Professional Documents
Culture Documents
50
0.15 2''Ø G.I. PIPE S-40
1.51
0.20
0.15
RAMP UP
0.90
1.20 FORCH
NGL.
PLAN SECTION
2.50 1.50
1 DETAIL OF RAMP
SCALE 1:20mts.
S-01
EXISTING 6 COLUMNS
WALL FOOTING AND
CONCRETE FLOORING
SMOOTH CEMENT
FINISH WITH PAINTING
A B C
8.90
A B C 4.45 4.45
4.45 4.45
3
0.60
2.45
2.45
WF1
2.80
2.80
4.90
WF1
2
C1F1
2.00
1.22
WF1
WF1
2.45
NGL.
1.23
0.30
0.30
1
WF1 ON FILL. @ .20m. WF1
1.20
2 LONGITUDINAL SECTION
S-01 SCALE 1:50mts. WF1 WF1
3 FOUNDATION PLAN
S-01 SCALE 1:50mts.
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION V CY 2020 PROJECT
LOCAL PROGRAM - BUILDING & OTHER STRUCTURE - MULTI-PURPOSED /
CAMARINES SUR 5TH FACILITIES LOCAL INSFRASTRUCTURE PROGRAM
CONSTRUCTION / COMPLETION OF MULTI-PURPOSE BUILDING
LONGITUDINAL SECTION S 5
FOUNDATION PLAN
DISTRICT ENGINEERING OFFICE COORDINATES: N 13.490459, E 123.459477
DETAIL OF RAMP LARRY M. OLIVEROS ARMAN C. IBARRETA JOSE P. GONZAGA NIDA P. PONTILLAS NESTOR P. GORIMBAO 1 3 9
STA. TERESITA, BAAO, CAMARINES SUR BRGY.STA MARIA IRIGA CITY, CAMARINES SUR
DRAFSTMAN ENGINEER II CHIEF, PLANNING AND DESIGN SECTION IN-CHARGE, OFFICER OF THE ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE: DISTRICT ENGINEER DATE: