You are on page 1of 2
Construction of Single Line Dual Gauge Railway Track from Dohazari to Cox’s Bazar via Ramu and Ramu to Gundum near Myanmar Construction Supervision Consulting Services - 1 for Dohazari-Ramu-Cox’s Bazar Section in Joint Venture with sociation a A CANARATL ee te rane ne ue 1 SYSTE STRATEGI Date: 23 November 2023 Mr. Zhang Qingquan Ref: SMECI5060126/CSC1/2023-15021(0M) ‘Acting Contractor's Representative, CCECC — MAX Joint Venture, Dohazari-Cox's Bazar Railway Project (Lot 2) House no. 44, Rose Valley Residential Area (opposite to TV centre), Khulshi, Chattogram, Bangladesh. Dohazari-Cox’s Bazar Railway Project, Civil Works Contract Agreement No. PDICOXIWD1/LOT-2 dated 16/09/2017. Subject: Devised Report of CCIC’s PSI and Test Report (ITR) of Diesel Generator Set (1000 kVA) Manufactured/Supplied by Allam Marine Ltd., Gibson Lane, Melton, UK Rev. A (Lot 2). ‘Addendum No. 1, Volume 2 Amendments, Additional New Sub-Clause A 4.6. GCC Article 4.1 Contractors General Obligations. GCC Article 4.9 Quality Assurance GCC Article 7 Plant, Materials and Workmanship. Specification Sub-Clause A 4.3 Codes and Standards. ‘Specification Sub-Clause A 5.1 Contractor's Quality Assurance Specification Sub-Clause C 1.6 Acceptance Inspection and Testing Specification Sub-Clause E 3.3.36 Three Phase Generator with ATS. ix) Specification Sub-Clause E 4.6.4.4 Backup Generator and Ancillary Equipment. x) Specification Sub-Clause E Design and Construction of Cox's Bazar Station. xi) Technical Specification of Electrical Works Part 01 xii) Our letter no. SMEC/5060126/CSC1/2021-8036(MS) dated 30 September 2021 xiii) Our letter no. SMEC/5060126/CSC1/2022-10959(SB) dated 27 August 2022, xiv) Our letter no. SMEC/5060126/CSC1/2022-11647(FH) dated 19 November 2022. xv) Our letter no, SMEC/5060126/CSC1/2022-11841(FH) dated 10 December 2022. xvi) Our letter no. SMEC/5060126/CSC1/2022-12060(FH) dated 04 January 2023. xvil) Our letter no. SMEC/5060126/CSC1/2023-13751 (MSI) dated 09 July 2023. xviii) Our letter no. SMEC/5060126/CSC1/2023-14301 (DM) 09 September 2023. Dear Sir, In reference to the above, the Engineer received and reviewed your submission of the Devised Report of CCIC’s Pre-Shipment Inspection (PSI) and Test Report (ITR) of Diesel Generator Set (1000 kVA) Manufactured by Allam Marine Ltd., Gibson Lane, Melton, UK Rev. A including its CCIC’s Pre- Shipment Inspection (PSI) and Test Report (ITR) No.: 231400SG05238 dated 28 August 2023 incorporated with Warranty Statement, Generating Set Functional Test Report, Alternator Standard Routine Test Report and Engine Certificate, covering 4. Cover Page, Revision Control Table and Compliance Matrix signed by the Contractor, 2, The Engineer's Approval Letter and Approved Technicat Specification of Electrical Works Part 01, 3. The Engineer's Approval Letter and Approved Manufacturer, 4. The Engineer's Conditional Approval Letters and Conditionally Approved Structural Detailed Drawings of Platform Steel Canopy at Cox's Bazar Station, 8. CCIC's Pre-Shipment Inspection (PSI) and Test Report (ITR) No.: 231400SG05238 dated 28 ‘August 2023 on Diesel Generator Set (1000 kVA) Manufactured by Allam Marine Ltd., Gibson Lane, Melton, UK (Total 01 Set) incorporated with its Diesel Generator Set (1000 kVA) Manufactured by Allam Marine Ltd., Gibson Lane, Melton, UK validated by CCIC. ‘The Engineer's observations and comments on your submission of Devised Report are as follows: (a) The Original Genuine CCIC’s Pre-Shipment Inspection (PSI) and Test Report (ITR) shall be officially submitted to the Engineer for Official Approval. . (b) In accordance to the Contract Requirements of Technical Specification of Electrical Works Part 01 Sub Clause 2.10 which states that "Each Generator shall have In-Built 08 Hours Diesel Fuel Day Tank’. However, there is no official information, documents, confirmation and other assurance at all indicated and provided in your submitted Devised Report. This is Mandatory Requirement; you are to officially provide and submit this Requirement with your Devised Report Rev. B. Qu ‘Address: Plot no - 01, Road - 07, Nasirabad Properties Ltd, Ispahani Hil, Zakir Hossain Road, Khulshi, Chattogram-4225, Bangladesh. Email: CSC, Dona Cox@smec.com (Page 1 of 2) Dohazari to Cox’s Bazar via Ramu and Ramu to Gundum near Myanmar Construction Supervision Consulting Services - 1 for Dohazari-Ramu-Cox’s Bazar Section in Joint Venture with sociation with ce # CANARAILESS teeth rns rene ru ; YSTFA STRATEGI (c) In reference to our letter ref. (xvii) above, Specification Sub-Clause E 4.6.4.4 and in accordance to the Contract Requirements of Technical Specification of Electrical Works Part 01 Sub Clause 2.10 which states that “One more Fuel Tank shall be placed at a suitable location on GF level for 12 Hours". However, there is also no official information, documents, confirmation and other assurance at all indicated and provided in your submitted Devised Report. This is Mandatory Requirement; you are to provide and submit this Requirement with your Devised Report Rev. B. (d) In accordance to the Contract Requirements of Technical Specification of Electrical Works Part 01 Sub Clause 2.10 which states that “The Generator Room will be provided with Acoustic Treatment and Iniet and Outlet Air Attenuators will be provided to reduce Radiated Noise" However, there is also no official information, documents, confirmation and other assurance at all indicated and provided in your submitted Devised Report. This is Mandatory Requirement; you are to provide and submit this Requirement with your Devised Report Rev. B. (e) In accordance to the Contract Requirements of Specification Sub-Clause E 3.3.36 regarding Three Phase Generator with Auto Transfer Switch (ATS). There is no Functional Test Report, Standard Routine Test Report, Certficate as well as Warranty Statement of the ATS found in your submitted Devised Report Rev. B. This is Mandatory Requirement; you are to provide and submit all these Requirements with your Devised Report Rev. B. (A) Inreference to our letter ref. (xvili) above, your Final Official Confirmation is still outstanding since No response and/or confirmation received by the Engineer regarding Notification of Cross World Power Ltd., Dhaka as the Authorised Distributor/Dealer for Diesel Generator 1000kVA for Iconic Building of Cox's Bazar Station including Other Stations and Buildings for its smooth and proper Delivery, Installation, Training, Operational Maintenance, Service Works and Other Required Services in accordance to the Contract Requirements. This is Mandatory Requirement; you are to provide and submit your Official Confirmation on these Requirements with your Devised Report Rev. B Based on our Observations and Comments the above, you are to officially fulfil, provide and submit all the Requirements as per the Engineer's Observations and Comments (a to f) above incorporated into the revised Devised Report Rev. B of the revised CCIC's PSI and Test Report (ITR) Rev. B. Any approval, check, certificate, consent, examination, inspection, instruction, notice, proposal, request, test, or similar act by the Engineer (including absence of disapproval) shall not relieve the Contractor from any responsibility he has under the Contract, including responsibility for errors, omissions, discrepancies and non-compliances [GCC Article 3.1(c)]. The Engineer reminds you that prior to the official submission of the revised Devised Report Rev. B of the revised CCIC’s PSI and Test Report (ITR) Rev. B, your Interal Pre-Submission Quality Check shall be strictly and comprehensively conducted in order to ensure that all the Requirements as per the Engineer's Observations and Comments (a to f) above have been confirmed incorporated into the Final Document. You are to ensure the Quality Assurance and Quality Control, and Full Compliances to the Contract Requirements, particularly (i) to (xi) above including the relevant Codes and Standards. Any unexpected and unnecessary Delays including Disapproval due to all these Outstanding Requirements will be solely and entirely the Contractor's Full Responsibilities and Yours faithfully, a ANM ienasias\"\O™ Acting Project Manager, Dohazari-Cox's Bazar Railway Project. cc: 1. Project Director, Dohazari ~ Cox's Bazar Railway Project, Central Railway Building, Chattogram. ‘Address: Piot no - 07, Road - 07, Nasirabad Properties Ltd, Ispahani Hil, Zakir Hossain Road, Khulshi, Chattogram-4225, Bangladesh, Email: CSC.Doha.Cox@smec.com (Page 2 of 2)

You might also like