Station XN Mobile Transformer 110X Acceptance Test Procedure 10.2. Transformer 110X Control Cabinet Heaters, Lights, & Convenience Outlet Operation Test 6 10.3 Transformer 110X Cooling System Operation Test 6 10.4 ‘Transformer 110X Local Alarm Annunciation & Sudden Pressure [Lockout] Relay Operation Test. essen iW Signatures 3 Equipment Description and Det: ‘This Mobile Transformer requires three sources of AC power, including 115 kV AC, a normal AC station service via the onboard auxiliary transformer, and an alternate AC 208/240V source via either a dry type 208/240V transformer or a 208/240V 3-transformer bank constructed within the designated station. ‘These three sources are essential to the proper operation of this Mobile Transformer, especially seen with the loss of No. | and No. 2 Cooling alarms, Unlike traditional FOA transformers, the Mobile Transformer does not correspond with Operating Procedure 306 and will trip in the event that both No. 1 and No. 2 Cooling are lost ‘This Mobile Transformer also contains an optional Circuit Switcher that may be used, depending on the existing configuration of the designated station. It should be understood that when the circuit switcher is disconnected, there will be no associated alarms. 4 Present Status of Equipment New Mobile Transformer 110X at Station XXX has been installed in conjunction with new 115 kV Mobile Circuit Switcher CS779. ‘The transformer control wiring has been modified and tested in the field by the NSTAR Field Engineering Department, following the early identification of many design and wiring errors in the control cireuitry. The transformer has also undergone standard installation testing, also by the NSTAR Field Engineering Department. 5 Related Acceptance Test & Pickup Procedures Related procedures are listed below. These will be performed on dates to be determined. © Station XXX 115 kV Mobile Circuit Switcher CS779 Acceptance Test Procedure © Station XXX 115 kV Mobile Cirouit Switcher CS779 & Mobile Transformer 110X Pickup Procedure 6 Transformer Acceptance Test Objectives & Scope NOTE: No equipment will be energized during this test, J.Moskos Page 2 of 18 Revision 1 05-2007 Statton 3300 Mobile Transformer 1OX Acceptance Test Procedure Main tank top oil temperature monitor operation @ Sensor/display calibration O Analog output G Signal range (mA): O Engineering units range: Calibration: Winding hotspot temperature monitor operation Sensor/display calibration Analog output O Signal range (mA): © Engineering units rang Calibration: 8.2 Current Transformer (CT) Test Results Ratio O Metering/Protection CT's OQ Winding Temperature/Hot Spot CT Line drop compensator CT © Current passed through all CT circuits O Metering/Protection CT's O Winding Temperature/Hot Spot CT O Line drop compensator CT 8.3 Transformer Secondary Cable Test Results Check and review Transformer | 10X Secondary Cable dielectric test results O High Voltage DC (Kenotron) O Check and review Transformer 110X Secondary Cable phasing test results Q Ring out from transformer secondary box to secondary breaker cubicle 9 Transformer & 115 kV Tk ion Visual Inspection 9.1 Preliminary Checks a 9.2 LIS KV Board Section Condition Check all indicators and controls are properly mounted Cheek all labels & markers Check wire terminals and labels LMoskos Page 4 of 18) Revision 1 05-2007 Station XXX Mobile Transformer 110% Acceptance Test Procedure 9.4 Transformer Control Cabinet(s) Condition Check door & gasket condition Check locks Check external & intemal hardware tightness Check bottom of Control Cabinet for loose parts Check wire terminals, labels, & grounds Verify fuse ratings are correct Verify that fuses are not blown oooooon 10 Transformer Operational Tests 10.1 Preliminary Cheeks a 10.2 Transformer 110X Control Cabinet Heaters, Lights, & Convenience Qutlet Operation Test Close CB8-7 inside control cabinet Check all control cabinet heaters are working Check all control cabinet lights are working Verify door switches shut off lights Check control cabinet standard convenience outlet RE-I is working by verifying that green indicating light is on Open CB8-7 inside control cabinet and verify that all heaters, lights and outlet indicating light tum off, Oo ooooo 10.3 Transformer 110X Cooling System Operation Test No.1 Cooling Manual Operation Test Verify that CB8-2 and CBS-3 are closed G Put No. 1 Cooling to “Hand” position O Verify that Pump PI and Fan FI turn on Q Return No. 1 Cooling to “Auto” position to turn off 0. Open CB8-2 and CB8-3 to disable No. 1 Cooling No. 2 Cooling Manual Operation Test O Verify that CB8-4 and CB8-5 are closed Put No. 2 Cooling to “Hand” position Moskos Page 6 of 18 Revision 1 05-2007 Station XXX Mobile Trunsformer 110X Acceptance Test Procedure Loss of Normal AC Station Service Q Preliminary Cheeks: Verify that the “LOSS OF NORMAL/ONBOARD STATION SERVICE” alarm is clear O Verity that all trips are cleared Simulate 110 kV via removing the paddle of the 27 NGV relay Simulate Normal AC Station Verify that all alarms remain cleared Simulate Loss of Normal AC Station Service Verify that “LOSS OF NORMAL AC STATION SERVICE” alarm ignites Acknowledge alarm on local annuneiator to seal in Retum the Normal AC Station Service and verily that the alarm distinguishes, Now replace the paddle of the 27 NGV relay to simulate loss of 115 kV Verify simulation of Normal AC Station Service Simulate Loss of Normal AC Station Service Verify that the alarm does not come in as it is supervised by 115 kV ooococooooo Loss of External AC Station service Preliminary Checks: Verify all alarms and trips are cleared Remove Alternate Station Service by pulling Fuse 8-32 Verify “LOSS OF EXTERNAL AC STATION SERVICE” alarm ignites after 1 minute Acknowledge alarm to seal in Switch Alternate Station Service Alarm Cutoff (disagreement toggle) to“ALARM CUTOFF” position Restore Alternate Station Service by replacing Fuse 8-32 Verify that the “LOSS OF EXTERNAL AC STATION SERVICE” alarm is present Acknowledge alarm to seal in Retum Alarm Cutoff to “Normal” position Verify that the “LOSS OF EXTERNAL AC STATION SERVICE” alarm has been removed ‘Total Loss of AC Station Service or AC Station Service Reversal ooooo oooo a Q Verify that the 27 NGV paddle is in, simulating the loss of 115 kV Potential Pull Fuse 8-32 to remove Alternate Station Service Pull Fuse 8-33 to remove Total AC Station Service Q Verify the absence of the “LOSS OF AC CONTROL POWER” alarm on transformer local annunciator and all trips are cleared Q Simulate 115 kV Potential via the removal of the 27 NVG lower paddle Q Verify “TRANSFORMER 110X MISCELLANEOUS” station annunciator alarm @ Verify SCADA receives “TRANSFORMER 1 10X MISCELLANEOUS” alarm @ Acknowledge “TRANSFORMER 110X MISCELLANEOUS” alarm on station annunciator Q Verify “TRANSFORMER 110X MISCELLANEOUS” alarm seals in (will not clear) on station annunciator JEMoskos Page 8 of 18 Revision 1 05-2007 Station XAX Mobile Transformer LIOX Acceptance Test Procedure G1 Verify that the “LOCAL/REMOTE” switch is set to “REMOTE” in the Circuit Switeher Control Cabinet Open the Circuit Switcher control eabinet door Verify that the “LOSS OF REMOTE TRIPPING CLOSING CIRCUIT SWITCHER” alarm is present Acknowledge alarm to seal in Simulate the door is closed by pressing the Door Switch (DS) Verify that the alarm clears on the Transformer local annunciator ‘Turn the “LOCAL/REMOTE” Switch to “LOCAL” Verify that the “LOSS OF REMOTE TRIPPING CLOSING CIRCUIT SWITCHER” alarm is present Acknowledge the alarm to seal in Return the switch to the “REMOTE” position ‘Verify that the alarm clears on the Transformer local annunciator Remove the “CONTROL” 08-1 Slug in the Cireuit Switcher Control Cabinet Verify that the “LOSS OF REMOTE TRIPPING CLOSING CIRCUIT SWITCHER” alarm is, present Acknowledge alarm to seal in Replace the “CONTROL” 08-1 Slug Verify that the alarm clears Close the Circuit Switcher Control Cabinet Gas Accumulator Relay Trip Pressure Relief Device Operation ‘Trip Simulate a high pressure of 8 psi by pressing the operating arm located next to the reset arm Verify that the “Pressure Relief Device Operation Trip” alarm is present Verify that the “Transformer Lockout Relay Trip” alarm is present Verify that the Transformer Lockout Relay has tripped and locked out Acknowledge alarms on local annunciator to seal in Press the reset arm to clear simulated main tank pressure relief device operation Verify that the “Pressure Relief Device Operation Trip” alarm is cleared Reset the Transformer Lockout Relay Verify that the “Transformer Lockout Relay Trip” alarm is cleared ‘Sudden Pressure Relay Operation Trip O Preliminary Checks O Verify that the 86T Lockout Relay is in “RESET” position Manually simulate a trip by pressing spring-loaded contact on the backside of Sudden Pressure Lockout Relay Q Verify “SUDDEN PRESSURE RELAY OPERATION TRIP” alarm ignites Q Verily “86T LOCKOUT RELAY TRIP” alarm ignites Q Acknowledge alarms on local annunciator and ensure alarms seal in 0000 ooocoo ooooo oo ooocgoooco Moskos Page 10 of 18, Revision | 05.2007 Station XXX Mobite Transformer 110% Acceptance Test Procedure Simulate a high winding hot spot temperature (> 170 °C) Verify transformer local annunciator alarms for “HIGH HIGH WINDING TEMPERATURE, TRIP” O Verify that 867 Lockout Relay trips and amber light ignites Q Acknowledge alarm(s) on transformer local annunciator Q) Verify “HIGH HIGH WINDING TEMPERATURE TRIP” seals in (will not clear) on transformer local annunciator (This tests ISO Sequence A on transformer local annunciator) O Clear simulated high winding hot spot temperature Reset the 86T Lockout Relay and green light ignites Verify “HIGH HIGH WINDING TEMPERATURE TRIP” clears on transformer local annunciator (This tests ISO Sequence A on transformer local annunciator) Low Oil Level Alarm Q Simulate a low oil level by tuning the Oil Level Gauge on the Transformer Q Verify that the “LOW OIL LEVEL ALARM" is present Q Acknowledge the alarm on the local annunciator to seal in Q Reset the Low Oil Level Gauge Verify that the “LOW OIL LEVEL ALARM” is cleared Low Low Oil Level Trip Simulate a low-low oil level by turning the Oil Level Gauge on the Transformer Q Verify that the “LOW OIL LEVEL ALARM” is present Continue to tum the Oil Level Gauge Verify that the “LOW LOW OIL LEVEL TRIP” alarm is present Q Verify that the 86T Lockout Relay has tripped Verify that the “86T LOCKOUT RELAY” alarm is present G Acknowledge the alarms on the local annunciator to seal in Reset the Low Oil Level Gauge O Verify that the alarms clear Verify that the amber light on the 86T Lockout Relay has extinguished OD Reset the 86T Lockout Relay Ks form. Alarm and Trip Te Q Loss of No. | Cooling Alarm Test Q Preliminary Checks: Q Verify that 115 kV Potential is disconnected O_Verify that Normal Station Service is disconnected Moskos: Page 12 of 18 Revision | 05-2007 Station 2 To u aN Mobile Transformer 110X Acceptance Test Procedure Verify that the white indicator light ignites and no alarms are in Tum off CB8-4 to tum off Pump P2 D Verify that “LOSS OF NO. 2 COOLING” Alarm comes in after 30 seconds Verify that “LOSS OF NO. 1 COOLING” Alarm does not come in G_Verify that “LOSS OF ALL COOLING FLOW TRIP” remains disabled Q Acknowledge alarm on local annuneiator Tum on CB8-4 and verify that “LOSS OF NO. 2 COOLING” alarm clears Q Remove Normal onboard station service simulation G Verify that the amber light ignites and all alarms are cleared ggle Bypass White Light Indication Q Simulate 27T O Verify that White light is on Q Remove 27T Simulate Normal Onboard Station Service OF Verify that White light is on Remove Normal Onboard Station Service Tum the Oil Flow Alarm/Trip Bypass Toggle to On Verify that White light is on Q Return the Oil Flow Alarm/Trip Bypass Toggle to the Normal position Amber Light Indication O Remove 277 Remove Normal Onboard Station Service @ Verify that the Oil Flow Alarms/Trip Bypass Toggle is in “Normal” position Q Verify that the amber light is on Q Loss of All Cooling Flow Trip a a Open CB8-2, CB8-3, CB8-4, and CB8-5 Simulate Normal Station Service @ Verify that “LOSS OF NO. 1 COOLING” and “LOSS OF NO. 2 COOLING” alarms ignite after 30 seconds Verify that “LOSS OF ALL COOLING FLOW TRIP” ignites Verify that the 86T Lockout Relay trips and locks out Acknowledge Alarms Close CB8-2, CB8-3, CB8-4, and CB8-5 Verify that alarms have cleared Return the 86T Lockout Relay to the reset state Simulate 115 kV by removing the paddle of the 27 NGV ‘Turn the No. 1 Cooling and No. 2 Cooling to Hand Verify that No. I and No, 2 Cooling turns on Turn of CB8-2 and CB8-4 to shut off Pumps PI and P2 Verify that the “LOSS OF NO. 1 COOLING” and “LOSS OF NO. 2 COOLING” alarms ignite afier 30 seconds Verify that “LOSS OF ALL COOLING FLOW TRIP” alarm is present Verify that the 86T Lockout Relay trips and locks out O00 Oooooooeooo Moskos Page 14 of 18 Revision 1 05.2007 Station XX Mobile Transformer LOX Acceptance Test Procedure Q Close CB8-5 Q Verify that the “COOLING BKRS OPEN” alarm clears O Verify that all Cooling Circuit Breakers, CB8-2, CB8-3, CB8-4 and CB8-5 are closed Verify that the “COOLING BKRS OPEN” alarm is clear DC Breaker Open O Verify that all DC Circuit Breakers, CB8-21, CB8-22, CB8-23, CB8-24, CB8-25 and CB8-26 are closed Verify that the “DC BREAKER OPEN” alarm is clear Open CB8-21 Verify that the ‘DC BREAKER OPEN? alarm is present Acknowledge alarm on Transformer local annunciator to seal in Close CB8-21 Verify that the “DC BREAKER OPEN” alarm clears Open CB8-22 Verify that the “DC BREAKER OPEN?” alarm is present Acknowledge alarm on Transformer local annunciator to seal in Close CB8-22 Verify that the “DC BREAKER OPEN” alarm clears Open CB8-23 Verify that the “DC BREAKER OPEN” alarm is present Acknowledge alarm on Transformer local annunciator to seal in Close CB8-23 Verify that the “DC BREAKER OPEN” alarm clears Open CB8-24 Verify that the “DC BREAKER OPEN” alarm is present Acknowledge alarm on Transformer local annunciator to seal in Close CB8-24 Verify that the “DC BREAKER OPEN” alarm clears Open CB8-25 Verify that the “DC BREAKER OPEN” alarm is present Acknowledge alarm on Transformer local annunciator to seal in Close CB8-25 Verify that the “DC BREAKER OPEN? alarm clears Open CBE-26 Verify that the “DC BREAKER OPEN” alarm is present Acknowledge alarm on Transformer local annunciator to seal in Close CB8-26 Verify that the “DC BREAKER OPEN” alarm clears, Verify that all DC Cireuit Breakers, CB8-21, CB8-22, CB8-23, CB8-24, CB8-25 and CB8-26 are closed, Verify that the “DC BREAKER OPEN” alarm is clear Ooccoooocoooooooooooooeoeooooooo Relay Failure JMoskos Page 16 of 18 Revision 1 05-2007 ‘Station XXX Mobile Transformer 110% Acceptance Test Procedure Reset transformer 867 Lockout Relay Q Verify all fans on transformer 110X restart Q Place transformer 110X No. 1 and No. 2 Cooling shut off Q Verify “TRANSFORMER 1 10X MISCELLANEOUS" alarm clears on station annuneiator ‘This concludes the Station XXX Transformer 110X Acceptance Test. Notify dispatcher that testing is complete. 11 Signatures Tested By: of Sta. Construction Date: Tested By: of Field Engineering Date: ‘Tested By: _ of Sta, Operations Date: Tested By: of Sta, Engineering Date Tested By’ of SCADA Date: Prepared by: Jennifer Moskos, Supervisor Engineering, Substation Performance & Reliability I.Moskos Page 18 of 18 Revision 1 05-2007

You might also like