You are on page 1of 4

B13: MEMBRANE WATERPROOFING SYSTEM

PART I : GENERAL

A. GENERAL REQUIREMENTS

Work of this section, as shown or specified shall be in accordance with the requirements of the whole set of the Contract
Documents.

B. SCOPE OF WORK

Provision of labor, material, and equipment and perform all membrane waterproofing as specified and as shown on
drawings with related accessories.

1. Work included:
a. Installation of membrane waterproofing on :
Concrete tank structure (external), Roof slab, roof garden, Toilet / Bath room and other locations shown on
drawings.
b. Installation shop drawings.
c. Accessories and other supporting material required for installation.
2. Related Section: Concrete Works, Structure Specification.

C. REFERENCES

1. ASTM D 146 - Pliability.


2. ASTM D 412 - Tensile strength.
3. ASTM D 882
4. ASTM E 154 - Puncture resistance.
5. ASTM G 54

D. SUBMITTALS

1. General : Submit following items in accordance with Section 01300.


2. Product Data : Submit manufacturer’s technical literature for each product.
3. Qualification Data : Submit applicator qualifications verifying years of experience; include list of
completed projects having similar scope of work identified by name, location,
data reference name and phone number.
4. Manufacturer’s Instructions : Submit manufacturer’s printed installation instructions for each product; include
applicable temperature ranges.
5. Manufacturer’s Field Reports : Submit summary of job site observations, instructions and dated warranties from
manufacturer and applicator.
6. Warranty : Submit signed and dated warranties from manufacturer and applicator.

E. QUALITY ASSURANCE

Applicator Qualifications:
1. Company specializing in application of specified waterproofing.
2. Minimum 5 years documented experience.

F. PRE-INSTALATION CONFERENCE

1. Conduct pre-installation conference in accordance with Section 01200.


2. Require attendance of manufacturer’s representative, applicator and related trades interfacing with system. Review
and coordinate interfacing with adjacent materials, terminations and methods of flashing.
PT. WIETASHA PUTRINDO WISATA B13 - 1 ALAM KULKUL RESORT PROJECT
G. DELIVERY, STORAGE, AND HANDLING

1. Deliver, store, handle, and protect products in accordance with section 01600.
2. Do not double stack membrane pallets.
3. Keep primer, mastics, and adhesives in dry area away from flames, sparks and excessive heat.
4. Cover materials and allow for adequate ventilation.

H. SEQUENCING AND SCHEDULING

1. Coordinate and schedule work to ensure that construction materials placed against or over waterproofing and
protection system will occur within seven days of membrane installation. Do not expose membrane to ultraviolet
rays beyond period of time recommended by system manufacturer.
2. Install protection board within 24 hours of membrane installation.

I. WARANTY

1. Provide manufacturer and fabricator warranties in writing.


2. Furnish executed warranties guaranteeing installed waterproofing system to be free of leaks and free from defects
in materials and workmanship for 10 years from date of Substantial Completion of Project.

PART II : PRODUCTS

A. PRODUCTS AND MANUFACTURERS

Acceptable Products and Manufacturers:


1. Membrane waterproofing system: “ Bituthene “ by W.R. Grace & Co. or equal approved, “ Proofex GP “ by
Expandite or equal approved.
2. Coating membrane-waterproofing system: ex “ Tremproof “, “ Barralastic “, “ Bitumat “ or equal approved.

B. MATERIALS

1. Sheet Membrane:
a. Sheet membrane for concrete tank structure, deck roof, roof garden shall fulfill the following requirements :
 Self adhesive and cold applied.
 Factory made, composite products with a minimum thickness of 1.5 mm consist of 1.4 mm of rubberized
asphalt and 0.1 mm of cross-laminated polyethylene film.
 Tensile strength not less than 2800 kpa. ASTM D 412.
 Equal to Grace Bituthene 3000 or equals approve.
b. Sheet membrane for ordinary concrete roof and other wet area like toilet floor ,etc and shall fulfill following
requirements :
 Self adhesive and cold applied.
 Consist of high strength 1.0-mm thick playable membrane composed of polyethene sheet, 1 factory
coated one side with layer of rubberized asphalt.
 Tensile strength not less than 2800 kpa ASTM D 412.
 Equal to Bituthene 2000 or equal approve
2. Primer: For all substrates to be covered by sheet membrane waterproofing: Rubber based liquid type, equal to
Grace – Bituthene Primer or equal approve.
3. Mastic: For all utilities through the waterproofing parts and small cracks of concrete before application of
waterproofing materials: Rubberized asphalt’s type, equal to Grace – Bituthene EM - 300 Mastic or equal approve.
4. Cement mortar: Epoxy or latex modified cementitious composition. Product of Laticrete or equal approved.
5. Concrete Patching Compound: Fast setting, non-shrinking patching compound. Product of Laticrete or equal
approves.
6. Wire Mesh:
a. Material: Hot dip, galvanized welded mesh.
b. Spacing 100 x 100 mm, dia. 5.0 mm.
c. Acceptable product: PT. BRC Lysaght Indonesia or equal.

PT. WIETASHA PUTRINDO WISATA B13 - 2 ALAM KULKUL RESORT PROJECT


7. Polystyrene Protection Board: Expanded high-density polystyrene board, conforming to FS HH-I-524C, Type I,
Class A, 30 mm thickness.
8. Protection Board Adhesive: Type recommended by board manufacturer and compatible with membrane.

PART III : EXECUTION

A. EXAMINATION

1. Examine surfaces for conditions that would adversely affect execution. Do not proceed until unsatisfactory
conditions are corrected. Beginning of execution will constitute acceptance of conditions.
2. Ensure surfaces are reasonably smooth and free of holes, cracks or projections that might be detrimental to
successful installation.
3. Verify that items penetrating waterproofing system are securely installed.
4. Verify that masonry joints are struck flush with face of unit.

B. PREPARATION

1. Protect adjacent surfaces not designated to receive waterproofing.


2. Clean and prepare surfaces in accordance with manufacturer’s instructions.
3. Seal cracks and joints in accordance with manufacturer’s instructions. Use proper depth-width ratio recommended
by sealant manufacturer.
4. Remove sharp projections, fins, and loose material. Remove form ties to 18-mm minimum behind face or wall. Fill
holes, voids, and honeycomb areas flush with concrete patching compound or cement mortar.
5. Seal penetrations with mastic.
6. Provide fillet or cant at junction of vertical and horizontal surfaces using cast-in-place cement mortar in
configuration acceptable to membrane manufacturer

C. WATERPROOFING INSTALLATION

1. Install products using skilled workmen in accordance with manufacturer’s printed instructions.
2. Extend membrane over footing and down face 15-cm minimum, except terminate at point 30cm below floor slab of
protected space where footings are at greater depth.
3. Apply primer at rate indicated by manufacturer. Install only as much primer as can be covered in same day.
4. Prior to placing full membrane, provide membrane strips at inside corners, outside corners, ad working joints.
Center strips along axis of corner and joint.
5. Install sheet with edges and ends overlapped at dimensions recommended by manufacturer.
6. Remove release paper layer. Roll out surface with mechanical roller to encourage full contact bond.
7. Completely bond sheet to substrate, except those areas directly over or within 7.5 cm of working cracks or
expansion joints.
8. Place uniform beads of mastic joint edges at locations recommended by manufacturer.
9. Seal perimeter ends and edges to adjoining surfaces.
10. Seal items penetrating membrane with flashing membrane material and liquid membrane. Ensuring positive seal
with membrane and penetrating member.

D. PROTECTION BOARD SCREED

Install protection screed of 25-mm thickness over membrane and retain in place in accordance with manufacturer’s
instructions

E. PROTECTION BOARD

Install polystyrene board on vertical wall of basement and water tank

F. WIRE MESH

Install wire mesh for car park roof slab for reinforcement of concrete topping over protection screed (thickness of topping
see drawing and refer to section 03300)

PT. WIETASHA PUTRINDO WISATA B13 - 3 ALAM KULKUL RESORT PROJECT


G. ROOF GARDEN

Items to be installed over protection board done by other section (consist of drainage system, filter fabric and soil)

H. FIELD QUALITY CONTROL

Flood Tests - Horizontal Surfaces:


1. Before protection board covers completed surfaces, test for leaks with 5-cm depth of water maintained for 48
hours.
2. Repair any leaks revealed by examination of substructure, and repeat test until no leakage is observed.

I. PROTECTION AND CLEANING

Protect adjacent surfaces from damages and stains. Clean, materials from surfaces where inadvertently applied.

===============

PT. WIETASHA PUTRINDO WISATA B13 - 4 ALAM KULKUL RESORT PROJECT