Professional Documents
Culture Documents
Service Documentation: Market Release 10/99
Service Documentation: Market Release 10/99
5601
BINC Rev: 9/99 Service Documentation
Exploded Drawing
BAG Rev: 9/99 5601
5601 - 2
BINC Rev: 9/99 Service Documentation
Spare Parts List
BAG Rev: 9/99 5601
5601 - 3
BINC Rev: 9/99 Service Documentation
Service Information
BAG Rev: 9/99 5601
5601 - 4
BINC Rev: 9/99 Service Documentation
Service Information
BAG Rev: 9/99 5601
Housing Unscrew screw "B" (3c) of the housing back part (8).
Press together the housing front part (5) in the area of
the bearing pin; then, insert a wide-bladed screwdriver
into the guide slot on the left side of the sliding switch
and unhinge the housing snaps. Now, pull apart the
housing halves.
Motor (6) Remove the screw (3c) in the housing font part (5).
Unsolder the connecting wires to the PCB (7).
PCB (7) Remove and snap out plug connector.
5601 - 5
BINC: 9/99 Service Documentation
Service Information
BAG: 9/99 5601
Motor (6) Insert the motor (6) into the housing front part (5) in
such a way that the indentations for the swivel head
snaps on the left side of the cover point towards the
memory slider. Then, fix with screw (3c).
PCB (7) Before inserting the PCB, please make sure that the
contact slider is placed correctly into the connecting-
link, gripping into the carrier of the memory slider.
Press the connecting plug into the supporting clamps of
the socket housing. Insert the PCB.
Solder the connecting wires to the motor; pay attention
to the correct poles!
(Solder the plus wire (red) to the motor connection
marked with a red dot).
Housing When pressing together the housing halves (5 + 8), the
guides of the central and memory switches must grip
into the housing lower part.
Screw the screw (3d) into the housing back part.
Swivel frame (4) Insert the swivel frame (4) into the pick-ups, the spring
notch "C" being on the side of the memory slider.
Insert the pin (3b).
Push the springs (3a) onto the pins (3b) from the
frame's inside.
5601 - 6
BINC: 9/99 Service Documentation
Service Information
BAG: 9/99 5601
• Recharge shaver approx. 5 minutes. (The green lamp must burn permanently).
• Disconnect shaver from the mains and measure voltage via battery.
The voltage of the cell must exceed 1.2 V. If this value is indicated, the PCB is
in order.
Maintenance note To maintain the optimum cutting performance of the beard trimmer and the
optimum life of the battery it is absolutely necessary to clean and to grease the
cutter set (2) regularly.
Please proceed as follows:
• Apply a drop of resin-free oil (e.g. sewing machine oil) between the cutters
and the sliding spring bearings in the back.
Attention Used batteries must not be disposed of in the household waste, but at
appropriate disposal sites.
5601 - 7