TABLE OF CONTENTS
L.B.S. LABORATORY L.P.
Installation Qualification
PAGE
1.0 OVERVIEW..................................................................................................................................3
2.0 SCOPE..........................................................................................................................................3
5.0 RESPONSIBILITIES....................................................................................................................4
7.0 DEFINITIONS..............................................................................................................................5
Installation Qualification
13.0 ABBREVIATIONS......................................................................................................................32
14.0 ATTACHMENTS.........................................................................................................................32
L.B.S. LABORATORY L.P.
Installation Qualification
1.0 OVERVIEW
Introduction
AquaKlenz ampoule washer will wash ampoules of 1-2 ml size in a Class D environment and under
Laminar flow hood (class A) to provide essentially clean and particles free ampoules to be
transferred into the sterilizing and depyrogenating tunnel.
Objective
To verify that the AquaKlenz has been assembled in accordance with the Design Qualification
documents and in accordance with Good Manufacturing Practices (GMP).
2.0 SCOPE
This procedure is applicable to the AquaKlenz rotary ampoule wash installed at the sterile
production floor at LBS Laboratory K7.
Following personnel are involved in the completion of this project with defined responsibilities as
follows :
Installation Qualification
5.0 RESPONSIBILITIES
Responsibilities of personnel involved in different activities related to the installation qualification
of the Pure Steam Generator are defined below:
Installation Qualification
7.0 DEFINITIONS
1.1 Critical component : Component within a system where the operation, contact, data, control,
alarm, or failure may have a direct impact on the manufacturing parameters which in turn affect
the product quality.
1.2 Non-critical components : Component within a system where the operation, contact, data,
control, alarm, or failure will have an indirect impact, or no impact, on the manufacturing
parameters which in turn affect the quality of the product.
1.3 Deviation : Any event (planned or unplanned) that has the potential to adversely impact product
quality. Deviation may or may not have the potential to impact operations and operational costs.
L.B.S. LABORATORY L.P.
Installation Qualification
1.4 Variance : Any event (planned or unplanned) that has the potential to impact operations and
operation cost and no impact on product quality.
Objective : To verify that the documentation provides complete and corrected technical
references and permits servicing of the units
Procedure :
Verify that the required documents and drawings listed in the tables below are available.
Review the documents and drawings for completeness and exactness with the installed unit.
Sign and date all copies of the drawings, once verification is completed.
Attach the copies of the drawings to this protocol or reference the location from where they
can be easily retrieved.
Any items in the installation, which are not conforming to the corresponding drawings, must
be commented on in the appropriate space. List the non-conformances and the reasons for
them in an attachment are needed.
Acceptance Criteria :
All documents are present.
The documents must be accurate and complete.
The drawing information must correspond to the physical installation
L.B.S. LABORATORY L.P.
Installation Qualification
Drawing Verification
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Objective :
To ensure that all parts of the Ampoule Washer are present, identified and not damaged.
Procedure :
Confirm that identification name plates have been applied to the units and indicate the type,
tag no. manufacturer, Model No.
Confirm that various components of ampoule washer are presented as per drawings, in the
proper numbers and configuration.
Visually examine the ampoule washer for defects.
Acceptance criteria :
Each item listed in the following table is present and documented. There is no visible defects
on the Ampoule Washers.
Installation Qualification
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Objective :To ensure that actual material of construction and finishes of ampoules washer
match those specified by Design qualification.
Procedure : Determine the specified MOC and finished of the Ampoule Washer from the notes
on the assembly drawing or the Material Verification Certificate found in the final documents
file. Record in the table provided below.
Acceptance criteria : the MOC matches the DQ or URS specification
Installation Qualification
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Objective :
To ensure that the electrical components installed on the Ampoule Washer match the
descriptions of those specified on the DQ documents.
Test equipment : multi meter
Procedure : Compare the description of all specified electrical components and instruments
( i.e. motor starter, inverter, drive etc) found on the DQ documents with actual electrical
components installed on the machine.
Acceptance Criteria :
The electrical components specified match those installed
Description Verified
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Objective :
To verify the location of installation as per the equipment layout with respect to room, found in
DQ document
Procedure :
Check that equipment is installed in the room specified in the Ampoule Washer general
arrangement layout and room layout drawings.
Check the assembly of other components as per General Arrangement drawing
Acceptance criteria :
Location of installation is verified
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Procedure: Confirm that all critical instruments are calibrated with traceability. Attach copies
of calibration certificates to this protocol. Record the results in the table below:
Acceptance criteria :
All critical instrumentations for the ampoule washer shall be in a state of calibration.
Sr Calibration
Item Frequency of calibration
No.
Yes No.
1 Pressure gauges
2 Pressure transmitters
3 Temperature sensors
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Procedure: Confirm that all ampoule washer is ready for conducting Operation Qualification.
Record the results in the table below:
Acceptance criteria :All checks are conducted at real time and found satisfactory.
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Procedure : Compare the make, model no. and other specifications from the certificate with
the specifications of the component and in table below
Acceptance criteria : All checks are conducted at real time and found satisfactory
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Procedure : Check the component name and tag no. against the DQ specification.
Acceptance criteria : The actual component installed match those on the DQ specification.
Installation Qualification
Installation Qualification
DSV-13,DSV- 903489-002-004,
8, 903489-002-002,
DSV-4,DSV-6, 903489-001-002,
DSV-15
L.B.S. LABORATORY L.P.
Installation Qualification
Installation Qualification
Installation Qualification
Installation Qualification
Installation Qualification
Installation Qualification
Installation Qualification
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Objective :
To verify and document all actual or potential safety issues associated with this equipment.
Procedure :
10.0.1 Complete the applicable attachment indicating which safety specification is applicable to
the equipment.
10.0.2 Document any discrepancies in the Deviation Report Log.
Acceptance criteria :
All safety information shall be identified and documented.
Installation Qualification
Location: _______________________________________________________
Spill retention provided [ ] YES [ ] NO [ ] N/A
Toxic and Flammable Chemical Risks Controlled [ ] YES [ ] NO [ ] N/A
Biohazards contained [ ] YES [ ] NO [ ] N/A
Installation Qualification
Location: ____________________________________________________
Respiratory equipment/device in place, if required [ ] YES [ ] NO [ ] N/A
Comment : …………………………………………………………………………………………………………………………...
…………………………………………………………………………………………………………………………………………...
Installation Qualification
Objective
To document any deviation to the stated test procedure or acceptance criteria, and to evaluate
the deviation relative to acceptability of the qualification study.
Procedure
Document all deviations found during execution using the Deviation Report Form.
In case of deviation follow SOP NO. QA-QI-008
Completed Deviation Report Forms are submitted to QA for signature acceptance.
Evaluation / Assigned
Action shall Verified Action Approved
Sr No. Deviation Corrective Date for
be taken by by Completed By
Action Completion
YES NO
YES NO
YES NO
YES NO
L.B.S. LABORATORY L.P.
Installation Qualification
Summary report :
The following test function were checked during execution this protocol.
Conclusion :
1. Machine conforms with the requirements of installed components and it is released for next step of
Qualification.
2. Machine does not conform with the requirements of installed components and it is not released for
next step of Qualification until all deviations are attended and certified.
Installation Qualification
13.0 ABBREVIATIONS
14.0 ATTACHMENTS
Attachment no Description