You are on page 1of 1

2.

50
0.15 2''Ø G.I. PIPE S-40
1.51

0.20
0.15

RAMP UP

0.90
1.20 FORCH
NGL.

PLAN SECTION
2.50 1.50

1 DETAIL OF RAMP
SCALE 1:20mts.
S-01

EXISTING 6 COLUMNS
WALL FOOTING AND
CONCRETE FLOORING

SMOOTH CEMENT
FINISH WITH PAINTING
A B C
8.90

A B C 4.45 4.45

CHB WALL PARAPET 2.50


SMOOTH CEMENT 8.90
FINISH WITH PAINTING

4.45 4.45

3
0.60

2.45

2.45
WF1
2.80

2.80

4.90
WF1

2
C1F1

2.00

1.22
WF1
WF1

2.45
NGL.

1.23
0.30

0.30

1
WF1 ON FILL. @ .20m. WF1

1.20
2 LONGITUDINAL SECTION
S-01 SCALE 1:50mts. WF1 WF1

0.98 2.50 1.50 2.08

3 FOUNDATION PLAN
S-01 SCALE 1:50mts.

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION V CY 2020 PROJECT
LOCAL PROGRAM - BUILDING & OTHER STRUCTURE - MULTI-PURPOSED /
CAMARINES SUR 5TH FACILITIES LOCAL INSFRASTRUCTURE PROGRAM
CONSTRUCTION / COMPLETION OF MULTI-PURPOSE BUILDING
LONGITUDINAL SECTION S 5
FOUNDATION PLAN
DISTRICT ENGINEERING OFFICE COORDINATES: N 13.490459, E 123.459477
DETAIL OF RAMP LARRY M. OLIVEROS ARMAN C. IBARRETA JOSE P. GONZAGA NIDA P. PONTILLAS NESTOR P. GORIMBAO 1 3 9
STA. TERESITA, BAAO, CAMARINES SUR BRGY.STA MARIA IRIGA CITY, CAMARINES SUR
DRAFSTMAN ENGINEER II CHIEF, PLANNING AND DESIGN SECTION IN-CHARGE, OFFICER OF THE ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE: DISTRICT ENGINEER DATE:

You might also like