Professional Documents
Culture Documents
TPS2023 - Another Case of Gas Charged Dampeners Not Controlling Pressure Pulsations - Rev03
TPS2023 - Another Case of Gas Charged Dampeners Not Controlling Pressure Pulsations - Rev03
•
Project Background
•
•
•
•
•
•
•
Problem
•
•
o
o
•
As-built Pulsation Controls
•
As-built Pulsation Controls
•
o
Field Pulsation and Vibration Testing
Suction
• dampener
PUMP
• Suction
dampener
PUMP
• Discharge
dampener
Vibration Evaluation
•
Problem
• Concern
o
o Acceptable
o
Suction and Discharge Vibration Measurements
70% speed
80% speed
90% speed
100% speed
EI – Concern Limit
EI – Problem Limit
Suction and Discharge Vibration Measurements
70% speed
80% speed
90% speed
100% speed
EI – Concern Limit
EI – Problem Limit
Suction Pulsation Measurements
Discharge Pulsation Measurements
•
•
Solution: Pulsation Analysis
•
Solution: Pulsation Control Designs
•
o
o
o
•
o
o
o
o
•
Solution: Surge Volumes
Solution: New Pulsation Controls
•
Discharge
o surge volume
•
o
Suction surge
dampener
•
Solution: New Mechanical Considerations
• Discharge surge
volume support
structure
•
Solution: Installed Pulsation Control Devices
• Discharge
Discharge surge
volume support
surge volume structure
•
Suction surge
• dampener
Site Acceptance Testing
Conclusions
•
o
o
•
•
•
•
•
References
•
•
Questions?