Professional Documents
Culture Documents
Cs614 Assignment No 02
ID: Bc000000000
Question No 1:
Let suppose, a multinational vehicle manufacturing company recently initiated
its business in Pakistan. Each of the vehicles manufactured by the company
requires 10 weeks for completion. The company management is now
interested to introduce a pipeline where: assembling, wrapping, welding and
stamping activities will be done in parallel.
You are required to calculate the speed up time that could be achieved
after implementing pipeline for manufacturing of 100 vehicles in a row.
Solution:
= 10 + (100-1) x 10/4
= 10 + (99) x 10/4
AR Lucky Team
= 10 + 247.5 = 257.5
Now calculate the speed up Time
NT
Formula : S
T (N 1) T
M
Speed up 1000
257.5
Speed up 3.88times
Question No 2:
Consider the following table structure for storing the student records in a
university, you are required to apply Cluster indexing on the basis of "Age and
City" for the given table.
Solution: