All tests required by the codes and standards as well as all manufactures tests have to be
performed. Comply FAT Test @ alkhorayef factory
The test program for the work shop test has to be submitted at least 3 weeks prior to start of
the tests. Noted
Detailed test protocols of all tests performed have to be submitted prior to shipment.
Type tests shall not be performed if the Contractor submits a copy of the type test
certificates for similar type and rating. If not available type test shall be carried out on one
identical unit. Comply
site acceptance test is avaiable when genset is installed and ready for operate with site load
pre-
commissioning and test on completion,
performance test.
The workshop tests described above test shall be repeated on site by the Contractor after
erection. Alkhorayef will make startup for genset when site is ready for operation
Special care shall be taken for setting of protection devices, relays, setting must be done
according to the approved selectivity study. Comply for genset
The aim of the tests is to ensure the proper function of the complete scope. Comply for genset