You are on page 1of 40
UNIVERSAL TESTING LABORATORY AND. x a inc. rom Maranay Roctay Rawal Camarines Norte o tole Nur (antvanse 18a Email tin armncrte gmat com S's —_ LAB NO. 1R.0423-0086 1 DATE Apri 28, 2023 CONCRETE STRENGTH TEST REPORT (astm C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 ¥ 3S KI. Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Incloding Construction of Associated Facilities under Packaye 3 LOCATION: Brgy Ranocboe, Calaguas, Vinzoms, Camarines None KINDOF MATERIALS: Concrete Cylinder 6° x 12" SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION. 3000 psi a 28 days DATE SUBMITTED: April 28, 2023 DATE TESTED: Apri 28, 2023, [Sampie | Date Part of Structure or Mark | Molded | Station Represented Days i | PAM TO (noc le vague So tea nt Sertomnes aa Sit qpecinon eto. Witnessed by orapzanan Jerson Yastuera ‘Delta Construction and Marine Services Senior id Tested by Cortted by ro any ‘em ‘Lobie C. Sabodo Tee Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Porok 3 Rarangay Rtas Ras, Camarines Norte ae ly a ‘stile No (6) He 1580927 Email: yrlacamnontesegmal eo ed LAB NO. TR-0473-0076-2 DATE: Aprit 17, 2023 CONCRETE STRENGTH TEST REPORT (astm €-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply. Delivery, Installation and Test of 2x 35 KL. Fuel Storage Tanks for Palumbanes DPF and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Ranoctoe, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6" x 12" SAMPLED BY: Delta Construction and Marine Services SUBMITTED BY: Clifford M. Furagganan ‘SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: Apa 17, 2023 DATE TESTED: Apri 17, 2023, Sample | Date | PartofStructureor | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture) MPa | psi 1 | 08/08/2023 2B | n 319 | 4630 | — Containment Walt 7 i cet ina, } | 2 | 04/08/2023 13 | n | 20 | soo Ll } rm DD APS AN NU KN a Teri Tee? a) eet = Remarks: This report is the result of the test performed on the specimen submitted. witnessed by: e < 2 a ae. Tested by: Certified by: tan V ‘Nem ‘Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bacias, Basud, Camarines Norte Email: Mobile No. (+63) 969-155-9927 uilitcamnoresigmaiicon LAB NO,; TR-0423-0086-2 DATE: April 28, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply. Delivery, Installation and Test of 2x 3S KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brey Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 28, 2023 DATE TESTED: April 28, 2023 F Seine: Rene Le ‘Age in Containment Wall Type of | Uitimate Strength Fracture | SAPS psi 24 5 33.4 | 480 24 TR 28.3 | 4100 Br rR 26.1 | 3780 Wet — Furagganan Ae N OUG fhemarho:Thisreport isthe rst ofthe test pertonmed onthe specimen subnet. Witnessed by: Delta Construction and Marine Services Tested by: ees ones UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Ruroh3 aang Rata, Basal, Capsaines Norte ; Mobile No: (+83) A 135.9007 — Email: vtluarnwertesgmteon eae LAB NO: TR-0423.0076-3 DATE: Aprit 27, 2023 CONCRETE STRENGTH TEST REPORT {astm c-39) CUSTOMER: Deka Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2x 35 KI. Fuel Storage Tanks for Palumbanes DPF and Calaguas DFP Including Construction of Associoted Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6° x 12° SAMPLED BY; Delta Construction and Marine Services SUBMITTED BY: Clifford M, Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: Apt 42, 2023 DATE TESTED: Aprit 17, 2023 "Sample | Date Part of Structure or | Agein | Type of Mark | Molded | Station Represented | Days | Containment Wal 1 | oaro/2023 i 7 _— | Ne Remarks: Ths reports the result of the test performed onthe specimen submited. ms ‘Witnessed by: elo soko ‘Delta Construction and Marine Services Senior Eger, NPC Tested by: Certified by. san Pep 8, Alem Leos = sn \ Technical Manager q Purok 3 Rarangay Bactas, Basu, Camarines Norte Mobile: No. (+83) 9.155:9927 Email: this amnortessgmail coon LAB NO.: TR-0423-0076-1 DATE: April 17, 2023, CONCRETE STRENGTH TEST REPORT (astm C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL. Fuc! Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Delta Construction and Marine Services SUBMITTED BY: Clifford M. Fursgeanan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 17, 2023 DATE TESTED: April 17, 2023 Sample Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded Station Represented | Days | Fracture| MPa psi 1 04/01/2023 16 n 23.4 | 3390 Containment Wall Footing 2 | 04/01/2023 16 1s 14.0 | 2030 = LILI X| it N CU (] ree tree? teed Tine Troe Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: = i ite ‘uragganal Jerson stuera Delta Construction and Marine Services. Senior t, NPC Tested by: \ | Centified by: Lat nician, Technical Manager ‘TEST REPORT ON STRUCTURAL BOLTS CONTRACTOR : DELTA CONSTRUCTION AND MARINE SERVICES PROJECT CONTRACT NO. LOG MSSP 2022-12-135-ALC SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X 35 KL. FUEL STORAGE TANKS FOR PALUMBANES DPP AND CALAGUAS INCLUDING CONSTRCUTION OF ASSOCIATED FACILITIES UNDER PACKAGE 3 PR NO. HO-P1G22-028/PB221107-JLO0405 LOCATION PALUMBANES DPP, CATANDUANES CALAGUAS DDP, CAMARINES NORTE SAMPLED BY —: MARY GRACE MWJARES. ‘SUBMITTED BY: MARY GRACE MLIARES: TESTED BY ERSON GUIEB ENCODEDBY : ERSONGUIEB SAMPLE ANCHOR BOLT SAMPLED AT —: NOT STATED. SOURCE NOT STATED PROPOSED USE : ABOVE MENTIONED PROJECT DESIRED TEST : PHYSICAL TEST SPECIFICATION : AS PER RESULT INPRECISION® “3% MATERIALS TESTING LABORATORY AND GEOTECHNICAL SERVICES CORP ww nprecisontestingcenter com mall festnprecsiontostingcerter com ‘omee: (02) 7110-8933 Tolelax’ (02) 8 atobe: (69) 917-899-3127 Smart (03) 919-991-7347 7499 DATE OF REPORT = APRIL 27, 2023 LABREPORT NO. : N-PCMTC-R-23-07601 DATE SAMPLED: APRIL 25,2023 DATE SUBMITTED : APRIL 27, 2023 DATE TESTED ‘APRIL 27, 2023 ‘SAMPLE ID NOT STATED QUANTITY REPD. : NOT STATED ouk@ ‘Actual sectional Area : mat A 200 e427 2 ___ 3200 rea ea as TENSION TEST TEST RESULT SPECIFICA ELONGATION | YieltPoint [Tense Srengin| Vield Point [Tenste Srengn ELONGATION * Moe Mpa Mpa, Mpa_ % A e997 £55.09 . s ” 1001 0788 a a NOTE : Samples Tested as submited to NPRECISION®. By & NREZ ‘Seqf6r Laboratory Technician at ELISAE. Head (Not valid wihout NPRECISION® Dry Seat cee Attn MATERIALS ENGINEER ‘ACRED #5567 ‘This Laboratory Responsible For Test Only Test Witnessed By: KARIL FAYMAGANA / NPC MARY MUUARES / DELTA CONST. & MARINE SERVICES NPRECISION® 27 DATE RELEASED INPRECISION MATERIALS TESTING LABORATORY IND GEOTECHNICAL SERVICES CORP tem nprecisiontesingcentar com mai Mles@nprecisiontestingcenter com ‘omce: (02) 7119-0033" Tolefax: (02) 8421-7409 Globe: (63) 917-833-3127 Smart (63) 919-081-7347 DATE OF REPORT ‘APRIL 03, 2023, LAB REPORT NO. ‘ARMA -R 23 -05004 PAGE 1 OF 2 TEST REPORT ON REINFORCING STEEL CONTRACTOR —_: DELTA CONSTRUCTION AND MARINE SERVICES PROJECT ‘SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X35 KL FOST FOR PALUMBANES OPP ‘AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER PACKAGE 3 (LOG MSSP 2022-12-135-ALC) LOCATION PALUMBANES DPP & CALAGUAS DPP_ SAMPLED BY = JAYSONM. LACUESA. SUBMITTED BY = JAYSONM. LACUESA TESTED BY ERSON GUIES ENCODED BY —_ RYAN CHRISTIAN AMISOLA, ‘SAMPLE REINFORCING STEEL BARS. SAMPLEDAT —: NOT STATED. DATE SAMPLED. ‘APRIL 08, 2023 ‘SOURCE NOT STATED DATE SUBMITTED ‘APRIL 03, 2023 PROPOSED USE © ABOVE MENTIONED PROJECT DATE TESTED ‘APRIL 03, 2023 DESIRED TEST =: PHYSICAL TEST ‘SAMPLE ID) SB 10.8 12MM ‘SPECIFICATION | ASTMABI5 ‘QUANTITY REPD. =NOT STATED sr ost O73 x 34 39) 45 rr No Crack No Grack | Ne Crack Ne Crack No Grack REQUREVERT Ya PRT Tena Srengh | TSS ie Mpa. Mpa. ato x 2 hi Zoe, 3 Nominal —] Ave: Spacing | Height Gap] Elongation | Variation fr] Phosphorous Sze. om mm mm _| went 96) | content, 96) Tomma—| To max—| 040mm | 8 mex —| Tiwi] 6.0 Wax : fammg—| 84 Max | 0.464 | 46 Max | —12 Mn | 60 Max : NOTE : Samples Tested as submitted to NPRECISION®. ‘This Laboratory Responsible For Test Only By: Test 8 IREZ RALPH IANT- GaP Laboratory Technician ahh eo VAcuESA cugae. NPRECISION® (Not valid without NPRECISION® Dry Seal) 4-93-23 4 DATE ‘MATERIALS ENGINEER RELEASED ‘ACRED #5567 INPRECISION ‘MATERIALS TESTING LABORATORY AND GEOTECHNICAL SERVICES COR? wwa nprecisiontestingcenter com Email hlexenprocisontoringcenter com Comes: (02) 7119-8983 Tolefax 02) 6421-7493 asia Globe: (63) 917-833-3127 Smart (83) 919-991-7347 DATE OF REPORT APRIL. 03, 2023 LAB REPORT NO. ‘ARMA -R- 23 -05904 PAGE 20F 2 TEST REPORT ON REINFORCING STEEL CONTRACTOR — - DELTA CONSTRUCTION AND MARINE SERVICES PROJECT ‘SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X35 KL FOST FOR PALUMBANES DPP ‘AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER PACKAGE 3 (LOG MSSP 2022-12-135-ALC) LOCATION PALUMBANES DPP & CALAGUAS DPP- SAMPLED BY” JAYSONM. LACUESA ‘SUBMITTED BY: JAYSONM. LACUESA TESTED BY ERSON GUIEB ENCODED BY = RYAN CHRISTIAN AMISOLA SAMPLE REINFORCING STEEL BARS SAMPLEDAT NOT STATED DATE SAMPLED APRIL 03, 2023 ‘SOURCE NOT STATED DATE SUBMITTED = APRIL 3, 2023 PROPOSED USE - ABOVE MENTIONED PROJECT DATE TESTED ‘APRIL 03,2023 DESIRED TEST: PHYSICAL TEST SAMPLE ID RSE 16Mid SPECIFICATION: ASTMABI5 QUANTITY REPD. NOT STATED PROPERTIES TESTRESULTS ae ae ; s8mm0 ala PoE ‘[Tenalle Strength] —TSNS oe pa Mpa ato Sw 760 0 an = arial —] Ae Spang | — Hag Gap] ongaton | —varation | Prosphoroae Sc nm an mm, %_|_woight. | Content, 9) Temmd —| 712 wax —| “072 | “6 az —| Tm 6.0 Ma = NOTE : Samples Tested as submited to NPRECISION®. This Laboratory Responsible For Test Only TANT. CAP) ‘Technician JAYSON M. LACUESA , NPRECISION® (Not valid without NPRECISION® Dry Seal) Y- 2-23 vr DATE MATERIALS ENGINEER RELEASED INPRECISION® MATERIALS TESTING LABORATORY IND GEOTECHNICAL SERVICES CORP, ‘nmu.nprecisiontestingcenter com DPWH-BRS. ACCREDITED Ema fles@nprecsiontestingcenter com ‘fice (02) 7119-6639 Telex: (02) 8421-7493 i Giobe (63) 917-833-3127 Smart: (63) 919-991-7347 TEST REPORT ON STRUCTURAL STEEL DATE OF REPORT :: APRIL 03, 2023 LAB REPORT NO. : ARMA-R-23-059048 PAGE 1 OF 3 CONTRACTOR —: DELTA CONSTRUCTION AND MARINE SERVICES PROJECT ‘SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X35 KL FOST FOR PALUMBANES DPP ‘AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER PACKAGE 3 (LOG MSSP 2022-12-135-ALC) LOCATION PALUMBANES DPP & CALAGUAS DPP ‘SAMPLED BY JAYSON M. LACUESA SUBMITTED BY: JAYSONM. LACUESA TESTED BY ERSON C. GUIEB ENCODED BY RYAN CHRISTIAN AMISOLA, ‘SAMPLE MS PLATE ‘SAMPLED AT NOT STATED ‘SOURCE NOT STATED. DATE SAMPLED: APRIL 03, 2023 PROPOSED USE | ABOVE MENTIONED PROJECT DATE SUBMITTED : APRIL 03, 2023 DESIREDTEST : PHYSICAL TEST DATE TESTED: APRIL 03, 2023 SPECIFICATION | ASTMA-36 QUANTITY REPD. : NOT STATED PHYSICAL ANALYSIS TEST RESULT REQUIREMENT NOTE : Samples Tested as submitted to NPRECISION®. Checked, ERI eAMIREZ Seni Technician At ELISA EAUYDA Head (Not valid without NPRECISION® Dry Seal) noe thec MATERIALS ENGINEER ‘ACRED #5567 ‘This Laboratory Responsible for Test Only. ee RALPH IAN ig JA) LACUESA NPRECISION® y- 3-23 DATE RELEASED INPRECISION® “= ‘wm nprecisontestingcenter com mai. fles@nprecsiontesongeenter com Once: (02) 7119-8033 Toefax (02) 6421-7493 Globe: (69) 917-599-9127 Smart (69) 919-999-7947 DATE OF REPORT : APRIL 03, 2023 LAB REPORT NO. : ARMA-R-23-059044 PAGE 2 OF 3 TEST REPORT ON STRUCTURAL STEEL CONTRACTOR PROJECT LOCATION ‘SAMPLED BY ‘SUBMITTED BY TESTED BY ENCODED BY ‘SAMPLE ‘SAMPLED AT ‘SOURCE PROPOSED USE DESIRED TEST ‘SPECIFICATION DELTA CONSTRUCTION AND MARINE SERVICES SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X35 KL FOST FOR PALUMBANES DPP AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER PACKAGE 3 (LOG MSSP 2022-12-135-ALC) PALUMBANES DPP & CALAGUAS DPP JAYSON M. LACUESA JAYSON M, LACUESA ERSON C. GUIEB RYAN CHRISTIAN AMISOLA MS PLATE NOT STATED NOT STATED DATE SAMPLED _ : APRIL 03, 2023, ABOVE MENTIONED PROJECT DATE SUBMITTED : APRIL 03, 2023 PHYSICAL TEST DATE TESTED —: APRIL 03, 2023 ASTM A36 QUANTITY REPD. : NOT STATED PHYSICAL ANALYSIS REQUIREMENT NOTE : Samples Tested as submitted to NPRECISION' ‘This Laboratory Responsible for Test Only. Checked, Test Wit eRwpis Ramirez ANE NA Senigy Laboratory Technician é ates JAYSON Ml. LACUESA ELISA 5/NUYDA LaBordfory Head (Not valid without NPRECISION® Dry Seal) NPRECISION® 43-23 DATE RELEASED INPRECISION? “3 MATERIALS TESTING LABORATORY AND GEOTECHNICAL SERVICES CORP wwn.nprecisiontestingcenter com Email fles@nprecisontestngcentar com ome: (02) 7119-8039 Toloax (02) 84277409 Globe: (63) 917-539-3127 Smart (63) 919.991.7347 DATE OF REPORT : APRIL03, 2023, LAB REPORT NO. : ARMA-R -23 - 059048 PAGE 30F 3 TEST REPORT ON STRUCTURAL STEEL CONTRACTOR —: DELTA CONSTRUCTION AND MARINE SERVICES PROJECT ‘SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X35 KL FOST FOR PALUMBANES DPP ‘AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER PACKAGE 3 (LOG MSSP 2022-12-135-ALC) LOCATION : PALUMBANES DPP & CALAGUAS DPP ‘SAMPLED BY JAYSON M. LACUESA SUBMITTED BY: JAYSON M. LACUESA TESTED BY ERSON C. GUIEB ENCODED BY RYAN CHRISTIAN AMISOLA SAMPLE MS PLATE SAMPLED AT NOT STATED SOURCE NOT STATED DATE SAMPLED: APRIL 03, 2023 PROPOSED USE : ABOVE MENTIONED PROJECT DATE SUBMITTED : APRIL 03, 2023 DESIRED TEST : PHYSICAL TEST DATE TESTED: APRIL 03, 2023, SPECIFICATION : ASTMA-36 QUANTITY REPD. : NOT STATED PHYSICAL ANALYSIS TEST RESULT REQUIREMENT This Laboratory Responsible for Test Only \MIREZ NL e ‘Senigt Laboratory Technician At JAYSO! KL SA ELISA E,KUYDA Li Head (Not valid without NPRECISION® Dry Seal) nce dN ea MATERIALS ENGINEER NPRECISION® ‘ACRED #5567 Y- 3°23 DATE RELEASED va NPRECISION® “a ‘wma: nprecisiontestingcenter com Ema. fleseanprecsiontosungcenter.com fce: (02) 7119-8999. Telefax (02) 8421-7609 elobe: (68) 917-622-2127 Smart: (6) 919-901-7247 DATE OF REPORT APRIL 03, 2023 LAB REPORT NO. ‘ARMA -R = 23 -05904 PAGE 1 OF 2 TEST REPORT ON REINFORCING STEEL CONTRACTOR —_: DELTA CONSTRUCTION AND MARINE SERVICES PROJECT ‘SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2x95 KL FOST FOR PALUMBANES OPP AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER PACKAGE 3 (LOG MSSP 2022-12-135-ALC) LOCATION PALUMBANES DPP & CALAGUAS DP ‘SAMPLED BY: JAYSON M. LACUESA, ‘SUBMITTED BY: JAYSON M. LACUESA ‘TESTED BY ERSON GUIEB ENCODED BY —_° RYAN CHRISTIAN AMISOLA SAMPLE : REINFORCING STEEL BARS SAMPLEDAT —_: NOT STATED DATE SAMPLED ‘APRIL03, 2023 SOURCE NOT STATED. DATE SUBMITTED ‘APRIL G3, 2023 PROPOSED USE: ABOVE MENTIONED PROJECT DATE TESTED ‘APRIL 03, 2023, DESIRED TEST: PHYSICAL TEST ‘SAMPLE ID. SB 10.8 12MM SPECIFICATION | ASTMABI5 ‘QUANTITY REPD, NOT STATED PROPERTIES TEST RESULTS RSB #4] ASEWS | RSET Nominal Size. mim fomm | t2mmd | t2mmo_| t2mmo [Tensile Properties t Yl Port, MPa 367 3636 Tensie Svengt, Pa [702 584 380 555__| TS/YS Reto 19t 447 7.84 152 longaon. 4) 23 2a 20 Unit weight Kom T Variation mess. a as 47 [Detormation, mm { t [Spacing Ave 77 75 7 I O73 —o7e ort I 45 4a ar necner | necnex | nocnek —nociask : : 5 ere : REGUREWENT ed Pot Teale SGT T Moa Mpa Ratio a0 ni oi = Taminal | Ave Spachg | — Fear Gap] Elongation] Varaton Th] rosphovoae Size mm mm rom % | weight, 04) | Content 8 Tomma—| To Max—| O40 Mm —| ~S max—| Timi —| 6.0 Max = ‘1mm —| a4 Max | 048 tn | 46 Max | 17 in| 60 ae [NOTE : Samples Tested as submited to NPRECISION® ‘This Laboratory Responsible For Test Only ‘Laboratory Technician ne wom LACUESA ELISAE. N lal lead ceca By ee e ynez eaibn ant carapann NPRECISION® (Not valid without NPRECISION® Dry Seal) 4-93-23 VRIGIETTENAN PO DATE MATERIALS ENGINEER RELEASED ‘ACRED #5567 INPRECISION® “a wn.nprecisiontestingcenter com malt es@nprecisiontesiingcenter com omice: (02) 7119.0939 Telfax: (02) 8421-7409 Celobe: 68) 917-592-3127 Smart (62) 919-091-7347 DATE OF REPORT APRIL 03, 2023 LAB REPORT NO, ‘ARMA - R23 -05904 PAGE 2.0F 2 TEST REPORT ON REINFORCING STEEL CONTRACTOR __ : DELTA CONSTRUCTION AND MARINE SERVICES PROJECT ‘SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X35 KL FOST FOR PALUMBANES DPP ‘AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER PACKAGE 3 (LOG MSSP 2022-12-135-ALC) LOCATION : PALUMBANES DPP & CALAGUAS DPP SAMPLED BY JAYSONM, LACUESA ‘SUBMITTED BY: JAYSON M. LACUESA TESTED BY ERSON GUIEB ENCODED BY: RYAN CHRISTIAN AMISOLA SAMPLE REINFORCING STEEL BARS SAMPLED AT —: NOT STATED DATE SAMPLED APRIL 03, 2023 SOURCE NOT STATED DATE SUBMITTED APRIL 03, 2023 PROPOSED USE: ABOVE MENTIONED PROJECT DATE TESTED ‘APRIL 03, 2023 DESIRED TEST: PHYSICAL TEST SAMPLE ID SB feud SPECIFICATION | ASTM ABTS QUANTITY REP. NOT STATED PROPERTIES TEST RESULTS, RSa7 temmo a ‘87 1188 18 ay wr 43 52 fe Greek REGUREWENT a Visa PORE Terai Sergi TENS same Mpa pa Ratio SH a0 ar Zoe 7 Naminal | Ave Spas | — Raa SF] Ranga] —Vanatan | PRORPRTTT Sie nm om mm %__| weight) | content. 6) Temma | “ii2 wax | Ove Mn | 64 Maz | TEs] 6.0 Max : NOTE : Samples Tested as submitted to NPRECISION® ‘This Laboratory Responsible For Test Only JAYSON M. LACUESA NPRECISION® (Not valid without NPRECISION® Dry Seal) yr 3-23 \VRIGIETTHAANE N.ESCARPZO DATE MATERIALS ENGINEER RELEASED ‘ACRED #8567 NPRECISION® “3g MATERIALS TESTING LABORATORY AND GEOTECHNICAL SERVICES CORP. ‘win nprecisontestingcenter com Email flesBnprecsiontesingcentercom ‘omee:(02) 7410-8099 Telex: (02) 421-7409 Globe: (63) 917-599-3127 Smart (63) 919-001-7347 DATE OF REPORT : APRIL 03, 2023 LAB REPORT NO. : ARMA-R - 23 -05904A PAGE 1 OF 3 TEST REPORT ON STRUCTURAL STEEL CONTRACTOR DELTA CONSTRUCTION AND MARINE SERVICES PROJECT SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2x36 KL FOST FOR PALUMBANES DPP ‘AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER PACKAGE 3 (LOG MSSP 2022-12-135-ALC) LOCATION PALUMBANES DPP & CALAGUAS DPP SAMPLED BY JAYSON M. LACUESA, SUBMITTED BY: JAYSON M. LACUESA TESTED BY ERSON C. GUIEB ENCODED BY —:_ RYAN CHRISTIAN AMISOLA, SAMPLE MS PLATE SAMPLED AT NOT STATED SOURCE NOT STATED. DATE SAMPLED: APRIL 03, 2023 PROPOSED USE : ABOVE MENTIONED PROJECT DATE SUBMITTED : APRIL 03, 2023 DESIRED TEST : PHYSICAL TEST DATE TESTED — : APRIL03, 2023 SPECIFICATION : ASTMA-36 QUANTITY REP. : NOT STATED PHYSICAL ANALYSIS TEST RESULT REQUIREMENT NOTE : Samples Tested as submitted to NPRECISION®. This Laboratory Responsible for Test Only. vecked By: ERI cAMIREZ Senigf Laboratory Technician Alte ELISA E AUDA LaBaraiéry Head JAYSON)M. LACUESA, (Not valid without NPRECISION® Dry Seal) weoerdlMMe hoes MATERIALS ENGINEER ‘ACRED #5567 NPRECISION® RELEASED INPRECISION® “Sue” MATERIALS TESTING LABORATORY AND GEOTECHNICAL SERVICES CORP wnn.nprecisiontesingcentercom Email fles@oprecsiontestingcentor com ome: (02) 7119-0999 Teloex: (08) 8421-7409 ‘lobe: (63) 917-599-3127 Smart: (63) 919-991-7347 DATE OF REPORT = APRIL03, 2023, LABREPORT NO. : ARMA -R - 23 - 059044 PAGE 20F 3 TEST REPORT ON STRUCTURAL STEEL CONTRACTOR —: DELTA CONSTRUCTION AND MARINE SERVICES PROJECT ‘SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X35 KL FOST FOR PALUMBANES DPP AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER. PACKAGE 3 (LOG MSSP 2022-12-135-ALC) LOCATION PALUMBANES DPP & CALAGUAS DPP SAMPLED BY JAYSON M. LACUESA SUBMITTED BY : JAYSON M. LACUESA TESTED BY ERSON C. GUIEB ENCODED BY RYAN CHRISTIAN AMISOLA SAMPLE MS PLATE ‘SAMPLED AT NOT STATED SOURCE NOT STATED DATE SAMPLED: APRIL 03, 2023 PROPOSED USE : ABOVE MENTIONED PROJECT DATE SUBMITTED : APRIL 03, 2023 DESIRED TEST: PHYSICAL TEST DATE TESTED: APRILO3, 2023 SPECIFICATION : ASTMA-36 QUANTITY REPD. : NOT STATED PHYSICAL ANALYSIS TEST RESULT REQUIREMENT MSP _ eM 601 259.03 41474 50536 28 NOTE : Samples Tested as submitted to NPRECISION' “This Laboratory Responsibia for Test Onl Checked By: ti a a ER RAMIREZ RALEFIIAN L. CAPAAZANA Senigf Laboratory Technician ZL Z Atteskerr ay, JAYSON fl. LACUESA esa 6/NUYDA Labersfory Head (Not valid without NPRECISION® Dry Seal) vncerdl Weslo MATERIALS ENGINEER NPRECISTION® /ACRED #5567 43-23 DATE RELEASED INPRECISION® “3 MATERIALS TESTING LABORATORY AND GEOTECHNICAL SERVICES CORP, ‘ms. precisontestingcenter com Ema flestanprocisiontosingcentor com Ofce: (02) 7179-8999. Telefax (02) 8421-7600 tobe: (68) 917-833-2127 Smart: (2) 919-001-7247 DATE OF REPORT : APRIL 03, 2023, LABREPORTNO. : ARMA-R - 23 - 059048 PAGE 30F 3 TEST REPORT ON STRUCTURAL STEEL CONTRACTOR PROJECT LOCATION ‘SAMPLED BY SUBMITTED BY TESTED BY ENCODED BY SAMPLE SAMPLED AT SOURCE PROPOSED USE DESIRED TEST ‘SPECIFICATION DELTA CONSTRUCTION AND MARINE SERVICES ‘SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X35 KL FOST FOR PALUMBANES DPP AND CALAGUAS DPP INCLUDING CONSTRUCTION OF ASSOCIATE FACILITIES UNDER PACKAGE 3 (LOG MSSP 2022-12-135-ALC) PALUMBANES DPP & CALAGUAS DPP JAYSON M. LACUESA JAYSON M. LACUESA ERSON C. GUIEB. RYAN CHRISTIAN AMISOLA MS PLATE NOT STATED NOT STATED DATE SAMPLED: APRIL 03, 2023, : ABOVE MENTIONED PROJECT DATE SUBMITTED : APRIL 03, 2023 PHYSICAL TEST DATE TESTED: APRIL.O3, 2023 ASTM A-36 QUANTITY REPD. : NOT STATED PHYSICAL ANALYSIS TEST RESULT REQUIREMENT MSP-1 MSP-2 449.80 250 Min, 554.83, 400-550 20 Min, NOTE : Samples Tested as submitted to NPRECISION' ‘This Laboratory Responsible for Test Only. Checked By: ERI IMIREZ Test Witn fm H IAN “ Cat ‘Senigt Laboratory Technician via cugas von (Not valid without NPRECISION® Dry Seal) wecerdl Mees MATERIALS ENGINEER | NPRECISION® ACRED #5567 y- 5-23 DATE RELEASED ae INPRECISION® ‘ww precisiontestingcenter com Ema fles@aprecsiontestingcentar.com DPWH-BRS ACCREDITED ‘ofice:(02) 7119-0099 Telefax (02) 8421-7493 wae Globe: (69) 017-529-9127 Smart: (62) 919-981-7347 DATE OF REPORT LAB REPORT NO. TEST REPORT ON STRUCTURAL BOLTS ‘APRIL 27, 2023 N-PCMTC-R-23- 07601 CONTRACTOR : DELTA CONSTRUCTION AND MARINE SERVICES PROJECT CONTRACT NO. LOG MSSP 2022-12-195-ALC SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2X 35 KL FUEL STORAGE TANKS FOR PALUMBANES DPP AND CALAGUAS INCLUDING CONSTRCUTION OF ASSOCIATED FACILITIES UNDER PACKAGE 3 PR NO. HO-PIG22-026/P8221107-JL00405 LOCATION PALUMBANES DPP, CATANDUANES CALAGUAS DOP, CAMARINES NORTE SAMPLED BY: MARY GRACE MIJARES ‘SUBMITTED BY: MARY GRACE MUIARES. TESTED BY ERSON GUIEB, ENCODEDBY » ERSON GUIEB ‘SAMPLE ANCHOR BOLT SAMPLED AT —: NOT STATED DATE SAMPLED = APRIL 25, 2023 ‘SOURCE NOT STATED DATE SUBMITTED : APRIL27, 2023 PROPOSED USE : ABOVE MENTIONED PROJECT DATE TESTED. ‘APRIL 27, 2023 DESIRED TEST: PHYSICAL TEST SAMPLE ID NOT STATED SPECIFICATION » AS PER RESULT QUANTITY REPD, : NOT STATED MECHANICAL PROPERTIES Diameter a sample (0. ‘Actual x sectional Area = nm 1 32.00 e427 2 2.00 razr us TENSION TEST TEST RESULT SPECIFICATION ELONGATION Yield Point [Tensile Strength] Yield Point [Tensile Strength ELONGATION % Mpa Moa Mpa Mpa % 8 54307 555.09 - “ : 7 54003 567.65 E 5 2 NOTE : Samples Testod as submitted to NPRECISION®. Checked By: ERAS RAMIREZ soli Laboratory Technician Altest ELISA E. NYYDA Labotgton/Head (Not valid without NPRECISION® Dry Seal) \VRIGIETTEUANE NSC MATERIALS ENGINEER ‘ACRED #5567 z0 Test Witnessed By: This Laboratory Responsible For Test Only KARIL FAJUYAGANA / NPC Van MARY GF \CE MUUARES DELTA CONST. & MARINE SERVICES NPRECISION® ya 4 DATE RELEASED DPWH-BRS ACCREDITED naa NPRECISION” ‘wav. oprecisontestingcenter com Ema es@npreasiontesiingcentercom ‘offce:(02) 7119-8993 Telex: (02) 8421-7493 tobe: (63) 917-599-3127 Smart: (63) 919-901-7347 DATE OF REPORT LAB REPORT NO. APRIL 27, 2023 N-POMTC-R-28-07601 TEST REPORT ON STRUCTURAL BOLTS CONTRACTOR : DELTA CONSTRUCTION AND MARINE SERVICES PROJECT CONTRACT NO. LOG MSSP 2022-12-135-ALC SUPPLY, DELIVERY, INSTALLATION AND TEST OF 2 X 35 KL. FUEL STORAGE TANKS FOR PALUMBANES DPP AND CALAGUAS INCLUDING CONSTRCUTION OF ‘ASSOCIATED FACILITIES UNDER PACKAGE 3 PR NO, HO-PIG22-026/P8221107-JL00405 LOCATION PALUMBANES DPP, CATANDUANES CALAGUAS DOP, CAMARINES NORTE SAMPLED BY > MARY GRACE MARES. SUBMITTED BY: MARY GRACE MUIARES. TESTED BY ERSON GUIEB ENCODED BY ° ERSON GUIEB ‘SAMPLE ANCHOR BOLT SAMPLED AT —: NOT STATED DATE SAMPLED: APRIL 25, 2023 SOURCE NOT STATED DATE SUBMITTED : APRIL 27, 2023 PROPOSED USE : ABOVE MENTIONED PROJECT DATE TESTED APRIL 27, 2023 DESIRED TEST: PHYSICAL TEST SAMPLE ID NOT STATED SPECIFICATION : AS PER RESULT QUANTITY REPD. : NOT STATED MECHANICAL PROPERTIES. Diameter x same (0. ‘Actual x-sectional Area rE rom? 1 32.00 rea27 2 32.00 raat % TENSION TEST _ TEST RESULT [SPECIFICATION ELONGATION Yield Point [Tensile Strength| Yield Point [Tensile Strongth ELONGATION % Mpa Mpa: Mpa Mpa % 8 54207 555.09, - : a7 S901 567.56 : 7 NOTE : Samplos Testod as submitted to NPRECISION®. ‘This Laboratory Responsible For Test Only Checks By: Test Witnessed By: ef RARIREZ ‘Seqfér Laboratory Technician KARIL FAJBEAGANA / NPC Alte fs oe ELISA E. YUYDA MARY GRAGE MIJARES / Labordtof Head DELTA CONST. & MARINE SERVICES. (Not vad without NPRECISION® Dry Seat) \VRIGIETTEUANE N- ESCORPIZO NPRECISION® MATERIALS ENGINEER ‘ACRED #5567 a DATE RELEASED UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bactas, Basud, Camarines Norte Mobile No. (+63) 969-155-9927 Email: utlicamnorte@gmail.com * th < LAB NO.: TR-0423-0076-2 DATE: April 17, 2023 CONCRETE STRENGTH TEST REPORT (asTM c-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Fi ities under Package 3 LOCATION: Brgy Banocboe, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Conerete Cylinder 6” x 12” SAMPLED BY: Delta Construction and Marine Services SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 17, 2023, DATE TESTED: April 17, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength | Mark | Molded | Station Represented | Days | Fracture[ MPa | psi 1 | 04/04/2023 13 2 319 | 4630 Containment Wall 2 | 04/04/2023 13 rR 28.0 | 4060 ‘Type of Fracture: Tweet Tyee? Wes pee Tees Wore Remarks: This report is the result of the test performed on the specimen submitted. ed Furagganan “Delta Construction and Marine Services Tested by: lan Tri lal - Alem \ician Witnessed by: op Jerson(Mastuera Senior Engineer, NPC Certified by: /Loyié T-Sabado ‘Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok3 Barangay Bactas, Basu Camarines Norte econ ’ a Email: utliicamnorte@ gmail.com Cnr ne LAB NO.: TR-0423-0076-3 DATE: April 17, 2023 = ‘CONCRETE STRENGTH TEST REPORT (astm C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Conerete Cylinder 6” x 12” SAMPLED BY: Delta Construction and Marine Services SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 17, 2023, DATE TESTED: April 17, 2023 ‘Sample | Date Part of Structure or | Age in | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture| MPa | psi Containment Wall 1 04/10/2023 " 7 TS 20.2 2930 Footing T Type of Fracture: wees Tee? Twes Twa Tees Tes Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: a i Furagganan Jersor istuera Delta Construction and Marine Services Senior Engineer, NPC Tested by: Certified by: lan THs€&iy B. Alem. if C. Sabado Lak Teghnician Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. cis alates md cto , en aise ae Email: utliicamnorte@gmail.com ae sccm LAB NO.: TR-0523-0100-1, DATE: May 8, 2023, CONCRETE STRENGTH TEST REPORT (asTM c-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP ‘and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan ‘SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark Molded Station Represented Days |Fracture| MPa | psi 1 | 04/04/2023} Containment Wall 34 1S 346 | 5020 Type of Fracture: [| Tee Tyee? Teed Wpee Trees Thee Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: heitat ford Furagganan ez L. Ricacho Delta Construction and Marine Services Plant Head Calaguas DPP Tested by: Certified by: fan a 2h 8. Alem Latie C. Sabado nician Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Hadras cpa eminent ' me esecess a Email: utliicamnorte@gmail.com api ‘tm Cmte LAB NO.: TR-0523-0100-2 DATE: May 8, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Bray Banocboe, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture | MPa | psi 1 | 04/10/2023 Footing 28 2 | 379 | 5500 ‘Type of Fracture: Tyee "woe? Tes Tee Toes Tee Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: ford Furagganan fe LL Ricacho Delta Construction and Marine Services Plant Head Calaguas DPP Tested by: Certified by: ‘Loufe C. Sabado Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bactas, Basud, Camarines Norte " Mobile No. (+63) 969-155-9927 Email: utlicamnorte@gmail.com e& LAB NO.: TR-0523-0100-3, DATE: May 8, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | StationRepresented | Days | Fracture| MPa | psi ai 04/16/2023 Containment Wall 22 12 33.2 | 4810 Type of Fracture: Kl KY TT Tweet Toe? Tw} Woe Tees Tee Remarks: This report is the result of the test performed on the specimen submitted, = Witnessed by: i — fifford Furagganan fethegél L. Ricacho Delta Construction and Marine Services Plant Head Calaguas DPP Tested by: Certified by: lan |. Alem ie Sabado lal cian Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bactas, Basud, Camarines Norte Mobile No. (+63) 969-155-9927 Email: utliicamnorte@gmail.com LAB NO.: TR-0523-0100-4 lay 8, 2023, Dal CONCRETE STRENGTH TEST REPORT (ast C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Incl LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan ‘SPECIFICATION: 3000 psi @ 28 days ing Construction of Associated Facilities under Package 3 DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture| MPa | psi 1 04/24/2023 Tank Foundation 14 T2 15.5 | 2250 Type of Fracture: | IN Tee Tee Teed Tyee Toes es Remarks: This report is the result of the test performed on the specimen submitted. A— ford Furagganan Delta Construction and Marine Services Tested by: Witnessed by: Plant Head Calaguas DPP Certified by: : ol © Sabado Technical M: lanager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. FEF Gg incur Carre , pohgemenyterey a Email: utliicamnorte@gmail.com soem iada _ ‘on met at LAB NO.: TR-0523-0100-5 DATE: May 8, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP_ and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Bray Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | StationRepresented | Days | Fracture| mPa | psi 1 | 04/27/2023 | Drainage Appurtenances | 11 | 12 | 223 | 3230 | Type of Fracture: [ | Type Type 2 “wes Types wes Wee Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: tiem hin ford Furagganan athe L. Ricacho Delta Construction and Marine Services Plant Head Calaguas DPP Tested by: Certified by: p H MN lan, B. Alem Louie C. Sabado ab Technician = Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bactas, Basud, Camarines Norte Mobile No. (+63) 969-155-9927 Email: utlcamnorte@gmail.com CUSTOMER: Delta Construction and Marine Services * ay = LAB NO.: TR-0423-0086-2 DATE: April 28, 2023 CONCRETE STRENGTH TEST REPORT PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 28, 2023 DATE TESTED: April 28, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture} MPa | psi 1 04/04/2023 24 & 33.4 4840 2 | 04/04/2023 | Containment Wall 24 12 | 28.3 | 4100 3 | 04/16/2023 2 T2 | 261 | 3780 ‘Type of Fracture: J Troe Weed pee Trees ‘were Remarks: This report is the result of the test performed on the specimen submitted. Furagganan Delta Construction and Marine Services Tested by: che Jersor(M) Castuera ‘Senior Engineer, NPC Certified by: F fice samt Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bactas, Basud, Camarines Norte i Mobile No. (+63) 969-155-9927 i & Email tlicamnorte@gmail, i hese LAB NO.: TR-0423-0086-1 DATE: April 28, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 28, 2023 DATE TESTED: April 28, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | StationRepresented | Days | Fracture| mPa | psi 1 04/01/2023 27 ay 28.2 4090 Containment Wall Footing 2 04/10/2023 18 T2 30.3 4390 Type of Fracture: Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: a of ford Faragganan sersop th castuera Delta Construction and Marine Services Senior jineer, NPC Certified by: Loyle C. Sabado Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bactas, Basud, Camarines Norte a Mobile No.: (+63) 968-155-9927 Email: utlicamnorte@gmail.com LAB NO.: TR-0423-0076-1 Dal CONCRETE STRENGTH TEST REPORT (asTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Inclu LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Delta Construction and Marine Services SUBMITTED BY: Clifford M. Furagganan ‘SPECIFICATION: 3000 psi @ 28 days 1g Construction of Associated Facilities under Package 3 : April 17, 2023, DATE SUBMITTED: April 17, 2023 DATE TESTED: April 17, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture| mPa | psi 1 | 04/01/2023 16 12 | 234 | 3390 Containment Wall 2 04/01/2023 16 TS 14.0 2030 ‘Type of Fracture: ( ] Remarks: This report is the result of the test performed on the specimen submitted. ‘Furagganan Delta Construction and Marine Services Tested by: Witnessed by: ob Jerso(M) Castuera Senior Engineer, NPC Certified by: - Sabado Technical Manager opeteites-5 ofa sdeuea-2 ipersony wary uohia-ya — seepin-n sun -0 west MOTO] BOMON see THAN LNSINNIVINOD, 5 z 700) 2/91/00 TVA LNSINNIVANOD, TIAN LNSINNIVINOD, T 8/04 53801 “noes Viva Isai NaWD3d5 WAGNITO| Toe re | oeoe [60 | osee | soeer_| est | voe | come eeperys0_P TTurro) do saw —SivOT O 16s 0008 sposmnboy yituons onsvesdwo> Bi dina wey EZ/2T/S0 _1Penerey e28C] ‘paypads ION quip paypeds IN wedks ween PeuP EGS ION ana as ‘UeUesBesns W POND TAGE) Paueds von —s(seNPUI) o7Is BBY XEN aumeGS ION Taaidang eyeuey vava 1s31 a1 VLVO XIN ONY STVINBLW a pawans Tmieg wode Buon soueuey oroo-zrs0er-ovNNN €SDWIDVd WONT SSUNOVS GRLVDOSSY 3 YON uodow'aeT dda SYNDVIVD GNY ddd S3NVEINNIVd UOS SHNVL 3DVUOUS TANS TH SE XZ JO ASL ONY NOLLVTIVISNI ‘AUBANQ ‘ATadNS 229/014 YViWG NOLLWHUN3G! ‘SLINSIW 1531 HLONIULS AISSTUAWOD 313¥INOD ‘SR aauNGD ONILSGL WH @ UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bactas, Basud, Camarines Norte Mobile No. (+63) 969-155-9827 Ge Email: uicamnorte@gmailcom ery LAB NO.: TR-0423-0076-2 DATE: April 17, 2023 CONCRETE STRENGTH TEST REPORT (ast c-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brey Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Delta Construction and Marine Services SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 17, 2023 DATE TESTED: April 17, 2023 Sample Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture; MPa | psi 1 | 04/04/2023 13 2 31.9 | 4630 Containment Wall - 2 | 04/04/2023 13 12 28.0 | 4060 Type of Fracture: f Liu L Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: Delta Construction and Marine Services Senior Engineer, NPC Tested by: Certified by: loge C Sebado Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. rok 3 Barangay Bactas, Basud, Camarines Norte q Mobile Nos (+68) 969-155-8927 a Email uticamnorte@gmail.com sec mec! LAB NO.: TR-0423-0076-3, DATE: April 17, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Delta Construction and Marine Services SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 17, 2023 DATE TESTED: April 17, 2023 Sample Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture| MPa | psi Bafiopao2: Containment Wall | 5 202 2 1 1/10/2023 Footing z a é aid ‘Type of Fracture: { Tweet Tee we? Tee Tyee tee Remarks: This report is the result of the test performed on the specimen submitted. > Witnessed by: ade Jerson. Bastuera Delta Construction and Marine Services Senior Engirfeer, NPC Tested by: Certified by: tan Tash B. Alem ‘ale €.Sabado LakgTethnician Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Sets tetas ake ioe , sae ae el come a a me eee LAB NO.: TR-0523-0100-1 DATE: May 8, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture| MPa | psi 1 | 04/04/2023} Containment Wall 34 1s | 346 | 5020 Type of Fracture: Toe "woe? wees Tee Tyee Tee Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: rd Furagganan jethgZ€l L. Ricacho Delta Construction and Marine Services Plant Head Calaguas DPP Tested by: Certified by: hole C. Sabado _ Technical Manager fan UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. arok 9 analy bases bond Canon , Table Nos (06) ISSN ie aly G nal iene toe LAB NO.: TR-0523-0100-2 DATE: May 8, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP ‘and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 ‘Sample Date —_—_—Part of Structure or Agein | Type of | Ultimate Strength Mark | Molded | StationRepresented | Days | Fracture) MPa | psi 1 | 04/10/2023 Footing 28 T2 37.9 | 5500 ‘Type of Fracture: f Tyee Twos? Te? pee Tees twee Remarks: This report is the result of the test performed on the specimen submitted. cai af Witnessed by: Delta Construction and Marine Services Plant Head Calaguas DPP_ Tested by: Certified by: lan Tri . Alem ‘Louie Cc. Ss {hnician ~ Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bactas, Basud, Camarines Norte L Mobile No. (+63) 969-155-9927 Email: utlicamnorte@gmail.com LAB NO.: TR-0523-0100-3, DATE: May 8, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Conerete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture| MPa | psi 1 | 04/16/2023) Containment Wall 2 12 | 332 | 4810 Type of Fracture: XI | pat Tee Tee? Tes Tee Trees Wee Remarks: This report is the result of the test performed on the specimen submitted, Witnessed by: x Clifford Furagganan fethez@f. Ricacho Delta Construction and Marine Services Plant Head Calaguas DPP Tested by: Certified by: Nr ten, Jan Poeefn B. Alem Lotie C. Sabado ey hnician Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Fans ety eas ed ctl ; LS Nat apse ee cnet atmneistomeades _ ee LAB NO.: TR-0523-0100-4 DATE: May 8, 2023, ‘CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Inch Construction of Associated Facilities under Package 3 LOCATION: Brey Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan ‘SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 Sample Date Part of Structure or | Age in | Type of | Ultimate Strength Mark | Molded Station Represented Days | Fracture | MPa psi 1 | 04/24/2023 Tank Foundation 14 2 15.5 | 2250 Type of Fracture: eet we? Twe3 Type Ties wee Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: Delta Construction and Marine Services Plant Head Calaguas DPP ‘Tested by: Certified by: Jan B. Alem cb C. Sabado inician ‘Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok3 Barangay Bactas, Basu, Camarines Note \, Mobile Nov (8) 9185 9527 é a Email: thzamnorteOpmai.com nantes prathlbes “stntmemmar LAB NO.: TR-0523-0100-5 DATE: May 8, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2x 35 KL Fuel Storage Tanks for Palumbanes DPP ‘and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Conerete Cylinder 6” x 12” ‘SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: May 8, 2023 DATE TESTED: May 8, 2023 ‘Samp Date Part of Structure or | Age in | Type of | Ultimate Strength Mark | Molded | stationRepresented | Days | Fracture| mPa | psi 1 | 04/27/2023 | Drainage Appurtenances | 11, m2 | 223 | 3230 a Type of Fracture: | NI Tee Tee? Te) Tes Tees Tee Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: ag aa Aan. eiifford Furagganan tKezfAl. Ricacho Delta Construction and Marine Services Plant Head Calaguas DPP Tested by: Certified by: lan - Alem ft ie C. Sabado LabZecHlician Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok 3 Barangay Bactas, Basud, Camarines Norte Lb Mobile No. (+63) 969-155-9927 Email: utliicamnorte@gmailicom DATE: April 28, 2023 CONCRETE STRENGTH TEST REPORT {ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Faci LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Conerete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan ‘SPECIFICATION: 3000 psi @ 28 days ss under Package 3 DATE SUBMITTED: April 28, 2023 DATE TESTED: April 28, 2023 sample | Date Part of Structure or | Age in | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture| MPa | psi 1 04/04/2023 24 Ss 33.4 4840 z 04/04/2023 Containment Wall 24 12 28.3 4100 3 | 04/16/2023 2 12 | 261 | 3780 Type of Fracture: vu Toei Tyee Tas ee Tes Tee Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: Zam ifford Furagganan Delta Construction and Marine Services Jerson{ Senior EAgineer, NPC Tested by: Certified by: ie C. Sabado Technical Manager oe sstuera UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. Purok Barangay Bactas, Basu, Camarines Nore ; , Mobile Nos (8) 98-138 927 ‘ eG Email utlcemnore-pmailcom memetinns arbi ‘reninemcter LAB NO.: TR-0423-0086-1 DATE: April 28, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) ‘CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated F: 's under Package 3 LOCATION: Brgy Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Clifford M. Furagganan SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 28, 2023 DATE TESTED: April 28, 2023 Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | StationRepresented | Days | Fracture| MPa | psi 1 04/01/2023 7 15 28.2 4090 Containment Wall Footir 2 | 04/10/2023 18 rR 30.3 | 4390 Type of Fracture: Nt Tvoe we? oes Tipe ‘woes Wee Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: oy lifoFForagganan Jerson, Fastuera Delta Construction and Marine Services Senior Engineer, NPC Tested by: Certified by: tan TpRE&A B. Alem ‘odie C. Sabado jician Technical Manager UNIVERSAL TESTING LABORATORY AND INSPECTION, INC. TUGh arse Brn ler Ni , mele Ner cepa i a Email: utliicamnorte@gmail.com nmi ‘Iaslenteconet LAB NO.: TR-0423-0076-1 DATE: April 17, 2023 CONCRETE STRENGTH TEST REPORT (ASTM C-39) CUSTOMER: Delta Construction and Marine Services PROJECT: Supply, Delivery, Installation and Test of 2 x 35 KL Fuel Storage Tanks for Palumbanes DPP and Calaguas DPP Including Construction of Associated Facilities under Package 3 LOCATION: Brey Banocboc, Calaguas, Vinzons, Camarines Norte KIND OF MATERIALS: Concrete Cylinder 6” x 12” SAMPLED BY: Delta Construction and Marine Services SUBMITTED BY: Clifford M. Furagganan SPECIFICATION: 3000 psi @ 28 days DATE SUBMITTED: April 17, 2023, DATE TESTED: April 17, 2023, Sample | Date Part of Structure or | Agein | Type of | Ultimate Strength Mark | Molded | Station Represented | Days | Fracture| MPa | psi 1 | o4/o1/2023 16 m2 | 234 | 3390 Containment Wall Footing 2 | 04/01/2023 16 1 | 140 | 2030 ‘Type of Fracture: ? { Te Te Tees ee wes ee Remarks: This report is the result of the test performed on the specimen submitted. Witnessed by: a \v ‘Gragganal Jerson (a. Dpstuera Delta Construction and Marine Services Senior Egiheer, NPC Tested by: Certified by: lan TriGedf B. Alem td ie C. Sabado Lat Teghnician Technical Manager

You might also like