NO ITEM PEKERJAAN VOLUME HARGA

1 PONDASI 12 M1 Rp 100,000
2 SLOOP 12 M1 Rp 40,000
3 KOLOM PRAKTIS 14 M1 Rp 40,000
4 RINGBALOK 16 M1 Rp 40,000
5 PAS. BATU MERAH + PLESTER + PLAMIR CET 48 M2 Rp 150,000
6 TEHEL LANTAI 16 M2 Rp 50,000
7 TEMPAT WHUDU + TEHEL + INSTALASI PIPA AIR 1 SET Rp 1,500,000
8 ATAP 20 M2 Rp 70,000
9 PLAFON 20 M2 Rp 70,000
TOTAL
JUMLAH
Rp 1,200,000
Rp 480,000
Rp 560,000
Rp 640,000
Rp 7,200,000
Rp 800,000
Rp 1,500,000
Rp 1,400,000
Rp 1,400,000
Rp 15,180,000