GRIT FINISH

PLANTING BED PLANTING BED PLANTING BED


LVL +101.15 LVL +101.15 LVL +101.15
PLANTING BED
LVL +101.15
3 bands of 100x 100 kota cobble
450 mm band of kota polished with bands of kota polish on either side
RAMP DN
+101.05 GRIT FINISH GRIT FINISH GRIT FINISH +101.05 GRIT FINISH GRIT FINISH GRIT FINISH +101.05 GRIT FINISH GRIT FINISH
+101.05 +101.05 SLOPE 1:10
450 mm band of kota polished GRIT FINISH 450 mm band of kota polished
GRIT FINISH
450 mm band of kota polished
450 mm band of kota polished
GRIT FINISH
PLANTING BED
GRIT FINISH
LVL +100.95
MOUND
AS/DETAILS
+100.85
+101.05 band are coordinated +101.05 +101.05 +101.05
with the center of PLANTING BED
GRIT FINISH columns PLANTING BED LVL +101.15
LVL +101.15
RAMP ENTRY TO PAVED AREA
RAMP EXIT FROM BASEMENT LVL +101.20
PAVING
BASEMENT AS/DETAILS PAVING
AS/DETAILS
SLOPE 1:10
RAMP UP GRIT FINISH
W1 W1
RAMP ENTRY TO W1 W1 RS1 RS1 FMD1

+101.25

GD

GD
BASEMENT 37
39
37
39 TR-1
FOR PARKING 35
41
35
41
TR-2
L4 L6 L5
33 33
43 43

TPCO

TPCO
31 31
59 45 59 45
+100.50

LOBBY
SG3 SG3 SG3 SG3 SG3 SG3
57 47 57 47

D1

D1
55 49 55 49 FMD FMD
53 51 DN 53 51 DN

TOILET (G)

UP
UP

TOILET (L)
UP UP
52 52

D2

D2
FMD2 FMD2 FMD2
concrete blocks

D2
FMD2

D2
in ramp concrete blocks

STORE

STORE
in ramp
RS1
LOOSE
FURNITURE
concrete blocks FMD2 FMD2 ROLLING SHUTTER
2400 mm WIDE WITH FMD2
in ramp FMD1 FMD1
30% LOUVERS FMD

FMD1 FMD2
FMD1

UP
D

+101.20 101.5MM LVL 53 55 57 34 36


OFFICE
2600 X 2400
GRIT FINISH
38
PAVED AREA
52 50 48 46 44 42 40
+100.85

UP

UP
TRAINING BLOCK
FMD1 NORTHERN STAIRCASE 01 TOILET TO DETAIL
LVL +101.20

DN
TO DETAIL 2700 X 1500 D1

+100.50 PAVED AREA

+900
101.4 mm LVL ECO 1 L1 L2 L1 ACCO LVL +101.00

+900
RAMP UP
101.5 mm LVL
G+2
SLOPE 1:10
IT BLOCK 450 mm band of kota polished

DOUBLE HT
LOBBY
AUDITORIUM

DOUBLE HT
LOBBY
AUDITORIUM
PLANTING BED

G+5 LVL +101.15

FMD1 FMD1
W1
SIGNAGE WALL W1

LLPCO GRIT FINISH


37 37

D
D
39 39

CP1
35 35
41 LIFT LIFT 41

TOILET (G)

TOILET (G)
33 2700 X 2400 2700 X 2400 33
43 22 PER 22 PER 43

HT
31 LIFT LOBBY D5 31

AREA
COFFEE
59 45 FMD3 59 45

TVCO

TVCO
STAGE
FMD3
57 47 57 47

TWO ENDS OF THE SHAFT

1200 X750 SHAFT FOOTPRINT

TWO ENDS OF THE SHAFT

1200 X750 SHAFT FOOTPRINT


2 Nos. 200 Ø SLEEVE AT

2 Nos. 200 Ø SLEEVE AT


D2
D5

D2
55 49 55 49
LIFT
53 51 LIFT 53 51 DN
2700 X 2400
UP DN 2700 X 2400 22 PER
UP
52 22 PER 52
TPCO TPCO

D3

D3
FMD2 FMD2

D2

D2
FMD1 FMD2 FMD1
FMD2

TOILET (L)

2275x2050

SERVICE
LIFT
TVCO

TVCO
UP

TOILET (L)
+101.50 GD1 GD1
STEPS UP
+101.25

HT
RISER=150
TREAD=300

3180 x 5400
BELOW

BELOW
ECO

MD1
SEEN

SEEN
ACCO 2
TVCO 2

AHU
TVCO 1
MD1 MD1
TPCO

CP2
STEPS UP GCO
ALIGN FACES
RISER=150 GRIT FINISH

M.V.PANEL ROOM
TREAD=300

UP

UP
SG-1 TOILET (M)

TECH TRAINING 40 P
D3

8500 x 11050
W2 W2 EXIT D3
HT

RS

8500 x 11050
FMD3 D2
D2
100 x 100 x 40mm D4 TOILET (L)

MD1

MD1
TOILET (L)

MD2

D2
3450 x 8000

3450 x 8000
D2
D1 D2 TOILET (M)

ACCO 1

ACCO 1
kota cobble stone

AHU

AHU
D2 D2
FMD3 101.5 mm LVL J.C SPCO

+900
RS
D2 D2
FMD2
MD1 MD1

CP3
SG-2 HAND WASH UP
+100.85

D2

D2
D2 D2 D3 1
D3
UP

W1

W1
3
FHR-6 5

COURT YARD
ACCO

W2

W2
COURT YARD

TRAINING 30 P
SOFT SKILL
W

W
7550 x 9000
3000MM
SG2

3000MM
SG2 SG2 SG1 SG1 SG2 SG2 SG2

COURT YARD
COURT YARD
3000MM
A.H.U RM

MEETING RM - 10P
MD3

MEETING RM - 10P MEETING RM - 10P


3450 x 5400

3450 x 5400
PLATE
DISPOSAL
AND DISHWASH

W ID E
SG-3

TRAINING STAFF
15200 x 9000

W ID E
W1

W1
TPCO D2 ECO

D2
PLANTING BED

D2

D2
W ID E
TO DETAIL
TVCO / BVCO SHAFT A TVCO / SUPPLY SHAFT B TPCO

+900
GD-1
TO DETAIL
SPG/GD1 SPG/GD1
LVL +101.15 TO DETAIL TO DETAIL GD-1 GRIT FINISH

C O R R I D O R
MEETING RM - 10P

C O R R I D O R
D2

D2
D2
3450 x 5400

3450 x 5400
C O R R I D O R

W1

W1
PREP. PLANTING BED
FOOD PLANTING BED

COURT YARD
CANTEEN
STEPS UP ROOM
RISER=150 COUNTER D2
MD2
LVL +100.95

TRAINING 30 P
LVL +100.95

SOFT SKILL
TREAD=300

7550 x 9000
PATHWAY
450 mm band of kota polished
BLOCK

1500 MM WIDE CORRIDOR


450 mm band of kota polished LVL101.50 MM

2550 MM WIDE CORRIDOR


D2

W
MAIN ENTRY

CP4
101.20 mm LVL FOOD

W2

W2

W2

W2
+101.05
GRANITE G+2 COUNTER PREP.
ROOM GAS BANK

W1

W1
D2

D2
SG-4 D2 TO DETAIL

PLANTING BED RWCO1

+101.20

FHR

FHR
D2

13 PERSON

13 PERSON
2225 X 2025

2225 X 2025

TECH TRAINING 40 P
LVL +101.15

TECH TRAINING 40 P

BMSCO

BMSCO
LIFT

LIFT
8500 x 11050

8500 x 11050
1200 X750 SHAFT FOOTPRINT

TWO ENDS OF THE SHAFT

TWO ENDS OF THE SHAFT

1200 X750 SHAFT FOOTPRINT


2 Nos. 200 Ø SLEEVE AT

2 Nos. 200 Ø SLEEVE AT


D2
FOOD
COUNTER

D2

D2
D2 PREP.
ROOM OFFICE

26 NOS. RISER
RISER = 155.67
TREAD = 300
WIDTH = 1800
STAIRCASE UP
LPCO 4
GRIT FINISH

D1
D1
D2

3200 x 3900

3200 x 3900
PLANTING BED LIFT

AHU

AHU
GD1
2500 x2100
+101.05

ACCO

ACCO
101.5 mm LVL
LVL +101.15 PAVED AREA STEPS UP 2980
15PER

GRIT FINISH

D2

D2
3200 x 4140

3200 x 4140
RISER=150

2500
LVL +101.20 TREAD=300
ATRIUM RS
450 mm band of kota polished

AHU

AHU
ABOVE

AREA
COFFEE
450 mm band of kota polished

AREA
COFFEE
CENTER OF ARC
UP

D1
D1
01 LIFT
FIRE ESCAPE GD1 05
03 2500 x2100
15PER
STAIRCASE MUMTY D2 FHR-5

LPCO 4 SERVICE
LIFT

D2

D2
2500 X 2100

DESCRIPTION

GD4

GD4
DUMB 15PER
WAITER
1200 x 800

GD4
GRIT FINISH

GD4

GD1

GD1
LPCO 5

TECH TRAINING 80 P

DOUBLE HT
RECEPTION
+101.05
GRANITE

TECH TRAINING 80 P
CUT OUT
1500 MM WIDE CORRIDOR
MAIN ENTRY SG-4

CUT OUT
PATHWAY
101.50 mm LVL LVL101.50 MM
200MM THK.SOLID CONCRETE
STEPS UP BLOCK WORK WALL WITH 2HRS STORE ROOM
RISER=150 FIRE RATING PLASTERED ON
TREAD=300 GYM BOTH SIDES

RWCO2 450 mm band of kota polished

SG4 AAAA
SG4

GD1
SPG/GD1 SPG/GD1

GD1
PLANTING BED SG3 SG2 SG1 SG1 SG2 AAAASG3

LVL +101.15 D3 D3 AAA


D3 D3
AAA
VISITORS PARKING

D3 D3 AAA
D3 AAA
D3
AAAA
SG-3

UP
TPCO
TPCO
D3 D3 AAA
D3 AAA
D3
300MM WIDE BEAM
AS PER STRUC.DET A.H.U RM
D3 D3
AAA MD3

D3 AAA
D3
+101.20 900Ø COLUMN (TYP)

PLANTING BED
ACCO
D3
D3 D2 AAAA
D2
AAA
D3
RAMP UP
FHR- 6 5
3
LVL +100.95
RAMP UP AAAA
D3
D2 D2
AAAA 1
SG-2
LOCKERS TO BE UP
AAAA
MD3
DETAILED
D2 D2
J.C. 101.5 mm LVL MD1 MD1
H.T.
MD3
SPCO
J.C. J.C. LPCO-3

+101.20 D4
GRIT FINISH
GD2 1960 x2900
D2
GD2
EXIT
D3
D3 UG SUMP
LOCKER STEPS UP TPCO
STEPS UP RISER=150 TPCO
RISER=150 TREAD=300
SG-1

ALIGN FACES
PAVED AREA
TREAD=300
LVL +101.00 +100.85
TVCO 1 TVCO 2
GD2
GD2

PLANTING BED PLANTING BED


GD4 GD4

MD2
FHR-2
MD3 MD3
FHR-2
MD2
LVL +101.15 LVL +101.15
MD2 MD2
MD2 MD2 EXIT
EXIT DN DN UP DN UP DN
51 53 51 53

ACCO ACCO

BPO BLOCK
49 55 49 55
47 57 47 57
45 59 45 59

G+5
31 31
MD2 MD2
PLANTING BED
43 43
41
33
LIFT LIFT LIFT 33
CUTOUT CUTOUT LIFT
41
35 CUTOUT LIFT LIFT
2700 X 2400 2700 X 2400 CUTOUT
35
39
37
2700 X 2400
22 PER 22 PER 22 PER
CUTOUT
2700 X 2400 2700 X 2400
CUTOUT
2700 X 2400
39
37 LVL +100.95
UP
LPCO-2

BPO STAIRCASE-03
BPO STAIRCASE-02
TO DETAIL MAIN ENTRY
TO DETAIL TO HOSTEL BLOCK HANDRAIL TO DETAIL
BALCONY
BALCONY BALCONY

ECO 1 ACCO
100.8 M LVL 100.8 M LVL
MD1

MD1 101.4 mm LVL


MD1
UP TOILET TO DETAIL
2600 X 1500
D1 jindals13@ gmail.com, 15

13
11
CUTOUT
2100 X 2500
LIFT LAUNDRY
BEDROOM

ON BOTH SIDES
FIRE RATING PLASTERED
BEDROOM BEDROOM

ON BOTH SIDES
FIRE RATING PLASTERED
15

13
11
MD1 FMD1 1 3 5
101.5 mm LVL 9
101.4 M LVL BLOCKWORK WITH 2 HRS
100 MM THK AUTOCLAVED
BLOCKWORK WITH 2 HRS
200 MM THK AUTOCLAVED 9
1 LOBBY 1
7 7
OFFICE 3 CUTOUT 3
2700 X 2400 5 DN 5 DN
RAMP DN D
UP 2100 X 2500 UP
1500

MD2

G+7
1800

MD2 MD2 3900


MD2 FMD2 LIFT 101.4 M LVL
TOILET TOILET
SLOPE 1:10 DN
52
UP DN
52
UP
TOILET

concrete blocks 101.4 M LVL


51 53 51 53
49 55 49 55 30% LOUVERS FMD FHR
ACCO
LPCO GRIT FINISH
GRIT FINISH RS1
3000 mm WIDE WITH
ROLLING SHUTTER
FMD2
in ramp 9100 X 12050
MESS

UNDER GROUND
47 57 47 57
PLANTING BED
HOSTEL BLOCK +100.85
101. 5 MM LVL
4200

45 59 45 59
31 31
2 4 0 0 mm W I D E C O R R I D O R
43
41
33
43
41
33
DEISEL TANK LVL +100.95
35 35
39 39

BMCO
10000X17000
S. BOSE
37 37 ECO
SG8 SG7 SG6 SG5 SG5 SG6 SG7 SG8 FMD
1800

1500

TOILET TOILET TOILET TOILET


FMD ECO 2 4450 X 3100
HAND WASH

W1 W1
101.4 M LVL 9100 X 6330
READING & RECREATION PLANTING BED

concrete blocks TR-1 TR-2 L4 L6


L5
21 D CONNAUGHT PLACE, NEW DELHI 4500 X 2850
PANTRY
SERVICE COUNTER
STORAGE
4450 X 6150
BEDROOM 4450 X 6150
BEDROOM
4450 X 6150
BEDROOM
4450 X 6150
BEDROOM
3900x5200
ELECTRICAL
LVL +100.95
in ramp
STEPS UP
RISER=150
TREAD=300
FMD1
23418560, 23418679. 450 mm band of kota polished
RS1 RS1

PLANTING BED
PLANTING BED
PAVED AREA LVL +101.15
PLANTING BED E 47, PANCHSHILA PARK, NEW DELHI.
LVL +101.15 LVL +101.15
LVL +101.20 HOSTEL MESS
450 mm band of kota polished
LOOSE
FURNITURE
SERVICE ENTRY
+100.50
450 mm band of kota polished
+101.05
PLANTING BED PLANTING BED
GRIT FINISH LVL +101.15
+100.85 GRIT FINISH GRIT FINISH LVL +101.15
GRIT FINISH GRIT FINISH GRIT FINISH GRIT FINISH GRIT FINISH
RAMP UP
+101.05
SLOPE 1:10 +101.05 +101.05

GRIT FINISH
450 mm band of kota polished

GRIT FINISH
LANDSCAPE PLAN RAMP DN
+100.85 GRIT FINISH

GRIT FINISH GRIT FINISH GRIT FINISH +101.05 SLOPE 1:10 GRIT FINISH

PLANTING BED PLANTING BED PLANTING BED PLANTING BED


LVL +100.95 LVL +101.15 LVL +101.15 LVL +101.15