6.0. is) No-19t Highways and Minor Ports (HF2) Department, Dated: 28.08.2022
‘GRIOP 2022. 2028
LUST OF WORKS -OTHER DISTRICT ROAD. SCP
Rein Lakhs
SLMD. | Job Code | Divison | Constituency Name of work Length | Amount
Tay [OTOROP 22) Thinwvallur | Madavaram |Swengthening at km 0/0 - 3/0 of | 3.00 | 480.00
aParat Solavaram = Oralckadu -
|Aruimandai - Perumullaivoyal road
[Strengthening/Improvements
poss 3.00 | 480.00
jravailur Total 3.00 | 480.00
[Chennai Circle Total '3.00 | 480.00
TB |ORDPZE|Tiravannamal] Kipennathur [Widening from Single Lane to | 4.00 | 460.00
PATS ai Iistermediate Lane and
[Strengthening at km 7/0 - 11/0 of
JUsambadi Periyakilambadi road
including Reconstruction of,
Jculvert at Kea 7/2, 7/4, 7/6, 8/4,
ls/s, 9/4, 9/8, 10/4, 10/10
lother Widening Total %00_| 460,00
[Tiruvannamalai Total 4.00 | 460.00.
Tae [TORE] Ranipet_ | Arakdeonam [Widening from Single Lane to | 3.00 | 290.00
23738 lintermediate Lane and
[strengthening at km 0/0 - 3/0 of
lkm 2/4 of Araldconam Thiruvallur
|Road to Chinnamosur Road
[Other Widening Total 3.00 _| 290.00
[Ranipet Total 3.00_| 290.00,
Wid PrGROP A] — Vellore | Kvaithinanie [Widening om Single Tane tw | —1.00~[— 279.00
PAO ‘uppom intermediate Lane and
strengthening at km 0/0 - 1/0 of
Jchitoor - Gudiyatham Road to
[Ramalai Krishnapuram Road
including Reconstruction of Box
culvert at Km 0/2, 0/4(), 0/8,
lo/ 104) 6 0/ 10() and Construction
lo Protective wall at Km 0/2
(Other Widening Total 1.00 _| 379.00
Tat |itORDP-22| Vellore | Kilvaithinank [Strengthening at km 0/0 - 3/8 of | 3.80 | 157.00
etre uppam — |K.V.Kottah Road to Pillanthipatt
[Road including Reconstruction of
lculvert at Km 1/10 (i) & 9/2 and
(Construction of Culvert at Km
1/10 Gi
[Strengthening/improvemonts
eee 157.00
WHE |PTCRDP Z| — Vellore | Anaikatta [Construction of Drain at lan 12/4 146.00
zara2 lor Guruvarajapalayem = -
lOdugathur - Melarasampattu Road
including Construction of
[Retaining wall at Km 10/0-10/250
[Others Total 146.00
[Weliore Total aa0 | 582.00
a4 te, [pea
opR scp 178 of 211 Section OfResin Lake
SL.No.
bode
Division | Consttuency
Name of work
Length
Amount
oro
TROP
PAT
| Cheyyar | Vandavasi
|sravaavady
[Widening fom Single Lane to
lintermediate Lane and
strengthening at lem 2/0 - $/0 of
larcot Tindivanam road to
road including
lReconstruction of Culvert at
lkm.2/4, 2/6, 2/8, 3/2, 3/10 and
[Construction of Culvert at Kim.4/2
300
39000
[Other Widening Total
3.00
"390.00
ra
mP.ine
JOVcRIDP2|~“Cheyyar | Cheyyar
WWayalathur
[Strengthening at lan 1/0 - 1/6 of
~ Blacheri road (via)
larasanipalayam
0.60
35.00
Irotal
\Strengthening/Improvementa
0.60
‘55.00
(Cheyyar Total
360
45,00
Te
joroRIoP 22
Zp
| Thirupathur | Tirapattur
[Widening from Single Lane to
jintermediate Lane and
[Strengthening at km 0/0 - 2/20,
[Strengthening at km 2/20 - 4/60
lot Matrapalli - Pudurnadu Road
lincluding Reconstruction of Box
|culvert at Kin 0/2, 0/10, 1/2, 2/2,
26 Wo, 2/6 Wi), 2/8, 3/6
(Construction of Drain at Km 2/0 -
l2/2 and Construction of Retaining
jwall at Km 0/6, 1/2, 2/6, 2/8, 3/4
4.60
626,00
[Other Widening Total
4.60
626.00
[Thirupathur Total
4.60
{626.00
Te
PATE
[FTCRIDP-22) Kalalcurichi | Sankearapura
[Widening from Single Lane to
lintermediate Lane and
[Strengthening at km 0/0 - 2/0 of
IChinnasalem Pandivankuppam
[Road inciuding reconstruction of
Jculvert at kom 0/4, 1/2, 1/4 &
construction of retaining wall at
lim 0/4-1/4 & 1/8-10.
510.00,
a7
wear
[prcRIDP2=| Kaliacarichi | Sankarapura
{es2/8
[Widening fom Single Lane to
intermediate Lane and
[strengthening at km 2/0 - 3/0 of
|cninnasalem Pandiyanieuppam
|Road including construction of
retaining wall at kon.2/2, 2/4, 2/6
100
191.00
Tae
joroRIDEz
PANE
Kallalariehi | Kalialearichi
|Widening fom Single Lane to
intermediate ane and
[strengthening at km 7/2 - 9/8 of
Ichinnasalem V. Mamandhur Road
lia) Nainarpalayam including
Ireconstruction of culvert at km 8/4
la, (i), (i) & construction of
retaining wall at km 7/10 & 8/2.
260
37800
[Other Widening Total
560.
1079.00
|Kallaicuriobi Total
5.60
1079.00
;wannamalal Circle Total
25.60
3482.00
‘ODR SCP 174 of 211
alSiN,
ob Code
Division
Constiveney
Namo of work
Tae
[orCRIDP Ze
Pang
Cuddalore
Taleud
[Widening trom Single Lane to
listermediate Lane and
[Strengthening at km 6/0 - 8/6,
[Strengthening at km 8/6 - 9/6 of
[Mholudur-Vadagarampoondi road
reconstruction of culvert at Km
6/2, 6/6, 7/6, 8/2, 8/4 & 8/6
(Other Widening Total
720.00
Tee
F-CROP
e750
Cuddalore
Chidambara
[Strengthening at lan 0/0 - 2/2 of
[The road from lam. 192/2 of Trichy-|
\Chidambaram road to Elanangur
Iroad including reconstruction of
Jculverts at km.0/2, 0/10, 1/4 &
1/6
210.00
[Strengthening/improvements
Iota
2.20
210.00
[Cuddalore Total
580
630,00
fllupuram Chrele Total
‘630.00
Te
(oF CRIDP22
BP.
Salem
Gangavalli
[Widening from Single Lane to
lintermediate Lane and
[Strengthening at km 0/0 - 3/0 of
[Thalaivasal ~ Veeraganur Road to
IPunalvasal Road including
IReconstruction of Culvert at
Ikm.0/4, 0/10, 1/4, 2/8 and
fidening of culvert at Km.1/8
3.00
320.00
[Other Widening Total
3.00
320.00
[Salem Total
3.00
'320.00
laroRIbP27
zp-782
Edappadi
‘Omalur
fidening fom Single Lane to
intermediate Lane and
[Strengthening at km 1/6 - 3/1,
[Strengthening at tan 3/1 - 3/2 of
lpali semmandapatty road
including construction of Retaining
jwall at kam. 1/10, 2/6, 2/8 and
[Reconstruction of Box culvert
}cm.2/8 (i), (i) and Extra length of
liom
1.60
255.00
Te
\orCRIDP 27
P88
Bdappadi
Edappadi
idening fom Single Lane to
intermediate Lane and
‘Strengthening at km 0/0 - 3/0 of
WVanavasi- Kuppampatty (via)
[Sanarapatty road including
Iconstruction of Box Culvert at km
lo/10 & 2/4 with dip raising and
(Construction of Retaining wall at
lkm 0/10, 1/2, 1/6, 1/10 , 2/2 &
lava.
700
360.00
[Other Widening Total
460
615.00
|Edappadi Total
4.60
{615.00
TH
[5RCRIDPz
2P.aTs6
‘Dharmapuri
Tara
[Widening tom Single Lane to
lintermediate Lane and.
[strengthening at km 0/0 - 2/6 of
[siting - Velanur road including
Kreconstruction of culvert at Km
lor, 0/6, 1/2, 1/8, 1/10, 2/2, 2/6
2.60
390.00,
ODR SCP 175 of 211
Patra
Section OfficerRs. inLakhs
Job Code
Division | Constituency
Mame of work
Length
“Amount
Ts
lpvoRIDP2e
23-755
Dharmapan | Harar
[Widening rom Single Lane to
Intermediate Lane and
[Strengthening at km 2/6 - 5/0 of
[sithingi - Velanur road including
Ireconstruction of culvert at Ken
2/8, 3/4, 3/6 @, (i), 3/8, 3/10,
14/4, 4/6, 4/10 and construction of
retaining wall at km 4/6
20
31500
TE
(ar cRIOz |
PTB
Dharmapan | Harur
\Widening trom Single Lane to
lintermediate Lane and
[Strengthening at km 5/0 - 7/0 of
landiyur - Ammapet road
jinctuding reconstruction of culvert
Jat Km 5/2, 5/4
B00
78.00
lOther Widening Total
7.00
1123.00,
[Dharmapurl Total
"7.00
1123.00,
aT
[orORDP2e) Krishnagini | Bargur
ZaPATST
[Widening fom Single Lane to
jintermediate Lane and
Strengthening at km 2/0 - 4/0 of
JPannadhur - Bandarahalli road to
IDTV and Vadamangalam link road
|(Road - A) inctuding CD works ané
Retaining, Wall
2.00
"300.00
[Other Widening Total
2.00.
"300.00
\Kristinagiri Total
2,00
"300.00
(Salem Circle Total
16.60
2358.00
Te
FFCRDPE| —Tuppar | Avinash
278
[Widening trom Single Lane to
lintermediate Lane and
[Strengthening at km 8/0 - 11/8 of
javinashi - Kootappalli road
jinctuding Construction of box
Jculverts at kon 9/10 (i), (i,11/4 in
lieu of existing damaged pipe
leulverts
3.80
395.00,
lOther Widening Total
3.80
395.00
[Tiruppar Total
3.60
"395.00
Te
[ST CRDPIZ
wesre9
‘Diarapuram | Dharaparam
Widening trom Single Lane to
lintermediate Lane and
[Strengthening at km 0/0 - 3/0,
l4/0 = 5/0 of Dharapuram -
|athukampalayam road, inciuding,
[Reconstruction of Box Culvert at
km 0/4, 0/10, 1/4, 1/8, 2/4, 2/6,
127s), 2/10 & 4/10,
4.00,
310.00,
[OvORIDP-27 | Dharaparam |Madathakulal
ze-t760
[Widening from Single Lane to
intermediate Lane and
|Strengthening at km 1/4 - 2/4 of
lKotumam - Kallspuram road.
linctuding Cross Drainage Works
Too
780.00
[Other Widening Total
5.00.
490.00
[Dharapuram Total
5.00
‘490.00
ODR SCP 176 of 211
Pecabfeai sensinLakte
SL.No.
Job Code
Division
Constiency
Name of work
Length
‘Amount
Te
IW-CRIDPZ
DPT
rode
Brode West
[Widening Wom Single Lane wo
lintermediate Lane and
[strengthenin
ng at km 1/6 = 3/0 of
JKolathupalayam - Kongampalayam
road (via) Ellapalayam including
reconstruction of culvert at lan
i/9,2/2,2/11
10, construction of
Jetaining wall at km 2/2,2/4 and
Jconstruction of drain at km
l2/8.2/10
Tao
215.00
TH
[OT-ORDPIE
2sP.t7e2
rode
nthiyar
[Widening tom Single Lane to
lintermediate Lane and
[Strengthening at km 5/0 - 6/0
[strengthening at tan 6/0 - 6/4 of
|Veuiizuppur - Alampalayam road
lincluding
Reconstriction of
[culvert at km 5/2{i), i) & Km 5/8,
ldip raising
at Km 5/24 and
|Construction of Drain at Km 5/0-|
Isy6
140
275.00
[Other Widening Total
490.00
[Ecode Total
490.00
[Tiruppur Circle Total
1375.00,
cc
IDT-ORIDP.ZE
PTE
Pollachi
Salar
[Widening trom Single Lane to
lintermediate Lane and
[strengthening at km 0/0 - 4/6 of
Kattampatti
~ Koduval road to
\J-Krishnapuram. including
Reconstruction of Culvert at km
lors, 3/8 wi
iyo
‘dening of Culvert at
475.00
[Other Widening Total
460
475.00
[Pollachi Total
4.60
478.00
ee
lOT-CRIDPIE
ze.tTed
Gobi
(Gobichetpal
yam
[Widening fom Single Lane to
intermediate Lane and
[Strengthening at km 2/0 - 5/0 of
Iindranagar-Thoppuvinayagar road
jincluding Reconstruction of Box
lculver at Km 2/46), 2/¢i) 3/2,
13/10 and 4/2 and retaining wall
lat Km 3/10,
4/2
3.00
"300.00
[Other Widening Total
3.00.
"300.00
(Gobi Total
3.00
"200.00
Te
loroRiDPa
2P.AT5
Udhagat
Coanoar
IStrengthening at kam 3/2 9/0 of
IKaikatty Kolacombai road
jinctuding CD works and Protective
Iworks.
5.80
490.00,
\Strengthening/Improvements
lrotal
5.80
490.00
[Gahagai Total
580
490,00
[Coimbatore
Ciroio Total
13.40,
1265.00,
Tee
lOT-CRIDP-I
PATE
Trichy
Tauralyar
[Widening from Single Lane to
Intermediate Lane and
[Strengthening at lan 9/0 - 10/8 of
[Putivalam
[Edumalas
= Abinimangalam-
Road including
[Reconstruction of Box culverts at
lkm 9/2, 9/6 & 10/4 and Bus Lay
pve at km 9
6.
1.80
7260.00,
[Other Widening Total
180
260.00
ODR SCP 17 of 211
Peete monn
Section OfferRs.in Laks
Sk,
dob Code
DWision | Consttuency
Name of work
Length
‘Amount
Tar
[orCRIDP Ze
ZUPATET
Trichy | Thuralyar
hem 0/3
Strengthening at lam 0/0 - 5/0 of
\viswambalsamudram
lPuliyanchoiai Road via
[Bolakrishnampatty including
[Construction of Protective wall at
500
240.00
Inotal
[Strengthening/Improvements
5.00
240.00
iTeichy Total
6.80
500.00
eB
PAT
PORDP IE] Tanjavur —|Thiravidaimar
‘dur
‘Arallu
[7/10, 8/10
[Widening fom Single Lane to
fintermediate Lane and
[strengthening at lon 7/0 - 9/6 of
[Thiruppanandhal - Kennarakieady -
road including
freconstruction of culvert at km
‘and construction of
JRetaining wall at ka 7/6, 9/2, 9/4
2.60
“420.00
Te
zp.area
DrcRiDe2|Tanjavar | Papanasam
linctuding
|Widening trom Single Lane to
lintermediate Lane and
lstrengthening at lan 0/0 - 2/0 of
|Sathiamangalam - Valkkai road
Reconstruction of
[culvert at Km 0/6, 0/10, 1/64),
|i), 1/10 and Construction of
Retaining Wall at Km 1/10
200
335.00
70
PATIO
lproRbR22| Tanjavar | Peravarani
latvalam ~
Including
[Widening fom Single Lane to
limtermediate Lane and
[Strengthening at km 7/0 - 9/0 of
Nambivayal road
Reconstruction of
lculvert at Km 7/6, 7/86), (i, 8/4,
15/6, 8/8 & 8/10
200
322.00
Wt
meat
loroRioe:|“Tanjavar | Pattukkortal
[Reconstruct
Widening from Single Lane to
lintermediate Lane and
[strengthening at km 0/0 - 1/0 of
[4B Rajamadam road. including
jon of Culvert 0/2
Too
140.00
lOther Widening Total
7.60
3217.00,
[Fanjavar Total
7.60
1217.00
WE
F-CROP
wear,
Pudukottal | Aranthang
|Widening from Single Lane to
intermediate Lane and
[Strengthening at km 10/0 - 11/0
lor Okdcur - Theeysthur road
jinctuding reconstruction of culvert
Jat Kem 10/20),10/2 (M), 10/4,10/8
"200,00
Ts
PATS
WrcRIDP ae | Pudukotar | Aranthangs
lat Km 2/8,
ise, 4/20),
lave, 4/10
[Widening wom Single Lane to
lintermediate Lane and
strengthening at ken 2/6 - 5/0 of
Ikanur - Thiruppunavasal road
including reconstruction of culvert
2/10, 3/2, 3/4, 3/6,
4/210), 4/4, 4/66),
340
F500
ODR SCP 178 of 211
Bast] 22%
Section OfficerRs. in Lakhs
SLMo.
ob Code
Division | Constituency
Name of work
Length
‘Amount
WH
lorcrIoP
mp.tr
Padakotiar | Aranthangi
[Widening from Single Tane to
Iitermediate Lane and
lStrengthening at km 4/0 - 5/4,
[7/0 = 8/0 of Avudayarkoil -
IKottaipattinam road including
|reconstruction of box culvert at Kim
4/8, 5/4, 7/2,4 and construction
of retaining walt at Km 4/2,4,6,
12/2.8.10
Bad
300.00
[Other Widening Total
5.60
1176.00,
[Pudukottai Total
5.80
1175.00,
Ts
lor cRIOP 2
PATS
Tinuvarur [Thirathuraipo|
ondt
[Widening fom Single Lane to
intermediate Lane and
[Strengthening at lm 4/0 - 6/0 of
|Vilaldeudi ~ Manali road including
lReconstruction of Box culvert at
ken. 4/6
2.00
272.00
loroRIDP 22
B2A718
Taverns | Thiravarar
[Widening fom Single Lane to
intermediate Lane and
[Strengthening at lem 0/0 - 4/2 of
IMangudi - Nagalore -
Periyathumbur road.
430
635.00
lOther Widening Total
620
905.00
fravarar Total
6.20
905.00
WH
RoR
wea
[Nagapattinam |Nagapattinam|
[Widening irom Single Lane to
lintermediate Lane and
[Strengthening at laa 4/0 - 5/2
lof Andipandal - Thirumarugal
JRoad including Reconstruction
lof Box Culvert at Km 4/6,
las104, 4/1080
1:20
7200.00,
[Other Widening Total
720
7200.00
We
\o-CRIDP 27
pare
[Nagapattinam |Nagapattina|
[Strengthening ai km 0/0 2/20
IManjakolla: - Anthanapettai Road
jincluding Reconstruction of box
lculvert at km 0/2, 0/4, 1/8
2:20
215.00
We
IGECRIOP 2
Ee
INagapattinam |Nagapattinam|
[Stengthening at lan 0/6 - 1/6 of
IManjakollai - Ivansllur Road
including Reconstruction of box
loulvert at kn 1/2, 1/8
120
132,00
[Strengthening/Improvements
lrotal
3.40
347.00
[Nagapattinam Total
5.60.
547.00
7
PCRIDP
np.Te0
[Mayiladuthur | Poompuhar
a
[Strengthening at ken 0/0 - 2/4 of
Itherilandur - Kottur Road.
2.40
190.00
Tat
FORIDP
wp.)
[Mayiladuthur| Poompahar
a
[Strengthening at km 1/0 - 1/6 of
[Thirukkadiyur - Kannangudy -
Ikitiyur Road including
IConstruction of Retaining wall at
1/3-1/6
060
135.00
We
RPE
naP.aTe2
fMayladuthur| Poompahar
a
[Strengthening at kan 0/0 - 1/2 of
IKaruppur Union Road including
IReconstruction of Box culvert at
0/2.
720
760.00
|Strengthening/Improvements
Total
4.20
428.00
iMiayiiaduthural Total
4:20
425.00
iTrichy Circle Total
35.20
‘4769.00
ODR SCP 179 of 211
CakeRé.inLaths
Sie. | JobCode | Division | Constiuency Name of work Length | Amount
WH [DCORDPA| —Thent | Bodinayakan [Strengthening at tam 1/0- 1/130 0.18 14.00
239-1183 ur [of Thirumalapuram =~
IMeenatchipuram road
Wet [O-OROPA} Theat | Bodinayakan [Strengthening at km 0/0 - 1/6 of| 1.60 | 13800
wap. ur [Meenatchipuram vila -
[Dompucheri road including
JConstruction of Retaining wall
land Drainage
Wee [ORDPZ| Then’ | Andipatti [Strengthening at kan 6/4- 9/0 of | 260 | 184.00
e.a7es JAndipatty - Theppampatty road to
IGandamanur - Myladumparai road
via) Banthuvarpatty —-
[Batasamuthiram including
construction of retainingwall
WE [OLCROPAE| Then | Andipatti [Strengthening at tom 0/0 - 2/0 of | 2.00 | 154.00
DPATEG [Madurai - Theni road to
searipatty road (via) Karisalpatty
linctuding Reconstruction of culvert
at lan0/8 and 1/10 and
Iconetruction of Retaining wall
[Strengthening/Improvements
pose 6.33 | 490.00
[Then Total 6.33__| 490.00
War proroez| Palani Palani Widening from Single Lane to | 200 | 290.00
ese lintermediate Lane and
Istrengthening at im 0/0 - 2/0 of
IK.c.Patty-Patchalur Road
Hincluding Widening of slab culvert
lat km 0/8, Widening of Pipe
leulvert at kan 0/4 (i, 0/4 (), 0/6
|a), 0/6 «mn, 0/6 (mM, 1/2, 1/4, 1/6
l& 1/10 Construction of Drain st
liam 0/2 & 1/2 and Construction of
taining wall at km 0/8, 0/10,
1/4 & 1/8
[Other Widening Total 72.00 _| 290.00
[Patani Total 2.00 | 290.00
TE [TGROPZZ) Swvegangat |Manamadurei[Widening from Single Lane to | 200 | 200.00
mPaTes lintermediate Lane and
[Strengthening at km 4/0 - 6/0 of
[Thirupachethy - Narikeudi road
jinctuding Reconstruction of
Cutwerts
lOther Widening Total 72:00 | 200.00
ivagangal Total 2.00 | 200.00
We [TOROPZ| Ramnad | Tiravadanal [Strengthening at km 3/0-4/0 of] 1.00 | 125.00
2p7e9 layanicudi to Thiruthervilai
lAdithiravidar Kudiyiruppu road
jincluding Construction of Breast
lal at Km 3/4,3/6.9/8
TRO [OFORDP2E|—Ramnad | Paramaleadi [Strengthening at ion 0/0 -2/0 of | 200 | 165.00
2780 |kathanendal - Karuthanendal
[Road including CD works
|Strengthening/Improvements
purer 3.00 | 290.00
(Raman
Tora 3.00 | 290.00
| [Madurai Circle Total 13.33 _| 1270.00
Pee ibaleo>s
ODR SCP 180 of 211 Section OnticerRe.inLaths
sto. | Jobcode | division | Constituency Name of work Length | Amount
Wat |oroRbe 22) Tenkasi —|Sankarankow [Widening trom Single Lane to | 820 | 22000
2p.tTet 1 intermediate Lane and
[Strengthening at km 1/2 - 3/8,
10/0 ~ 10/6 of Kalugumalai
JDevaricilam road including CD
wor
TH |TORDP Z| —Tenkasi | Vasudevanall Widening Wom Single Lane to | 0.20 E00
zp.aTe2 ur iermediate Lane and
[Strengthening at kan 2/4 - 2/6 of
lkarvalamvanthenallur - Railway
lReeder road including
IConstruction of Retaining wall
Was PrORDP22|—Tenkasi |Sankarankowi[Widening from Single Lane to | 200 | 182.00
PATS 1 |intermediate Lane and
[strengthening at km 0/0 - 2/0 of
[Nedungulam - Ramanathapuram
oad including Construction of
[Breast wall and CD works
Tat PrORDP 2] —Tenkaal | Vasudevanall [Widening fom Single Lane to | 040 7.00
wpe ur intermediate Lane and
[strengthening at im 0/0 - 0/4 of
|Madathupatti- Putiyankudi road
[Other Widening Total ‘s80_| $11.00
7a [oroRbe 2a) —Tenkast |Kadayanallur [Strengthening at km 0/0-1/7 | 1.70 | 128.00
DBP-AT5 fRoad branching from km 14/4 of
fsivaramapettai - Panpozhi -
[sencottal road to
IPeriyapillaivalasai including
[construction of Box culvert at Km
ia
[Strongthening/improvements
[seen ato | 123.00
Hfenkasi Total 750 | 634.00
TE VRP Virudhunagar] —Trachall Widening trom Sing Lane to | 820 | — 275.00
‘pT intermediate Lane and
strengthening at an 0/0 - 3/20 of
INaneudi'-" Muthaneri Road
cluding CD works
Tar CRORE Viwanagae] Tirichall widening trom ‘Single Tane to | 320 | — 320.00
e107 intermediate ane and
ISrengthening at km 2/8 - 4/0,
los0 6/0. of Keelaparalachi-
feppanicalam Road inchading CD
works
lother Widening Total a0 | 598.00
Wirwdhunagar Total 6.40 | 598.00
TE [TORO] Tuticorin] Viathikalam Strengthening at im 6/8 ~670 of | 1.20} — 75.00
aP-T88 Mela ArasaradicTherkiukaimed
food
[Strengthening/improvements
[seen 120 | 75.00
Hfuticorin Total 720_| 76.00
Hiiruneivell Cite Total 18.10 | 1204.00.
[orand Total 129.63 | 16923.00
Peas
Bp [O[R02%
ObR ScP 181 of 211 Section Oificer