Rev No :
KAK-AYT-REC-CMS-0001
A00
FOR Date : 21-June-2021
EARTHWORKS Page No : 1 of 10
Contract No : C&F-45204
EARTHWORKS Page No : 2 of 10
TABLE OF CONTENTS:
1.0 SCOPE ...................................................................................................................... 03
2.0 PURPOSE................................................................................................................... 03
3.0 REFERENCES.............................................................................................................. 03
EARTHWORKS Page No : 3 of 10
1.0 SCOPE
This method statement shall outline activity steps and sequence of work including excavation,
compaction and backfilling of soil for the installation of pre-cast foundation covered by the scope of the
project.
2.0 PURPOSE
The methods and sequence of activities contained in this document shall serve as guidance and
reference to ensure proper execution of all related activities are in accordance with contract
requirement, safety & quality assurance. This method statement shall detail the work and concerns that
is to be given attention in each activity as to the following:
3.0 REFERENCES
ASTM D6938 - Standard Test Methods for Density of Soil and Soil-Aggregate in-place by
Nuclear Method
ASTM C136-14 - Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates.
ASTM D4318 - Standard Test Methods for Liquid Limit, Plastic Limit and Plasticity Index
of soils
OSHA 29 - OSHA Safety and Health Regulations for Construction
METHOD STATEMENT Doc No :
Rev No :
KAK-AYT-REC-CMS-0001
A00
FOR Date : 21-June-2021
EARTHWORKS Page No : 4 of 10
EARTHWORKS Page No : 5 of 10
EARTHWORKS Page No : 6 of 10
EARTHWORKS Page No : 7 of 10
EARTHWORKS Page No : 8 of 10
7.2 Excavation
EARTHWORKS Page No : 9 of 10
7.3 Backfilling
1. Fill and backfill operations shall be performed after subsequent sub-structure construction
and/or pre-cast structure installation work has been completed.
2. While filling structures installed or constructed within excavated pits, the temporary shores
and supports shall be accordingly removed in parallel. Do not leave any unnecessary
materials buried with the pits.
3. Fill or backfill material shall not contain any deleterious materials such as waste materials,
large boulders, organic materials, construction debris, etc.
4. Filling shall be done in a proper manner so as not to damage the waterproof coating applied
on the structures or chipping and scratching the structure itself.
5. Do not compact backfilled soil directly beside the structures up to 300m distance away.
These shall be water compacted and tampered manually to avoid motion caused by force
from mechanical compactors and damage to the coating.
6. Fill and backfill activities shall be done in layers of 300mm for non-cohesive material or
200mm layers of cohesive material.
7. Each layer of fill and backfill are to be compacted sufficiently. At every 3 lifts and at the final
layer of fill or backfill, a compaction test shall be performed with third-party inspector.
8. The final layer of fill or backfill shall follow details and elevations shown on IFC drawings
making sure subsequent construction activities are taken into consideration.
9. The top layer of fill or backfill shall follow level and grades shown on IFC drawings and any
difference shall be within allowed vertical tolerance of not more than ±15 mm.
10. All disturbed soil shall be regularly wetted with water to avoid the sand/soil particles to
cause hazards from free flying dust and fine soil particles.
11. Backfill until the existing top level of ground and compact the top layer with plate
compactors. Field density test shall be performed on the compacted top layer if the area is
going to receive further construction works (i.e. paving, foundations, etc.)
12. Reinstate the top surface of ground to its original condition and all excess earthwork or
construction materials shall be taken out of the area.
METHOD STATEMENT Doc No :
Rev No :
KAK-AYT-REC-CMS-0001
A00
FOR Date : 21-June-2021
EARTHWORKS Page No : 10 of 10
8.1 Permit to work shall be secured prior to starting any site activity.
8.2 All workers shall comply with the requirements of the approved project safety manual, job safety
analysis and permit conditions.
8.3 All workers shall wear required PPE at all times while engaged on the work.
8.5 All mechanical/electric tools used are in good condition and inspected by SAFETY.
8.6 All excavation pits are secured, protected and isolated with hard barricade.
8.7 Avoid huge stockpiles or earth and construction materials at edges of excavation
8.9 All shoring panels and supports are sufficiently provided and amply stabilize retained soil as
required.