You are on page 1of 20
os ons: 8) I of Questid Rollo AR-316 (GS) B.Arch, V Semester Examination, November 20}9 Grading System (GS) B ng § ( tence - [] ergy Systems) Time : Three Hours Maximum Marks : 59 Attempt any five questions, All questions carry equal marks, s any two Non-conventional sources of £; Discus: : | , Questions : (2) +5, Discuss design and planning of buildings considering wing ol | 6 Disrisethe concenrorenvicoomene! cities for sustained, aa future. ae | 7. What is the difference between active and passive sola, 1 architecture? 8. Explain different energy efficient materials for the construction of buildings. 1 i) Use appro) sketches v ii) Assumet iii) Assume iy) Alldrawi appropri soe Problem: Commun Local administration ictivities such as ind expert lectures pmall gatherings for fogether or birthday ity of Bhopal, for al upplemented with Programs in the outd ll types of facilities Proper segrega Provided accordit For this purpos« ‘ed concrete Wa, onal No. of Questions : 8) [Total No. of Printed Pages : 2 *esttessingy “Vhat my RollNo, AR-316 (CBGS) m B.Arch., V Semester "en Examination, May 2019 Choice Based Grading System ( ‘CBGS) Building Science-II (Energy System) Time : Three Hours Maximum Marks : 50 we follow for i, 4 Mensioning of «, five questions. Dimension them in proper ropical Climate. Also humid Climates and Total No. of Qu principle of orientation uss with the help of sketches the and design of buildings pact on planning ite climate. 5. Disc and describe their imy with special reference to compos 6. Differentiate between any three of the following: 3) Dry bulb and wet bulb temperature, Relative Humidity and Absolute Humiclty Choi onductive and Convective Heat flow cel Solar Azimuth and Solar Altitude Angle Tir Discuss the task and problem of da efine day light factor. sand give suggestive methodso Note: i) Dra g in Tropical climate: ng for hot and dry and composite climate. ite short notes on the following: Courtyard effect Effective temperature : - A business schor institution for ¢ thermal balance management at E se 15000.0 sq.m. 12.0M. wide roa site. The provisic IN REQUI i nce lobt *. Office & Director Director's attached w tox b b. Director's AR-321 (CBGS) |AR-316 (CBGS) a

You might also like