You are on page 1of 15
1. Detalitended a an example, Detail must match design reper. 2. For all appleations, pavement. designs rust be prepared by a regeered professional engineer, 5. Inspections: Cll BOS NR inspection fine, (303) 625-7000. Request 427.5 inspections required PAVERS WITH OPEN SURFACE SPACES x ™ SSE — vancracruner’s SPECIFICATIONS OPEN-GREDED BASE ATER (CRUSHED waste, PER DESIGN _SUBGRADE. PROTECT FROW COMPACTION ‘CONSTRUCTION REQUIREMENTS Protect subgrade from over-compaction during construction; donot constructor compact the subgrade in wet conditions. Sequence the work to avoid traffic onthe subgrade and protect the finshed pavement from construction traffic and sediment accumulation, & permeable pavement protection plan may be required oP eN-ceanen PAVEMENT Mic OPEN-CRADED BASE MATERA CRUSHED—WASHED, PER DESION SUBCRADE, PROTECT FROW COWPACTION ° FONVNOIdsd = / = DRAMING NOP TO SCALE - STORMWATER MANAGEMENT & & TYPICAL DETAILS FOR PERMEABLE PRIVATE PROPERTY Bureau of Environmental Services pavement OW—210 PONDING PER PAC, 8° 1. INuer_ FROM soucet | BULDNG ENTRANCE S | FROSION ccoNTROL 1. Detail intended as an example. assumptions and/or design 1 Detail must match PAC 2. Setbacks: 10" from builtirg foundations; 5° along property Tings except next to right-of-way. Wale cart exceed 30° eight above gre if within Sof property Uns cluding tight-of-way, 3. Planer Wale: water mast be concrete, unless otherwise approved. Walls must be inluded on foundation plans. 4, Rock Gallery/Storage Layer, as required: Size per PAC collins Cnr rock gales of 3/4" washed cn tock oven by a 3-4” fr Iyer of f-No10 waned agar agree, Aternie materi such 0 ie abe, seller trse ster ord onstrates. ay Serine under he Beroomonce Aprons mit 8ES aprox 5. Orton (F needed) reeboard, minimum, strainer or grate Overton elevation must allow for Z of Protect from debre ond sediment wih 8 Blended Scit Use BES standard sil ber! for stormwater facies (SWUY Section 6.3) unless otherwise approved Install minimum of 12° on rate sol. rsa minimum of 247 if there's 9 eainage layer or storage Iyer below the imported so 7. Vegetation: Refer to plant Ist in SWMM Section 35. Mirmurm container sve ist ga 0st of Tasty aren: 80 herbaceous pants OR 72 herbaceous plants and 4 small shrubs 8. Enrance Erosion Control: rsa Wer rock, flastore, or Similar to disp the eneray of incoming| water at tnivances and ends of downspout extersions 8, Check Dams: Spacing per the PAC. equal the fll with of the planter check dam length Inspections request 487. 3 inspections required Number of planings per rust Call BDS IVR Inspection Line, (503) 823-7000, CONSTRUCTION REQUIREMENTS ‘Mark the location of future facilities, and fence or over fclty locations after excavation. Do nat allow vehicular traffic, foot traffic, material stor ar heavy equipment within 10 feet of the iftration area except as to excavate, grade, and co sediment during construction a led the fait. Do nt allow entry of runoff er = DRAWING NOT TO SCALE — ; ) Bureau of Environmental Services STORMWATER MANAGEMENT \ TYPICAL DETAILS FOR PRIVATE PROPERTY PLANTER WITHOUT UNDERDRAIN CW 9 SW-23 ui} a a fo} Ss > Pd 9 ADJACENT TO BUILDING, WITH LINER FREESTANDING PLANTER. WITHOUT LINER sweet UNaSCAPIG DoWnsPouT [—. 2a wn ‘vERFLOW | auLoNe soucent PER PAC, ENTRANCE, | ‘BUILDING 18 TP, Bison | cook | ume | 20" SREGATE eeme | SUBGRIDE YSTERTGHT SEAL PPE | PENETRATONS| | 10 sP2RavED OSCHARGE 20m FER SECTON 13. SEE SW=243 AND S-244 FOR OVERFLOW CONFIGURATION 1. eta intended as an examples Det must etch PAC 8. Unddrin System: Sting is pr the PAC. The undertin must assumptions and/or design report. bet" skted setedule 40 PAC well eating pipe mansTatred wih 5 ats, © sts per ron. Ete the urderdain in f° No.0 2. Setbacks: No setback i required for lined planters. For shed argu sneer se" SNS for ental seen, inteaion planters the setbacks ee 5" from property Ines except Sng SH-244 fr aifice examples. Conform with Oregon Punting ext to right-of-way, ord 10" fam building founders. The Seca Caie (PSC) requrcreis. Htenatne confnrafins ond ral het rst be les han 30" above fished ge peer Sc el say aye, dag a wd Sot propery ine. Ton-sondnd oggiegates may be ed under the Perernence proach, wth BES approval 3. Planter Stuctue: single pour, moratthic concrete shell without cold jis is requed unless otherwise approved 7. heron: Oveiton elevation must allow for 7 of feshoord, rinimam. Protect trom debis ard sediment with strainer of orate, 4. Watering: No atonal waterproofing fs needed if the structure ia single pour, monolithic conerete shel 8. Vegetation: Refer to plant fit in SWMM Section 5.5, Minimum coftaner size i 1 gal Number of parings per 1005" of facity 5. Blended Scik Use BES standard sil ber for stormwter faites yaar 80 herbaceous glans OF 72 herbaceous plants ord 4 smal (GHMM Section 6.3) unk 24" of bended so ervise approved. Install mirivum of sha, 8. Entrance Erosion Cortiok Install river rock Nagstone, of sini to Aissipate the energy of incoming water at entrances and ends of downspout exersins. CONSTRUCTION REQUIREMENTS, 10, Check Dams: Spacing per the PAC, Check dam length must equal — the fall wih of the planter Do not allow temporary storage of construction waste or materials inthe facilities. Do nt allow entry of ruff or 11, Ingpeetions: Call BDS INR Inspection Lire, (803) 823-7000, request Seciment during construction 48). 3 wspections remuned = DRAMING NOT TO SCALE STORMWATER. MANAGEMENT & &e TYPICAL DETAILS FOR PLANTER WITH PRIVATE PROPERTY UNDERDRAIN Bureau of Environmental Services se VARIES PER PAC 31M, SDE SLOPES: at one PER PAC, 18 BxSTNG SUBCRADE [FoR PARKIN Lors USE TRE STOPS OF uke CUTS. WMH 12° OPENINGS FOR. PASSAGE OF STORMNATER 1. etal intended as an example, Detail must match PAC assumptions 6 and/or design report. 2 Setbacks: 5° from property lines except rast to right-of-way, 10 ftom bulking foundations. 3. Rock Galley/Storage Layer, oF equed! Size per the PAC Canstuet ook gles of f wate ein rock overin by @ 3-4" ‘iar layer of No.10 washed angular aggregate. Akermatve cotfigaatios and mates auch celuar storge systems, Granage mat ond roreslordhd apregtes ray be sed under 7 he Ptlmance Aproach wil BES opto 4. Overton: Overton elevation must allow for 2” of freboar minimum, Protect from debris and sediment with strainer ar rate. 8, 5. Blended Soil Use BES standard soll Herd for stormwater faites (HMM Section 65) unless otherwise approved. Install minimum of 9 12" on native si, Ital minimum of 24° # there's a drainage layer or storage layer below she imported sil Vegetation: Refer to plant fst in SMM Section 3S. Minimum anit size is 1 gal Number of plantings per 1008 of focty Zone A (wet): 80 herbaceous plants OR 72 herbaceous plans tnd 4 rll shrubs, Zone B (moderate to dy): 7 large or sivll shrubs AND 70 sfoundcover plants Te delnestion between Zone & and 8 shall be eter atthe outlet elevation ot the check dam elevator, whichever is lowest. It Project area ie over 200s consider ating a tree Enrance Erosion Control rsa iver toc, flagstone, or similar to dlsipate the ererey of incoming water at entrances ond ends of downspout extensions, Check Dams: Sparing per the PAC. Cheek, dam ends must be hejed into the rave so a minimum of 12" Inspections: Gall 30S. WR Inspection Line, (503) 823-7000, reque' 48) 3 inspections required CONSTRUCTION REQUIREMENTS Mark the location of futur facities, and fence or cover facity locations after excavation. Do not allow vehicular trafic, foot traffic, material storage, or heavy equipment within 10 eet ofthe infiltration area except as needed to excavate, grade, and const. the facility. Do nat allow entry of runoff or sediment during constuction, = DRAWING NOT TO ScaLE - ~ STORMWATER MANAGEMENT TYPICAL DETAILS FOR PRIVATE PROPERTY [Bureau of Environmental Services BASIN WITHOUT Sw—240 UNDERDRAIN EETMEEEE) ERT ZECEEEE EA 31 We She stores, - ovo Pe PC, 18 WF | RA cr a ASE wi SNE FOR PARKING LOTS USE TE STOPS OR (CURB CUTS WITH 2" OPENNOS FOR PASSAGE OF STORMWATER FLIER AGGREGATE LUNER (IF REQURED) BHTING SUBORE \ \L waTERTIGHT SEAL aT PIPE PENETRATION ‘Lo semsven oscnange ron mE SEETON 13 SEE SW=213 AND SW=244 FOR OVERFLOW CONFIGURATION 1 etal intended as an example, Ostal must match PAC 6 assumptions and/or design report 2. Setbacks: None required 3. Oerfow: Overflow elevation must allow for 2 of freeboard ? rminimum, Protect from debris and sediment with strainer or ‘ate 4. Underrcin Systems Sizing is per the PAC. The underdain must 8 be 4” sted schedule 40” PVC well eating pipe marafctured with (050 slots, 6 sles ger rom, See SH=245 for longudinal ection land SW-244 for office examples. Conform wih Oregon Plirking 9 Speciaky Code (Q®SC) requirements, Aeratie configurations tnd materials such as celular storage systems, aainage mat, land nor~standard aggreeates may be used under the Perermance Approach, wih BES approval 5. Vegetation: Refer to plat fist in SWUM Section 3.5, Misia container sie is 1 ga. Number of plantings per TO0st of faxity Zone & (wet): €0 herbaceous plants OR 72 herbaceous plants Gnd 4 small shrubs, Zone @ moderate to dey): 7 large ‘roundeover plots ‘he delineation between Zone A ard B shall be either atthe cuit elevation or the cheek dam ebvaton, whisever ® lowest, WF projet avon ie over 2003 consider ring a tee small shrubs AND 70 Blended Sot Use BES standard soll bend for stormmater facies (SAMM Section 6.3) unless otherwise approved. stall rina of 24" of Herded soi. Waterpoat Liner 30. ri EPDM, HOPE oF opproved exis’ Entrance Erosion Control nstll rer rock, dagtone, or sian to adesipae the energy of incoming water at entrances and ends of downspout extensions Check Oams: Spacing per the PAC. Check dam ends must be eyed into the native soll a minimum of 12° Inspections: request 487, Call BOS IWR irspection Line, (503) 823-7000, 3 inspections reqited CONSTRUCTION REQUIREMENTS Donat alow temporary storage of construction waste or materials in the faites. Do not allow entry of runoff or sediment curing constuction. = DRAMING NOT TO SCALE — STORMWATER MANAGEMENT TYPICAL DETAILS FOR PRIVATE. PROPERTY 7 ) [Bureau of Environmental Services BASIN WITH UNDERDRAIN SW-24 FULL INFILTRATION - LEVEL 1 2 (os Oe INFILTRATION PAC CONFIGURATION a, 8 ye ? BITRE see | INFILTRATION W/ ROCK GALLERY PAC CONFIGURATION A, & veRFLOW ADA. /-- PERFORATED COLLECTION PPE TO RUN THE LENGTH! OF FACIUTY OVERFLOW DIRECTED TO DRAN ROCK. PAC CONFIGURATION E, F. SEE SH791 OR SHW297 FOR MORE INFORMATION Hybrid facity must be egitered as a UE. OFFSITE DISPOSAL - LEVEL 2 & 3 covenrLon DISCHARGE POINT PER Sindw SECTON 1.3 [SLOTTED PPE = ‘To aPeROvED EEA ASK AAK RS re (SEN: wrewpsts ee EXISTING ws ten “ eked See BORO PARTIAL INFILTRATION OR_LINED ‘OVERFLOW AND UNDERORAN REQUIRED, SET UNDERORAN WITHIN DRAWN ROCK. PAC CONFIGURATION C AND SEE SW-243 FOR PLAN AND LONGMUDINAL SECTION = DRAMINGS NOT TO SCALE — STORMWATER MANAGEMENT TYPICAL DETAILS FOR PRIVATE PROPERTY GN Bureau of Environmental Services HIERARCHY CROSS SECTIONS SW-242 ToAPPROVED DISCHARGE PORT BEEHIVE INTENDED ONLY AS AVEXAMPLE ‘OVERFLOW AND ACCESSIBLE ORFIEE 70 an BE DESIGNATED BY DESISNER SLOPE “aun SLOPE FACILITY WITH UNDERORAIN PLAN Vl BEEHIVE TENDED ONLY AS AN EXAUPLE, OVERFLOW AND ACCESCBLE ORFIRE To SE DESIGNATED BY DESIGNER, SEE S1-264 FOR EXAMPLES, | eee 1 i | OP-OF-CuR (100) ToaPpRovED No.0 WASHED OISCHARGE ANGULAR AGGREGATE, { << F* PONDING ve pee ¥ yee ig OTH vo kek D ROOT KRY Y MLEIZI”N ZING D> DROP SSTOPPLOPPOODY™—_ MB SS LA] sonoss RRR RAG LA) mere Re ” Tt Td SLOTTED ve UNDERORAIN RUN 14 0F Powr |MOUNDED OVER PIPE. FACILITY LENGTH, MATCH REQUIRED) Pre ate FACILITY WITH_UNDERDRAIN LONGMTUDINAL SECTION AA ~ bramics Nor 10 scaue ~ STORMWATER. MANAGEMENT ey 5 > } | TYPICAL DETAILS FOR conreuaa SW-243 PRIVATE. PROPERTY NFIGURATION Bureau of Buvionmental Serces een A CAPPED UNDERORANN DISCHARGING INTO OVERFLOW STRUCTURE vumuryvaar W NW a —— UNDERDRAN —— omer 5 2 aed eet OR TENA Saris en c ~STANDPIPE FOR GATE a VAVERMOLE CATE VANE DRILLED WT ORF 1 The minimum diameter for ones taking ony feted flow is 5/8” This applies to examples AB, ©. The minimum diameter for fies taking Some unitered flow is't" with addional measures required to prevent clogsng. See example 5, Materia For offices <3" in diameter, the ot rust be a strong, thin material such as storlss sta, HOPE, of PVC. The thihness of the onic plate must be ese shan the orice chmeter, B CAPPED UNDERDRAIN DISCHARGING INTO JUNCTION BOX [iy AB Ze acd i SANZ Yel, h e KI ee =n one: CORFICE OR ALTERNATIVE ORFICE SETUP D EXTENDED DETENTION WITH PIPE So /NARY OVERFLOW 4. i SWZ SUZ ee = owner \WTH STANLESS SCREEN. = DRAMINGS NOT TO SCALE — > ) STORMWATER MANAGEMENT TYPICAL DETAILS FOR PRIVATE PROPERTY Bureau of Environmental Services ORIFICE CONFIGURATION EXAMPLES (CHECK Oa NOTE, now SEE NOTE 2 2a 12" OF 1/4°=NO, ANGULAR AOGREGATE ENTRANCE EROSION CONTROL 4 Pv SLEBE TOP_OF A BLENDED SOIL atte SUaGRADE vues /] WALL sion Controk Install free toek, flagstone, of inn to ‘sip the ener’ incaing water ot entrances and end 0 downspout extensions Ertarce 2 Watetol: Check dans ean be cantidcted of oer resistant Imaterle sich as cedar ond hniper. Treated lrber Is ot ecepable, = DRAMINGS NOT TO SCALE — ~ STORMWATER MANAGEMENT \ TYPICAL DETAll R PRIVATE PROPERTY S FO PLANTER Wy 5 cHeck pam = W245 TRAPPED SILT BASIN CAP ENO OF PERF PPE 12" MN. 10 > TU? OF PPE OSs oe 0° from feundations and S' from property Ines. The exception to the property setback i next to the right-of~nay, where no setback i reuired Prectreatment: A trapped sit basin such as a surped catch basin optonal on Tor roof run"? and pedestiar-orly paved 6. Pipirg: Conform with Oregon Plumbing Speciaty Code (OPSC) renuierens, 7. Inspections: Call BOS. NR inspection line, (508) €23-7000, Request 487.3 inspections required PE, THEN FOLD FILTER FABRIC TO COVER PERF RPE AND DRAN ROCK aya 2 wit WASHED ORIN’ ROCK ‘CONSTRUCTION REQUIREMENTS ‘The outine ofthe facity must be clearly marked before site work begins to avoid soll disturbance, Use of heavy equipment shouldbe minimized within 10 feet of soakage ‘trench areas. The bottom ofthe soakage trench and the perforated pipe must be level. ‘Smesring the sol surface during excavation can potentially iit infiltration rates; if smooth excavation tools reused, roughen the sides and bottom of the excavation with sharp pointed tool Remove aose material from the bottom ofthe excavation DESIGN REPORT PER GREEN TRACER LUNE Ov PIPE = DRAMINGS NOT TO ScaLE - Z ) Bureau of Environmental Services PRIVATE PROPERTY STORMWATER MANAGEMENT SOAKAGE TRENCH SW-260 ACESS MANTENANCE HOLE, "8S REQUIRED = DRARING Nor To SCALE - < tres an cn ¢ ATERNSTE PREREATUENT, 235 REQUIRED 12° Tok NER OF Ff = 2. MSHED DRAN ck ache THE coveseTe STRUCTURE AAD Sa, AND ero we Ub Detail intended as an example, Detail must match design vepor. Siting Crea The base of the dryell must be atleast 8" above seasonal igh groundwater, unless otferise opprove. See SAMMY Section 2.2 for adtionl teria that may restr ifitraton, Sizing: Per stormwater report. Setbacks: Measured from the center, the dryell must be 10" foundations ard 5" from property tines. The exception to the property line setback is next to the right-of-way, where no etback Fe required between the edge of the dywll drain rock ard the Property line. Measure all setbacks fam the edge ofthe drain rock FF the thickrase of the rock lyr exceeds 12" Piping: Conform with Orepon Pluring Speriaty Code (09SC) requires Access Maintenance Hole: A maintenance hole ie reqited in commercial and industrial setings ord for dywlls that don't mee fetuck requremerts, Access ie hgh recommended in residential setting, but rot required, PrecTreatment: A topped sit basin such as @ sumped catch basin is optional only for roo? runoff and pedestan-only paved ates, Inspections: Call BOS WR inspection fa, (505) 823~7000. Request 487.3 inspections requed ‘CONSTRUCTION REQUIREMENTS ‘smearing the sol surface during excavation can limit infiltration cates, fsmaeth excavation tools ae used, roughen the sides and bottom of the sharp pointed tool. Remove loose material from the bottom ofthe excavation cavation with @ Bureau of Environmental Services \ }| TYPICAL DETAILS FOR PRIVATE PROPERTY STORMWATER MANAGEMENT DRYWELL SEPARATION mR — 12" eouReD . PNG COVER BY 1/2"-2" RAIN ROCK. '30-MIL UNER 08 Fauna Br 1/2°-2" RAN ROCK. REQUIRED: TRAPPED B 4° PERF. PPE SIT BASIN W/UD a “ 2 PE SUE PEL sw eee 2" MN, 4 SOUD OVERFLOW PPE NaT-COWNECTED TO PERFORATED DISTRIBUTION SEPARATION [ 4° SOLD PIPE SOAET 1 sroroven burt Par See STON 15 sectong SE SATIN) SHNOY LOAM TO GRADE covenruow ELEVATION 30 ML UNER (oR EQUNALENT WHEN REQUIRED 4° PeRroRsteD DISTRIUTON PPE TRACER WRE ON 4 PearoRareD NON-METALLIC SUBSURFACE PPE COLLECTION PIPE 1. Prove protection ‘rom all vehicle tafe, equiprnent staging, and foot ‘tafe i proposed tion areas prior to ond dung constuction 2. Setbacks: Setbacks arent required for fied facies. Setbacks for infitration facies, measured from the faciy edge, are 10" ram foundations and 8 from property tines except next to the right-of-way, 3. Topped sit basin reqived prior to inlet to subsurface sand iter, 4. Overton: Perforated collection pips within top gravel lyr. 5. Piping: Conform with Oregon Plurbiog Specaty Code (0PSC) requirements 8. Drain Rock and Fiker Sart: a. 8" of 3/4" washed din rock ob base Sor" of washed fiter sand per SAM Section 3.244 8 top layer of 3/4" washed dain rock over sar Separation ‘between drain rock and sarc Use fier fabic or a srvel lens (3/4 ~ 1/4 inch washed, crushed rock 2 to 3 inches oep) oF approved equivalent. 7. Waterproof Liners Must be 30 il EPOM, HOPE or equivalent for ‘CONSTRUCTION REQUIREMENTS, ‘oct when ring is required. ‘The location ofthe inflation sad iter must nt be compacted 8. Inspections: Cll DS VR Inspection Line, (803) 823-7000 prior to, during, and aftr the construction ofthe fact. Request 487.3 inspections required. DRAMINGS NOT TO SCALE ~ STORMWATER. MANAGEMENT \ } | TYPICAL DETAILS FOR SUBSURFACE SW—280 PRIVATE PROPERTY SAND FILTER. Bureau of Environmental Services INLET FRAME AND GRATING, SEE NOTE 4 PERF PIPE INLET SEE PLAN FoR SUE OVERFLOW PIE aM = SEE PLN _ crane aM = SEE PLAN STORAGE OEPTH 2 — 3000 ps 1 coneete STOOE CEH Z ao an BOTTOM OF AS Tat SEE PLAN YC) to storm system : je Pe ae T Note 2—/ ween erener wn. SOME _-— 5° OWETER WEEP HOLES | IN BOTTOM (5 MIN) Sof 4p ge or is wore 3 ‘SECTION 1. Gearing and frame must be goarized ste! medium ety 2. 8 da. oul pipe with uptured bow 3. Secure outlet pipe with s/s band embedded 2" in wall = DRAMINGS NOP TO ScALe ~ d STORMWATER MANAGEMENT | FACILITY OVERFLOW \ } TYPICAL DETAILS FOR CONFIGURATION E SW-29 | = PRIVATE. PROPERTY Bureau of Environmental Services sam 4° PERF PPE we / OvERRLOW PIPE RW = SEE PLN Ry = SEE PLAN STORAGE DEPTH 1 BOTTOM OF BASN SEE PLN INLET FRAME AND GRATING SEE NOTE SEE PLN FOR SIE _Z od _— 3000 psi ConceeTE ‘To sToR SYSTEM IE = SEE PLN. 6 MN. A PERE PIPE LET rs ws, SUP 1. Gating and frame must be goharized steel medium duty. 2. 8 din. cult pipe with upturned elbow. 3. Secure cute pipe with £/s bard embeded 2° in wall OUAMETER WEE? HOLES orton (6 —— = 6 BASE MATER, = DRAMINGS NOT TO SCALE - STORMWATER MANAGEMENT TYPICAL DETAILS FOR PRIVATE PROPERTY CON [Bureau of Environmental Services FACILITY OVERFLOW yy) V-292 FIGURATION F /— FH RADE RUSHED ROCK Ls acevo —T 0 1 VARIES rt ) la ery hs lo fae 48 re. 18" np. —+] | abs A & a = DRAMINGS NOT TO SCALE - <8 [Bureau of Environmental Services STORMWATER MANAGEMENT TYPICAL DETAILS FOR PRIVATE PROPERTY SEDIMENTATION MAINTENANCE SW-295 8 HOLE

You might also like