You are on page 1of 1

MEMORANDUM

To: Mr. Robert Streatch Date: January 5, 2023

From: Andrew Steven G. Mallari Cc: Mr. Chris Chapman

Subject: TR1 – The Problem Statement, Project No. COMM1022.2022.23.01

Dear Mr. Streatch,

Our group aims to demonstrate to Collaborative Developments the building commissioning process that
includes the building envelope commissioning. This is to ensure the energy efficiency objects that must
follow the industry's best practices and be acceptable to the green building certification program. The
problems are reducing operational costs and ensuring the design intent is implemented during
construction based on process selection and economics. The methods and the processes involved in
construction must consider the location of the proposed building, which is in Moncton, New Brunswick,
Atlantic, Canada.

Andrew Steven G. Mallari


Mallari A Construction Ltd

Phone: +1 (506) 850-4139 www.maconstructionltd.com Page | 1

You might also like