Financial Bid
Municipal Commissioner
Ahmedabad Municipal Corporation
Sardar Patel Bhavan, Danapith
Ahmedabad – 380 001
Gujarat (INDIA)
December - 2023
INDEX
Bidders are required to fill up all blank spaces in this Bid Form
We confirm our agreement with the appointment of Dispute Adjudication Board of General
Condition of Contract.
We agree to abide by this Bid until 180 days and it shall remain binding upon us and maybe
accepted at any time before that date. We acknowledge that the Appendix forms part of our
Bid.
If our bid is accepted, we will provide the specified performance security, commence the
Works as soon as reasonably possible after receiving the Employer's Representative's notice to
commence, and complete the Works in accordance with the above-named documents within the
time stated in the Appendix to Technical Proposal.
Unless and until a formal Agreement is prepared and executed, this Bid, together with your
written, acceptance thereof, shall constitute a binding contract between us.
We understand that you are not bound to accept the lowest or any bid you may receive.
We are, Gentlemen
Yours faithfully
Signature in the capacity of duly authorized
to sign bids for and on behalf of
Address
Date
APPENDIX
TO
PRICE PROPOSAL
APPENDIX TO PRICE PROPOSAL
Conditions of Contract
Phone No. :
Fax No. :
E-mail :
Validity Period of Tender Offered 180 days from the last date of receiving of the
Tender.
Period for O & M Contract Ten years from the date of issue of certificate
for completion / taking over certificate
Confidential Details
Arbitration rules
Deductions of Material Testing : The material testing fee at the rate of 0.5 %
Expenses. shall be deducted from all R.A. Bills & final
bill of the contractor.
PRICE SCHEDULE –A
GRAND SUMMARY
GRAND SUMMARY
Price Schedule - A : (Schedule of Prices)
1. If O&M Price for Ten years is less than 35% (Thirty Five) of the quoted price in Schedule-
A for construction phase of STP at I above, bidder has to submit bank guarantee of the
differential amount valid up to the period of construction period plus 10 years O & M
period before signing of agreement.
2. Price Schedule - A along with power loading for 10 Years life cycle cost of guaranteed
total power declared by the bidder in the Technical Bid will be considered for financial
evaluation of the bid.
3. AMC will appoint an independent expert agency to evaluate the Plant Performance
including power consumption.
4. The bidder shall quote for all the units which are mentioned in the scope of work and
essentially required for completion and commissioning of work.
Bidders shall give major break-up of the lump sum prices already quoted for
Construction Phase in Price Schedule-A here.
PRICE SCHEDULE – B
Name of Work : Engineering, Procuring, Constructing, Commissioning (EPC) of Sewage Treatment
Plant of 30 MLD Capacity including Operation and Maintenance for Ten (10) years in T.P.-43,F.P.-
221+222 at Sola Area in North West Zone of AMC.
PRICE SCHEDULE – B
Break-up for Civil, Piping, Mechanical, Electrical & Instrumentation Works including Design /
Engineering, Trial Run, Testing & Commissioning for STP / Sewage Treatment Facility (EPC Basis)
Total
Civil Piping Mech. Elect. Instru. Total
Sr. Amount
Particulars Works Works Works Works Works Amount
No. (in
(Fig.) (Fig.) (Fig.) (Fig.) (Fig.) (in Fig.)
Words)
(I + II + (I + II +
I II III IV V III + IV III + IV
+ V) + V)
Gravity main from nearby
1 machine hole to SPS Inlet
chamber
2 Sewage Pumping Station
3 Rising Mains (SPS to STP)
Pre-treatment units(Inlet
Chamber, Fine Screen
4
chamber, Grit chamber,
bypass piping, etc.)
BNR Removal System (A2 O
process, SBR Process, MBBR
5 process, Membrane Bio-
Reactor (MBR) Process as
applicable)
Media Filtration(Gravity /
6 Media / Disc Filters, Filter
Feed Sump if applicable)
Disinfection Units /
System (CCT & Chlorination
7 Bldg / UV), Outlet Flow
Measurement System,
Disposal line, etc.
Sludge Treatment
Units (Sludge Sump/s, Sludge
8 Thickener, Sludge Dewatering
unit, etc.)
Buildings (BNR Blower
Room, Administrative Office/
9 Building, Chemical Building,
Security Cabin. etc.)
Roads, Pathways, Street
10 Lighting, etc.
RCC Compound Wall with
Gates and Water Supply
including service water line
11
(Service / Drinking / etc.) /
Site Drainage, Lawns,
Landscaping, etc.
Any other to complete the
12 work in all respects / Any
other Unforeseen Works
TOTAL PRICE OF
SCHED. B, IN RS. Σ (1 to
12)
Note: Bidder shall fill up price break-up in above schedule B based on their technology
selection and shall fill ZERO value for units which are not applicable
SCHEDULE - C
ABSTRACT OF O& M COST
O & M Period
Sr. 1st 2nd 3rd 4rth 5th 6th 7th 8th 9th 10th
Total
No. Year Year Year Year Year Year Year Year Year Year
BREAK UP OF PAYMENT
SCHEDULE
SCHEDULE - D
PREAMBLE
1. As mentioned in the Conditions of contract, the Contract being a lump sum type
turnkey Contract on EPC basis, the provision of measurement will be applicable
only for the assessment of value of work done for inclusion in any interim certificate
for part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items for
Civil/ Mechanical/Electrical/Instrumentation works specified in Schedule B.
3. Each item of Schedule B has been divided into broad components. The
Employer's Representative shall assess the value of each component as indicated
in paragraph 6 herein below.
5. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer’s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B
7. The payment on running bills & final bill will be regulated as per percentage
shown in each item.
8. 2% amount of all running bills shall be recovered and kept in deposit as retention
money and shall be released as per tender.
SCHEDULE OF MILE STONE PAYMENT
MISCELLANEOUS WORK
1. ANY OTHER TO COMPLETE THE WORK IN ALL
RESPECTS / ANY OTHER UNFORESEEN WORKS
a. On 50% completion of Work 45%
b. On 100% completion of Work 50%
c. On testing, commissioning and trial runs of all other works 5%
No. Items
1. On supply of equipment, pipes, specials, valves, etc. at 75%
site
2. On erection of respective equipment, pipes, specials, 15%
valves, etc. at site
3. On erection / installation 5%
4. On testing, commissioning and satisfactory trial runs 5%
100%