os
ons: 8) I
of Questid
Rollo
AR-316 (GS)
B.Arch, V Semester
Examination, November 20}9
Grading System (GS)
B ng §
(
tence - []
ergy Systems)
Time : Three
Hours
Maximum Marks : 59
Attempt any five questions,
All questions carry equal marks,
s any two Non-conventional sources of £;
Discus:: | , Questions :
(2)
+5, Discuss design and planning of buildings considering wing
ol
| 6 Disrisethe concenrorenvicoomene! cities for sustained, aa
future. ae
| 7. What is the difference between active and passive sola,
1
architecture?
8. Explain different energy efficient materials for the
construction of buildings. 1 i) Use appro)
sketches v
ii) Assumet
iii) Assume
iy) Alldrawi
appropri
soe
Problem: Commun
Local administration
ictivities such as
ind expert lectures
pmall gatherings for
fogether or birthday
ity of Bhopal, for al
upplemented with
Programs in the outd
ll types of facilities
Proper segrega
Provided accordit
For this purpos«‘ed concrete
Wa, onal No. of Questions : 8) [Total No. of Printed Pages : 2
*esttessingy “Vhat my
RollNo,
AR-316 (CBGS)
m B.Arch., V Semester
"en
Examination, May 2019
Choice Based Grading System ( ‘CBGS)
Building Science-II
(Energy System)
Time : Three Hours
Maximum Marks : 50
we follow for i,
4
Mensioning of «,
five questions.
Dimension them in proper
ropical Climate. Also
humid Climates andTotal No. of Qu
principle of orientation
uss with the help of sketches the
and design of buildings
pact on planning
ite climate.
5. Disc
and describe their imy
with special reference to compos
6. Differentiate between any three of the following:
3) Dry bulb and wet bulb temperature,
Relative Humidity and Absolute Humiclty Choi
onductive and Convective Heat flow cel
Solar Azimuth and Solar Altitude Angle
Tir
Discuss the task and problem of da
efine day light factor.
sand give suggestive methodso Note: i) Dra
g in Tropical climate:
ng for hot and dry and composite climate.
ite short notes on the following:
Courtyard effect
Effective temperature
: - A business schor
institution for ¢
thermal balance management at E
se 15000.0 sq.m.
12.0M. wide roa
site. The provisic
IN REQUI
i nce lobt
*. Office
& Director
Director's
attached w
tox b b. Director's
AR-321 (CBGS)
|AR-316 (CBGS)
a