You are on page 1of 9
6.0. is) No-19t Highways and Minor Ports (HF2) Department, Dated: 28.08.2022 ‘GRIOP 2022. 2028 LUST OF WORKS -OTHER DISTRICT ROAD. SCP Rein Lakhs SLMD. | Job Code | Divison | Constituency Name of work Length | Amount Tay [OTOROP 22) Thinwvallur | Madavaram |Swengthening at km 0/0 - 3/0 of | 3.00 | 480.00 aParat Solavaram = Oralckadu - |Aruimandai - Perumullaivoyal road [Strengthening/Improvements poss 3.00 | 480.00 jravailur Total 3.00 | 480.00 [Chennai Circle Total '3.00 | 480.00 TB |ORDPZE|Tiravannamal] Kipennathur [Widening from Single Lane to | 4.00 | 460.00 PATS ai Iistermediate Lane and [Strengthening at km 7/0 - 11/0 of JUsambadi Periyakilambadi road including Reconstruction of, Jculvert at Kea 7/2, 7/4, 7/6, 8/4, ls/s, 9/4, 9/8, 10/4, 10/10 lother Widening Total %00_| 460,00 [Tiruvannamalai Total 4.00 | 460.00. Tae [TORE] Ranipet_ | Arakdeonam [Widening from Single Lane to | 3.00 | 290.00 23738 lintermediate Lane and [strengthening at km 0/0 - 3/0 of lkm 2/4 of Araldconam Thiruvallur |Road to Chinnamosur Road [Other Widening Total 3.00 _| 290.00 [Ranipet Total 3.00_| 290.00, Wid PrGROP A] — Vellore | Kvaithinanie [Widening om Single Tane tw | —1.00~[— 279.00 PAO ‘uppom intermediate Lane and strengthening at km 0/0 - 1/0 of Jchitoor - Gudiyatham Road to [Ramalai Krishnapuram Road including Reconstruction of Box culvert at Km 0/2, 0/4(), 0/8, lo/ 104) 6 0/ 10() and Construction lo Protective wall at Km 0/2 (Other Widening Total 1.00 _| 379.00 Tat |itORDP-22| Vellore | Kilvaithinank [Strengthening at km 0/0 - 3/8 of | 3.80 | 157.00 etre uppam — |K.V.Kottah Road to Pillanthipatt [Road including Reconstruction of lculvert at Km 1/10 (i) & 9/2 and (Construction of Culvert at Km 1/10 Gi [Strengthening/improvemonts eee 157.00 WHE |PTCRDP Z| — Vellore | Anaikatta [Construction of Drain at lan 12/4 146.00 zara2 lor Guruvarajapalayem = - lOdugathur - Melarasampattu Road including Construction of [Retaining wall at Km 10/0-10/250 [Others Total 146.00 [Weliore Total aa0 | 582.00 a4 te, [pea opR scp 178 of 211 Section Of Resin Lake SL.No. bode Division | Consttuency Name of work Length Amount oro TROP PAT | Cheyyar | Vandavasi |sravaavady [Widening fom Single Lane to lintermediate Lane and strengthening at lem 2/0 - $/0 of larcot Tindivanam road to road including lReconstruction of Culvert at lkm.2/4, 2/6, 2/8, 3/2, 3/10 and [Construction of Culvert at Kim.4/2 300 39000 [Other Widening Total 3.00 "390.00 ra mP.ine JOVcRIDP2|~“Cheyyar | Cheyyar WWayalathur [Strengthening at lan 1/0 - 1/6 of ~ Blacheri road (via) larasanipalayam 0.60 35.00 Irotal \Strengthening/Improvementa 0.60 ‘55.00 (Cheyyar Total 360 45,00 Te joroRIoP 22 Zp | Thirupathur | Tirapattur [Widening from Single Lane to jintermediate Lane and [Strengthening at km 0/0 - 2/20, [Strengthening at km 2/20 - 4/60 lot Matrapalli - Pudurnadu Road lincluding Reconstruction of Box |culvert at Kin 0/2, 0/10, 1/2, 2/2, 26 Wo, 2/6 Wi), 2/8, 3/6 (Construction of Drain at Km 2/0 - l2/2 and Construction of Retaining jwall at Km 0/6, 1/2, 2/6, 2/8, 3/4 4.60 626,00 [Other Widening Total 4.60 626.00 [Thirupathur Total 4.60 {626.00 Te PATE [FTCRIDP-22) Kalalcurichi | Sankearapura [Widening from Single Lane to lintermediate Lane and [Strengthening at km 0/0 - 2/0 of IChinnasalem Pandivankuppam [Road inciuding reconstruction of Jculvert at kom 0/4, 1/2, 1/4 & construction of retaining wall at lim 0/4-1/4 & 1/8-10. 510.00, a7 wear [prcRIDP2=| Kaliacarichi | Sankarapura {es2/8 [Widening fom Single Lane to intermediate Lane and [strengthening at km 2/0 - 3/0 of |cninnasalem Pandiyanieuppam |Road including construction of retaining wall at kon.2/2, 2/4, 2/6 100 191.00 Tae joroRIDEz PANE Kallalariehi | Kalialearichi |Widening fom Single Lane to intermediate ane and [strengthening at km 7/2 - 9/8 of Ichinnasalem V. Mamandhur Road lia) Nainarpalayam including Ireconstruction of culvert at km 8/4 la, (i), (i) & construction of retaining wall at km 7/10 & 8/2. 260 37800 [Other Widening Total 560. 1079.00 |Kallaicuriobi Total 5.60 1079.00 ;wannamalal Circle Total 25.60 3482.00 ‘ODR SCP 174 of 211 al SiN, ob Code Division Constiveney Namo of work Tae [orCRIDP Ze Pang Cuddalore Taleud [Widening trom Single Lane to listermediate Lane and [Strengthening at km 6/0 - 8/6, [Strengthening at km 8/6 - 9/6 of [Mholudur-Vadagarampoondi road reconstruction of culvert at Km 6/2, 6/6, 7/6, 8/2, 8/4 & 8/6 (Other Widening Total 720.00 Tee F-CROP e750 Cuddalore Chidambara [Strengthening at lan 0/0 - 2/2 of [The road from lam. 192/2 of Trichy-| \Chidambaram road to Elanangur Iroad including reconstruction of Jculverts at km.0/2, 0/10, 1/4 & 1/6 210.00 [Strengthening/improvements Iota 2.20 210.00 [Cuddalore Total 580 630,00 fllupuram Chrele Total ‘630.00 Te (oF CRIDP22 BP. Salem Gangavalli [Widening from Single Lane to lintermediate Lane and [Strengthening at km 0/0 - 3/0 of [Thalaivasal ~ Veeraganur Road to IPunalvasal Road including IReconstruction of Culvert at Ikm.0/4, 0/10, 1/4, 2/8 and fidening of culvert at Km.1/8 3.00 320.00 [Other Widening Total 3.00 320.00 [Salem Total 3.00 '320.00 laroRIbP27 zp-782 Edappadi ‘Omalur fidening fom Single Lane to intermediate Lane and [Strengthening at km 1/6 - 3/1, [Strengthening at tan 3/1 - 3/2 of lpali semmandapatty road including construction of Retaining jwall at kam. 1/10, 2/6, 2/8 and [Reconstruction of Box culvert }cm.2/8 (i), (i) and Extra length of liom 1.60 255.00 Te \orCRIDP 27 P88 Bdappadi Edappadi idening fom Single Lane to intermediate Lane and ‘Strengthening at km 0/0 - 3/0 of WVanavasi- Kuppampatty (via) [Sanarapatty road including Iconstruction of Box Culvert at km lo/10 & 2/4 with dip raising and (Construction of Retaining wall at lkm 0/10, 1/2, 1/6, 1/10 , 2/2 & lava. 700 360.00 [Other Widening Total 460 615.00 |Edappadi Total 4.60 {615.00 TH [5RCRIDPz 2P.aTs6 ‘Dharmapuri Tara [Widening tom Single Lane to lintermediate Lane and. [strengthening at km 0/0 - 2/6 of [siting - Velanur road including Kreconstruction of culvert at Km lor, 0/6, 1/2, 1/8, 1/10, 2/2, 2/6 2.60 390.00, ODR SCP 175 of 211 Patra Section Officer Rs. inLakhs Job Code Division | Constituency Mame of work Length “Amount Ts lpvoRIDP2e 23-755 Dharmapan | Harar [Widening rom Single Lane to Intermediate Lane and [Strengthening at km 2/6 - 5/0 of [sithingi - Velanur road including Ireconstruction of culvert at Ken 2/8, 3/4, 3/6 @, (i), 3/8, 3/10, 14/4, 4/6, 4/10 and construction of retaining wall at km 4/6 20 31500 TE (ar cRIOz | PTB Dharmapan | Harur \Widening trom Single Lane to lintermediate Lane and [Strengthening at km 5/0 - 7/0 of landiyur - Ammapet road jinctuding reconstruction of culvert Jat Km 5/2, 5/4 B00 78.00 lOther Widening Total 7.00 1123.00, [Dharmapurl Total "7.00 1123.00, aT [orORDP2e) Krishnagini | Bargur ZaPATST [Widening fom Single Lane to jintermediate Lane and Strengthening at km 2/0 - 4/0 of JPannadhur - Bandarahalli road to IDTV and Vadamangalam link road |(Road - A) inctuding CD works ané Retaining, Wall 2.00 "300.00 [Other Widening Total 2.00. "300.00 \Kristinagiri Total 2,00 "300.00 (Salem Circle Total 16.60 2358.00 Te FFCRDPE| —Tuppar | Avinash 278 [Widening trom Single Lane to lintermediate Lane and [Strengthening at km 8/0 - 11/8 of javinashi - Kootappalli road jinctuding Construction of box Jculverts at kon 9/10 (i), (i,11/4 in lieu of existing damaged pipe leulverts 3.80 395.00, lOther Widening Total 3.80 395.00 [Tiruppar Total 3.60 "395.00 Te [ST CRDPIZ wesre9 ‘Diarapuram | Dharaparam Widening trom Single Lane to lintermediate Lane and [Strengthening at km 0/0 - 3/0, l4/0 = 5/0 of Dharapuram - |athukampalayam road, inciuding, [Reconstruction of Box Culvert at km 0/4, 0/10, 1/4, 1/8, 2/4, 2/6, 127s), 2/10 & 4/10, 4.00, 310.00, [OvORIDP-27 | Dharaparam |Madathakulal ze-t760 [Widening from Single Lane to intermediate Lane and |Strengthening at km 1/4 - 2/4 of lKotumam - Kallspuram road. linctuding Cross Drainage Works Too 780.00 [Other Widening Total 5.00. 490.00 [Dharapuram Total 5.00 ‘490.00 ODR SCP 176 of 211 Pecabfeai sens inLakte SL.No. Job Code Division Constiency Name of work Length ‘Amount Te IW-CRIDPZ DPT rode Brode West [Widening Wom Single Lane wo lintermediate Lane and [strengthenin ng at km 1/6 = 3/0 of JKolathupalayam - Kongampalayam road (via) Ellapalayam including reconstruction of culvert at lan i/9,2/2,2/11 10, construction of Jetaining wall at km 2/2,2/4 and Jconstruction of drain at km l2/8.2/10 Tao 215.00 TH [OT-ORDPIE 2sP.t7e2 rode nthiyar [Widening tom Single Lane to lintermediate Lane and [Strengthening at km 5/0 - 6/0 [strengthening at tan 6/0 - 6/4 of |Veuiizuppur - Alampalayam road lincluding Reconstriction of [culvert at km 5/2{i), i) & Km 5/8, ldip raising at Km 5/24 and |Construction of Drain at Km 5/0-| Isy6 140 275.00 [Other Widening Total 490.00 [Ecode Total 490.00 [Tiruppur Circle Total 1375.00, cc IDT-ORIDP.ZE PTE Pollachi Salar [Widening trom Single Lane to lintermediate Lane and [strengthening at km 0/0 - 4/6 of Kattampatti ~ Koduval road to \J-Krishnapuram. including Reconstruction of Culvert at km lors, 3/8 wi iyo ‘dening of Culvert at 475.00 [Other Widening Total 460 475.00 [Pollachi Total 4.60 478.00 ee lOT-CRIDPIE ze.tTed Gobi (Gobichetpal yam [Widening fom Single Lane to intermediate Lane and [Strengthening at km 2/0 - 5/0 of Iindranagar-Thoppuvinayagar road jincluding Reconstruction of Box lculver at Km 2/46), 2/¢i) 3/2, 13/10 and 4/2 and retaining wall lat Km 3/10, 4/2 3.00 "300.00 [Other Widening Total 3.00. "300.00 (Gobi Total 3.00 "200.00 Te loroRiDPa 2P.AT5 Udhagat Coanoar IStrengthening at kam 3/2 9/0 of IKaikatty Kolacombai road jinctuding CD works and Protective Iworks. 5.80 490.00, \Strengthening/Improvements lrotal 5.80 490.00 [Gahagai Total 580 490,00 [Coimbatore Ciroio Total 13.40, 1265.00, Tee lOT-CRIDP-I PATE Trichy Tauralyar [Widening from Single Lane to Intermediate Lane and [Strengthening at lan 9/0 - 10/8 of [Putivalam [Edumalas = Abinimangalam- Road including [Reconstruction of Box culverts at lkm 9/2, 9/6 & 10/4 and Bus Lay pve at km 9 6. 1.80 7260.00, [Other Widening Total 180 260.00 ODR SCP 17 of 211 Peete monn Section Offer Rs.in Laks Sk, dob Code DWision | Consttuency Name of work Length ‘Amount Tar [orCRIDP Ze ZUPATET Trichy | Thuralyar hem 0/3 Strengthening at lam 0/0 - 5/0 of \viswambalsamudram lPuliyanchoiai Road via [Bolakrishnampatty including [Construction of Protective wall at 500 240.00 Inotal [Strengthening/Improvements 5.00 240.00 iTeichy Total 6.80 500.00 eB PAT PORDP IE] Tanjavur —|Thiravidaimar ‘dur ‘Arallu [7/10, 8/10 [Widening fom Single Lane to fintermediate Lane and [strengthening at lon 7/0 - 9/6 of [Thiruppanandhal - Kennarakieady - road including freconstruction of culvert at km ‘and construction of JRetaining wall at ka 7/6, 9/2, 9/4 2.60 “420.00 Te zp.area DrcRiDe2|Tanjavar | Papanasam linctuding |Widening trom Single Lane to lintermediate Lane and lstrengthening at lan 0/0 - 2/0 of |Sathiamangalam - Valkkai road Reconstruction of [culvert at Km 0/6, 0/10, 1/64), |i), 1/10 and Construction of Retaining Wall at Km 1/10 200 335.00 70 PATIO lproRbR22| Tanjavar | Peravarani latvalam ~ Including [Widening fom Single Lane to limtermediate Lane and [Strengthening at km 7/0 - 9/0 of Nambivayal road Reconstruction of lculvert at Km 7/6, 7/86), (i, 8/4, 15/6, 8/8 & 8/10 200 322.00 Wt meat loroRioe:|“Tanjavar | Pattukkortal [Reconstruct Widening from Single Lane to lintermediate Lane and [strengthening at km 0/0 - 1/0 of [4B Rajamadam road. including jon of Culvert 0/2 Too 140.00 lOther Widening Total 7.60 3217.00, [Fanjavar Total 7.60 1217.00 WE F-CROP wear, Pudukottal | Aranthang |Widening from Single Lane to intermediate Lane and [Strengthening at km 10/0 - 11/0 lor Okdcur - Theeysthur road jinctuding reconstruction of culvert Jat Kem 10/20),10/2 (M), 10/4,10/8 "200,00 Ts PATS WrcRIDP ae | Pudukotar | Aranthangs lat Km 2/8, ise, 4/20), lave, 4/10 [Widening wom Single Lane to lintermediate Lane and strengthening at ken 2/6 - 5/0 of Ikanur - Thiruppunavasal road including reconstruction of culvert 2/10, 3/2, 3/4, 3/6, 4/210), 4/4, 4/66), 340 F500 ODR SCP 178 of 211 Bast] 22% Section Officer Rs. in Lakhs SLMo. ob Code Division | Constituency Name of work Length ‘Amount WH lorcrIoP mp.tr Padakotiar | Aranthangi [Widening from Single Tane to Iitermediate Lane and lStrengthening at km 4/0 - 5/4, [7/0 = 8/0 of Avudayarkoil - IKottaipattinam road including |reconstruction of box culvert at Kim 4/8, 5/4, 7/2,4 and construction of retaining walt at Km 4/2,4,6, 12/2.8.10 Bad 300.00 [Other Widening Total 5.60 1176.00, [Pudukottai Total 5.80 1175.00, Ts lor cRIOP 2 PATS Tinuvarur [Thirathuraipo| ondt [Widening fom Single Lane to intermediate Lane and [Strengthening at lm 4/0 - 6/0 of |Vilaldeudi ~ Manali road including lReconstruction of Box culvert at ken. 4/6 2.00 272.00 loroRIDP 22 B2A718 Taverns | Thiravarar [Widening fom Single Lane to intermediate Lane and [Strengthening at lem 0/0 - 4/2 of IMangudi - Nagalore - Periyathumbur road. 430 635.00 lOther Widening Total 620 905.00 fravarar Total 6.20 905.00 WH RoR wea [Nagapattinam |Nagapattinam| [Widening irom Single Lane to lintermediate Lane and [Strengthening at laa 4/0 - 5/2 lof Andipandal - Thirumarugal JRoad including Reconstruction lof Box Culvert at Km 4/6, las104, 4/1080 1:20 7200.00, [Other Widening Total 720 7200.00 We \o-CRIDP 27 pare [Nagapattinam |Nagapattina| [Strengthening ai km 0/0 2/20 IManjakolla: - Anthanapettai Road jincluding Reconstruction of box lculvert at km 0/2, 0/4, 1/8 2:20 215.00 We IGECRIOP 2 Ee INagapattinam |Nagapattinam| [Stengthening at lan 0/6 - 1/6 of IManjakollai - Ivansllur Road including Reconstruction of box loulvert at kn 1/2, 1/8 120 132,00 [Strengthening/Improvements lrotal 3.40 347.00 [Nagapattinam Total 5.60. 547.00 7 PCRIDP np.Te0 [Mayiladuthur | Poompuhar a [Strengthening at ken 0/0 - 2/4 of Itherilandur - Kottur Road. 2.40 190.00 Tat FORIDP wp.) [Mayiladuthur| Poompahar a [Strengthening at km 1/0 - 1/6 of [Thirukkadiyur - Kannangudy - Ikitiyur Road including IConstruction of Retaining wall at 1/3-1/6 060 135.00 We RPE naP.aTe2 fMayladuthur| Poompahar a [Strengthening at kan 0/0 - 1/2 of IKaruppur Union Road including IReconstruction of Box culvert at 0/2. 720 760.00 |Strengthening/Improvements Total 4.20 428.00 iMiayiiaduthural Total 4:20 425.00 iTrichy Circle Total 35.20 ‘4769.00 ODR SCP 179 of 211 Cake Ré.inLaths Sie. | JobCode | Division | Constiuency Name of work Length | Amount WH [DCORDPA| —Thent | Bodinayakan [Strengthening at tam 1/0- 1/130 0.18 14.00 239-1183 ur [of Thirumalapuram =~ IMeenatchipuram road Wet [O-OROPA} Theat | Bodinayakan [Strengthening at km 0/0 - 1/6 of| 1.60 | 13800 wap. ur [Meenatchipuram vila - [Dompucheri road including JConstruction of Retaining wall land Drainage Wee [ORDPZ| Then’ | Andipatti [Strengthening at kan 6/4- 9/0 of | 260 | 184.00 e.a7es JAndipatty - Theppampatty road to IGandamanur - Myladumparai road via) Banthuvarpatty —- [Batasamuthiram including construction of retainingwall WE [OLCROPAE| Then | Andipatti [Strengthening at tom 0/0 - 2/0 of | 2.00 | 154.00 DPATEG [Madurai - Theni road to searipatty road (via) Karisalpatty linctuding Reconstruction of culvert at lan0/8 and 1/10 and Iconetruction of Retaining wall [Strengthening/Improvements pose 6.33 | 490.00 [Then Total 6.33__| 490.00 War proroez| Palani Palani Widening from Single Lane to | 200 | 290.00 ese lintermediate Lane and Istrengthening at im 0/0 - 2/0 of IK.c.Patty-Patchalur Road Hincluding Widening of slab culvert lat km 0/8, Widening of Pipe leulvert at kan 0/4 (i, 0/4 (), 0/6 |a), 0/6 «mn, 0/6 (mM, 1/2, 1/4, 1/6 l& 1/10 Construction of Drain st liam 0/2 & 1/2 and Construction of taining wall at km 0/8, 0/10, 1/4 & 1/8 [Other Widening Total 72.00 _| 290.00 [Patani Total 2.00 | 290.00 TE [TGROPZZ) Swvegangat |Manamadurei[Widening from Single Lane to | 200 | 200.00 mPaTes lintermediate Lane and [Strengthening at km 4/0 - 6/0 of [Thirupachethy - Narikeudi road jinctuding Reconstruction of Cutwerts lOther Widening Total 72:00 | 200.00 ivagangal Total 2.00 | 200.00 We [TOROPZ| Ramnad | Tiravadanal [Strengthening at km 3/0-4/0 of] 1.00 | 125.00 2p7e9 layanicudi to Thiruthervilai lAdithiravidar Kudiyiruppu road jincluding Construction of Breast lal at Km 3/4,3/6.9/8 TRO [OFORDP2E|—Ramnad | Paramaleadi [Strengthening at ion 0/0 -2/0 of | 200 | 165.00 2780 |kathanendal - Karuthanendal [Road including CD works |Strengthening/Improvements purer 3.00 | 290.00 (Raman Tora 3.00 | 290.00 | [Madurai Circle Total 13.33 _| 1270.00 Pee ibaleo>s ODR SCP 180 of 211 Section Onticer Re.inLaths sto. | Jobcode | division | Constituency Name of work Length | Amount Wat |oroRbe 22) Tenkasi —|Sankarankow [Widening trom Single Lane to | 820 | 22000 2p.tTet 1 intermediate Lane and [Strengthening at km 1/2 - 3/8, 10/0 ~ 10/6 of Kalugumalai JDevaricilam road including CD wor TH |TORDP Z| —Tenkasi | Vasudevanall Widening Wom Single Lane to | 0.20 E00 zp.aTe2 ur iermediate Lane and [Strengthening at kan 2/4 - 2/6 of lkarvalamvanthenallur - Railway lReeder road including IConstruction of Retaining wall Was PrORDP22|—Tenkasi |Sankarankowi[Widening from Single Lane to | 200 | 182.00 PATS 1 |intermediate Lane and [strengthening at km 0/0 - 2/0 of [Nedungulam - Ramanathapuram oad including Construction of [Breast wall and CD works Tat PrORDP 2] —Tenkaal | Vasudevanall [Widening fom Single Lane to | 040 7.00 wpe ur intermediate Lane and [strengthening at im 0/0 - 0/4 of |Madathupatti- Putiyankudi road [Other Widening Total ‘s80_| $11.00 7a [oroRbe 2a) —Tenkast |Kadayanallur [Strengthening at km 0/0-1/7 | 1.70 | 128.00 DBP-AT5 fRoad branching from km 14/4 of fsivaramapettai - Panpozhi - [sencottal road to IPeriyapillaivalasai including [construction of Box culvert at Km ia [Strongthening/improvements [seen ato | 123.00 Hfenkasi Total 750 | 634.00 TE VRP Virudhunagar] —Trachall Widening trom Sing Lane to | 820 | — 275.00 ‘pT intermediate Lane and strengthening at an 0/0 - 3/20 of INaneudi'-" Muthaneri Road cluding CD works Tar CRORE Viwanagae] Tirichall widening trom ‘Single Tane to | 320 | — 320.00 e107 intermediate ane and ISrengthening at km 2/8 - 4/0, los0 6/0. of Keelaparalachi- feppanicalam Road inchading CD works lother Widening Total a0 | 598.00 Wirwdhunagar Total 6.40 | 598.00 TE [TORO] Tuticorin] Viathikalam Strengthening at im 6/8 ~670 of | 1.20} — 75.00 aP-T88 Mela ArasaradicTherkiukaimed food [Strengthening/improvements [seen 120 | 75.00 Hfuticorin Total 720_| 76.00 Hiiruneivell Cite Total 18.10 | 1204.00. [orand Total 129.63 | 16923.00 Peas Bp [O[R02% ObR ScP 181 of 211 Section Oificer

You might also like