Professional Documents
Culture Documents
19
30
18
29
14
13
12
28
17
11
09 10
25 26
16
27
15
08
07
23 24
A B C
06
05
21 22
04
03
02
01
KEY PLAN
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS ARE IN
METERS UNLESS STATED OTHERWISE.
2. MATERIALS & WORKMANSHIP TO Q.C.S.
3. ALL LEVELS ARE BASED ON QATAR NATIONAL
DATUM (QND).
LEGEND :
SHD-2558 SHD-2559 SHD-2559 P007-ABN-CCC-AR-3067 JUNCTION B4 ARCHITECTURE PEDESTRIAN BRIDGE SECTION REV.CA
Construction Contractor :
Design Consultant :
Sub Contractor :
Project Name:
Project Code:
IA 15/16 C 002 ST
Status:
Drawing Title:
Designed: Approved:
SE SECTION - B Date:
JULIOUS
Scale:
FEBIN
22/05/2022 1:15
SHD-2548
Drawing Number: Revision:
P007-ABN-CCC-AR-SHD-2557 S01