
0,148 0,143 0,146 22,820 23,258
0,118 0,121 22,820 23,059
0,100 22,820 22,920
Debit Puncak (Qmaks / Qp) 184,767
180
160
140
Q Total (m3/dt)
120
100
Debit Banjir
80
Base Flow
60
40
20
0
-1,000 4,000 9,000 14,000 19,000 24,000
Waktu (Jam)
Tabel 7.8 Hidrograf Banjir Rancangan Periode Ulang 5 Tahun Metode NAKAYASU
Waktu Qp RC1 RC2 RC3 RC4 RC5 Base Flow QTotal
(Jam) 3
(m /dtk) 16,846 4,379 3,072 2,445 2,065 3
(m /dtk) (m3/dtk)
0 0,000 0,000 22,820 22,820
1 0,861 14,498 0,000 22,820 38,179
2 4,542 76,520 3,768 0,000 22,820 107,651
2,201209 5,717 96,314 19,889 2,643 0,000 22,820 147,384
3 4,220 71,089 25,034 13,952 2,104 0,000 22,820 139,219
4 2,885 48,606 18,477 17,561 11,107 1,777 22,820 123,234
5 1,973 33,234 12,634 12,961 13,980 9,379 22,820 106,981
5,368029 1,715 28,894 8,638 8,862 10,319 11,806 22,820 93,054
6 1,461 24,618 7,510 6,059 7,055 8,714 22,820 78,238
7 1,134 19,106 6,399 5,268 4,824 5,958 22,820 65,509
8 0,880 14,829 4,966 4,489 4,194 4,074 22,820 56,251
9 0,683 11,509 3,854 3,484 3,573 3,542 22,820 49,465
10 0,530 8,932 2,991 2,704 2,773 3,018 22,820 43,768
10,11826 0,515 8,668 2,322 2,098 2,152 2,342 22,820 40,917
11 0,435 7,331 2,253 1,629 1,670 1,818 22,820 37,956
12 0,360 6,062 1,905 1,580 1,296 1,411 22,820 35,435
13 0,298 5,012 1,576 1,337 1,258 1,095 22,820 33,395
14 0,246 4,145 1,303 1,105 1,064 1,063 22,820 31,745
15 0,203 3,427 1,077 0,914 0,880 0,899 22,820 30,220
16 0,168 2,834 0,891 0,756 0,728 0,743 22,820 28,939
17 0,139 2,343 0,737 0,625 0,602 0,614 22,820 27,880
18 0,115 1,938 0,609 0,517 0,497 0,508 22,820 27,004
19 0,095 1,602 0,504 0,427 0,411 0,420 22,820 26,280
20 0,079 1,325 0,416 0,353 0,340 0,347 22,820 25,681
21 0,065 1,095 0,344 0,292 0,281 0,287 22,820 25,186
22 0,054 0,906 0,285 0,242 0,233 0,237 22,820 24,776
23 0,044 0,749 0,235 0,200 0,192 0,196 22,820 24,438
24 0,037 0,619 0,195 0,165 0,159 0,162 22,820 24,158
0,161 0,137 0,131 0,134 22,820 23,384
0,113 0,109 0,111 22,820 23,153
0,090 0,092 22,820 23,002
0,076 22,820 22,896
Debit Puncak (Qmaks / Qp) 147,384
140
120
Q Total (m3/dt)
100
80 Debit Banjir
60
Base Flow
40
20
0
-1 4 9 14 19 24
Waktu (Jam)
Tabel 7.7 Hidrograf Banjir Periode Ulang 2 Tahun Metode NAKAYASU
Waktu Qp RC1 RC2 RC3 RC4 RC5 Base Flow QTotal
(Jam) (m /dtk)
3
10,883 2,829 1,984 1,580 1,334 3
(m /dtk)
3
(m /dtk)
0 0,000 0,000 22,820 22,820
1 0,861 9,366 0,000 22,820 33,047
2 4,542 49,434 2,434 0,000 22,820 79,231
2,201209 5,717 62,221 12,849 1,708 0,000 22,820 105,315
3 4,220 45,925 16,173 9,013 1,359 0,000 22,820 99,510
4 2,885 31,401 11,937 11,345 7,175 1,148 22,820 88,711
5 1,973 21,470 8,162 8,373 9,032 6,059 22,820 77,889
5,368029 1,715 18,666 5,580 5,725 6,666 7,627 22,820 68,800
6 1,461 15,904 4,852 3,915 4,558 5,629 22,820 59,139
7 1,134 12,343 4,134 3,403 3,116 3,849 22,820 50,800
8 0,880 9,580 3,208 2,900 2,709 2,632 22,820 44,729
9 0,683 7,435 2,490 2,250 2,308 2,288 22,820 40,275
10 0,530 5,770 1,932 1,747 1,792 1,949 22,820 36,541
10,11826 0,515 5,600 1,500 1,356 1,390 1,513 22,820 34,694
11 0,435 4,736 1,456 1,052 1,079 1,174 22,820 32,752
12 0,360 3,916 1,231 1,021 0,838 0,911 22,820 31,097
13 0,298 3,238 1,018 0,863 0,813 0,707 22,820 29,757
14 0,246 2,677 0,842 0,714 0,687 0,686 22,820 28,673
15 0,203 2,214 0,696 0,590 0,568 0,580 22,820 27,673
16 0,168 1,831 0,575 0,488 0,470 0,480 22,820 26,833
17 0,139 1,514 0,476 0,404 0,389 0,397 22,820 26,138
18 0,115 1,252 0,393 0,334 0,321 0,328 22,820 25,564
19 0,095 1,035 0,325 0,276 0,266 0,271 22,820 25,089
20 0,079 0,856 0,269 0,228 0,220 0,224 22,820 24,696
21 0,065 0,708 0,222 0,189 0,182 0,186 22,820 24,371
22 0,054 0,585 0,184 0,156 0,150 0,153 22,820 24,103
23 0,044 0,484 0,152 0,129 0,124 0,127 22,820 23,881
24 0,037 0,400 0,126 0,107 0,103 0,105 22,820 23,697
0,104 0,088 0,085 0,087 22,820 23,184
0,073 0,070 0,072 22,820 23,035
0,058 0,059 22,820 22,938
0,049 22,820 22,869
Debit Puncak (Qmaks / Qp) 105,315
100
Q Total (m3/dt)
80
60
Debit Banjir
Base Flow
40
20
0
-1 4 9 14 19 24
Waktu (Jam)
Dari Tabel 7.6, dengan plotting Qasli dan Qkoreksi sebagai Y dan Waktu sebagai x,
maka didapatkan Grafik Hidrograf Satuan sebagai berikut :
10
8
Q Total (m3 /dt)
5 HSS Asli
4 HSS 1mm/jam
3
0
-1 4 9 14 19 24
Waktu (Jam)
2,201208532 3,166820966
1,572 0,786145904 5,717238203
≈ 3 Jam ≈ 4 Jam
Tabel 7.3 Data Curah Hujan Rancangan dan Curah Hujan Rancangan Koreksi
Periode Ulang Hujan Rancangan (XT) Hujan Rancangan Koreksi (XTKoreksi)
2 45,3899 18,60984768
5 70,2603 28,80673017
10 92,3607 37,86788776
20 114,9259 47,11960012
50 161,7094 66,30087104
100 202,0410 82,83681119
500 300,7250 123,2972462
1000 407,1260 166,9216682
• Menghitung Nilai RT, Rt, dan RC Setiap Periode Ulang Tahun dengan t = 5 jam
Sebaran hujan jam-jaman (RT) = (R24/t) x (t/T)2/3
Nisbah jam-jaman (Rt) = (T x RT) - (T-1) x (RT-1)
Hujan efektif pada t tertentu (Rct) = XTKoreksi x Rt
(Perhitungan dari rumus rumus diatas ditabelkan, dan hasilnya dicantumkan pada
Tabel 7.4)
Tabel 7.1 Data Teknis
NIM F1A022101
X 2136
Y 1
Base Flow (BF) 22,820
Panjang Sungai (L) 20,212
Luas Das (A) 192,125
Harga α 2,014
Koefisien Pengaliran (C) 0,41