0% found this document useful (0 votes)
49 views54 pages

Coating Inspection Reports Overview

Uploaded by

rohit.patel0198
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views54 pages

Coating Inspection Reports Overview

Uploaded by

rohit.patel0198
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

PRIVANSA ENGINEERING PRIVATE LIMITED

Format No. PEPL/QA/01 REV.00


26\07\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- ABHI TECH FAB & MACHINING PRIMER - GREY
Part No :- K.00132.195.01.00,K.00132.198.01.00 Final Coat 9002 & 9006

Surface Preparation Details Surface Rquirement - SA 2.5


Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 10\07\22 22\07\22 22\07\22 23\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED GREY 9002

6 Batch No. NOT REQUIRED

7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER


8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50-60 80-100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 26\07\22 Date : 26\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
20\07\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- SHIDHI GIRI ENGINEERING. PRIMER - RED
Part No :- COA3165719,COA5019131,COA5019132. Final Coat 1013

Surface Preparation Details Surface Rquirement - SA 2.5


Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 90µ 200-270 µ min
TOP COAT Primer2ND Coat: 90µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 04\07\22 05\07\22 15\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED RED 1013

6 Batch No. NOT REQUIRED 2831826-1 2837241

7 Coating Manufacturer NOT REQUIRED JOTUN JOTUN


8 Min DFT (µm) NOT REQUIRED 170 220
9 Mean DFT (µm) NOT REQUIRED 180 250
10 Max DFT (µm) NOT REQUIRED 190 270
11 Final DFT Range NOT REQUIRED 170-190 220-270
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 20\07\22 Date : 20\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
26\07\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- ABHI TECH FAB & MACHINING PRIMER - GREY
Part No :- K.00132.195.01.00,K.00132.198.01.00 Final Coat 9002 & 9006

Surface Preparation Details Surface Rquirement - SA 2.5


Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 10\07\22 22\07\22 22\07\22 23\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED GREY 9002

6 Batch No. NOT REQUIRED

7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER


8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50-60 80-100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 26\07\22 Date : 26\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
12\07\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- SAMARTH TECHNOCRAT PRIMER - GREY
Part Name :- M S TANK Final Coat IS 631
PART NO - ADA-1722034-02 , ADA-1722035-02
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: IS 631 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 07\06\22 08\06\22 09\06\22 11\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 00:30 - 03:00 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED Grey IS 632

6 Batch No. NOT REQUIRED 674 TCG\05\22\182

7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble


8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 12\07\22 Date : 12\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
03\07\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- BIJU INDUSTRIES PRIMER - GREY
Part Name :- M S TANK Final Coat IS 632
PART NO -
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: IS 632 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 28\06\22 29\06\22 30\06\22 02\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 13:30 01:00 - 03:00 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED Grey IS 632

6 Batch No. NOT REQUIRED 674 TCG\04\22\178

7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble


8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 03\07\22 Date : 03\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
6\07\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- BIJU INDUSTRIES PRIMER - GREY
Part Name :- M S TANK Final Coat IS 632
PART NO -
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: IS 632 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 02\07\22 03\07\22 04\06\22 05\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 13:30 01:00 - 03:00 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED Grey IS 632

6 Batch No. NOT REQUIRED 674 TCG\04\22\178

7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble


8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 06\07\22 Date : 06\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
1-Jul-22

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7001 / GREY
PRIMER
Customer Name :- ABHITECH Final Coat RAL
Part Name :- 9002
Part No :- K.07074.281.01 00
Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7001 / GREY PRIMER 30µ 60µ min
TOP COAT Top Coat: RAL 9002 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 27\06\22 27\06\22 27\06\22 30\06\22
2 Start Time-\End Time 12:50 - 17:30 18:50 - 20:15 21:50 - 22:10 11:30 -16:50
3 Drying time given for NOT REQUIRED 10 HRS 06 HRS 24 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY

5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7001 / GREY PRIMER 9006 9002

6 Batch No. NOT REQUIRED


7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 7050 20 80
9 Mean DFT (µm) NOT REQUIRED 60 25 90
10 Max DFT (µm) NOT REQUIRED 70 30 100
11 Final DFT Range NOT REQUIRED 50 - 70 20 - 30 80 -100+
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed

No dust and Blisters No run down / No dust and Blisters


observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 01-07-2022 Date : 01-07-2022 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
14/6/2022

Coating Specification (colour shade )


Coating Inspection Report Paint Cycle
Final Coat RAL 9010
Customer Name :- Toolcon Systems
Part Name :- Round Plate,Robot Riser.
Part No. :-
Surface Preparation Details Surface Rquirement - Shot Blasting SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
Interior Surface Primer Coat: GREY PRIMER 70 100µ
Exterior Surface Top Coat: RAL 9010 20µ NOT REQUIRED

Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 12\06\22 12\06\22 12\06\22 13\06\22
2 Start Time-\End Time 19:00 - 01:30 20:30 - 02:30 20:30 - 02:30 18:00 to 23:50

3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 24 Hrs


individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED 7035 7035 9010
6 Batch No. NOT REQUIRED 880\147 880\147 856\545
7 Coating Manufacturer NOT REQUIRED Shiv Shakti Shiv Shakti Shiv Shakti
8 Min DFT (µm) NOT REQUIRED 70 40 100
9 Mean DFT (µm) NOT REQUIRED 80 45 110
10 Max DFT (µm) NOT REQUIRED 90 50 120
11 Final DFT Range NOT REQUIRED 70 - 90 40 - 50 100 - 120+

SA2.5 No Scales No run down / No run down / Uncover No run down / uncover
12 Visual Inspection and Rust observed Uncover observed observed observed

No dust and Blisters No run down / Uncover No dust and Blisters


observed observed observed

Prepared By : M.I.Ahmed Reviewed By :M.I.Ahmed Approved By :


Sign : Sign : Sign :
Date : 15-08-2021 Date : 15-08-2021 Date :
10
;

PRIVANSA ENGINEERING PRIVATE LIMITED


Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
PRIMER - RAL 7032
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Final
Part Name :- AS PER ANNEXTURE Coat RAL 6034 / 1016
Part No. :-
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 27-Nov-21 27-Nov-21 27-Nov-21 28-Nov-21
2 Start Time-\End Time 19:10 - 22:05 22:10 - 2:10 22:10 - 2:10 16:10 - 22:30
Drying time given for
3 individual coat NOT REQUIRED 10 HRS 10 HRS 12 Hrs

4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY

5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016

6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /


PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 30 30 60
9 Mean DFT (µm) NOT REQUIRED 35 35 65
10 Max DFT (µm) NOT REQUIRED 40 40 70
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 60 - 70
No run down / No run down / Uncover No run down /
12 Visual Inspection SA2.5 No Scales Uncover observed observed uncover observed
and Rust observed

No run down / Uncover


No dust and Blisters observed No dust and Blisters
observed observed

13 Adhesion Cross cut Tape test OK OK OK


Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 28-11-2021 Date : 28-11-2021 Date :
;

PRIVANSA ENGINEERING PRIVATE LIMITED


Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
PRIMER - RAL 7032
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Final
Part Name :- AS PER ANNEXTURE Coat RAL 6034
Part No. :-
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 28-Nov-21 28-Nov-21 28-Nov-21 29-Nov-21
2 Start Time-\End Time 12:10 - 4:05 4:30 - 7:30 22:10 - 2:10 17:10 - 21:10
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY

5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034

6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903


7 Coating Manufacturer 0 PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed

No dust and Blisters No run down / No dust and Blisters


observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 30-11-2021 Date : 30-11-2021 Date :
;

PRIVANSA ENGINEERING PRIVATE LIMITED


Format No. PEPL/QA/01 REV.00
25\06\22

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7035
Customer Name :- TOOLCON SYSTEMS Final
Coat RAL 9010
Part Name :- ROBOT RISER
Invoice No -
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7035 60µ min
TOP COAT Top Coat: RAL 9010 NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 22\06\22 23\06\22 23\06\22 24\06\22
2 Start Time-\End Time 23:50 - 03:20 09:30 - 10:30 11:30 - 12:30 17:10 -19:00
Drying time given for
3 individual coat NOT REQUIRED 10 HRS 10 HRS 12 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7035 7035 9010

6 Batch No. NOT REQUIRED

7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER


8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85+
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 25\06\22 Date : 25\06\22 Date :
;

PRIVANSA ENGINEERING PRIVATE LIMITED


Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
PRIMER - RAL 7032
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Final
Part Name :- AS PER ANNEXTURE Coat RAL 6034 / 1016
Part No. :-
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 29-Nov-21 29-Nov-21 29-Nov-21 30-Nov-21
2 Start Time-\End Time 16:10 - 18:05 18:40 - 20:30 18:40 - 20:30 11:10 - 13:10
Drying time given for
3 individual coat NOT REQUIRED 10 HRS 10 HRS 12 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
Verified with RAL Card Verified with RAL Card Verified with RAL Card
5 Colour NOT REQUIRED 7032 7032 6034 /1016
PC/21221903 /
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221902
7 Coating Manufacturer 0 PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
No run down / No run down / No run down /
12 Visual Inspection SA2.5 No Scales Uncover observed Uncover observed uncover observed
and Rust observed

No run down /
No dust and Blisters Uncover observed No dust and Blisters
observed observed

13 Adhesion Cross cut Tape test OK OK OK


Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 01-12-2021 Date : 01-12-2021 Date :
;

PRIVANSA ENGINEERING PRIVATE LIMITED


Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
PRIMER - RAL 7032
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Final
Part Name :- AS PER ANNEXTURE Coat RAL 6034 / 1016
Invoice No - 1108
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 4-Dec-21 4-Dec-21 4-Dec-21 5-Dec-21
2 Start Time-\End Time 14:10 - 16:05 16:30 - 18:30 16:30 - 18:30 4:10 - 7:10
Drying time given for
3 individual coat NOT REQUIRED 10 HRS 10 HRS 12 Hrs

4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY

5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016

6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /


PC/21221902
7 Coating Manufacturer 0 PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
No run down / No run down / No run down /
12 Visual Inspection SA2.5 No Scales Uncover observed Uncover observed uncover observed
and Rust observed

No dust and Blisters No run down / No dust and Blisters


observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 05-12-2021 Date : 05-12-2021 Date :
;

PRIVANSA ENGINEERING PRIVATE LIMITED


Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1122
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 6-Dec-21 6-Dec-21 6-Dec-21 7-Dec-21
2 Start Time-\End Time 14:50 - 16:20 16:30 - 18:30 16:30 - 18:30 9:10 -14:05
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
PC/21221903 /
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 08-12-2021 Date : 08-12-2021 Date :
;

PRIVANSA ENGINEERING PRIVATE LIMITED


Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1126 , 1127
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 8-Dec-21 8-Dec-21 8-Dec-21 9-Dec-21
2 Start Time-\End Time 15:50 - 16:50 17:10 - 18:30 16:30 - 18:30 10:30 -14:15

3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs


individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /
PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 10-12-2021 Date : 10-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1159 , 1160 , 1161 , 1162 , 1163 .
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 12-Dec-21 12-Dec-21 12-Dec-21 13-Dec-21
2 Start Time-\End Time 12:50 - 15:30 16:20 - 19:30 16:20 - 19:30 12:30 -15:15
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016

6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /


PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 14-12-2021 Date : 14-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1166 , 1167
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 13-Dec-21 13-Dec-21 13-Dec-21 14-Dec-21
2 Start Time-\End Time 14:50 - 17:30 17:40 - 20:30 17:40 - 20:30 12:10 -16:15
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY

5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
PC/21221903 /
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
12 Visual Inspection SA2.5 No Scales No run down / No run down / No run down /
and Rust observed Uncover observed Uncover observed uncover observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 15-12-2021 Date : 15-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1172
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 15-Dec-21 15-Dec-21 15-Dec-21 16-Dec-21
2 Start Time-\End Time 10:50 - 14:30 14:50 - 16:55 14:50 - 16:55 12:10 -16:35
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY

5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016

6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /


PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 17-12-2021 Date : 17-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Coat RAL 6034 / 1016
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD.
Part Name :- AS PER ANNEXTURE
Invoice No - 1173 , 1178
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 16-Dec-21 16-Dec-21 16-Dec-21 17-Dec-21
2 Start Time-\End Time 12:50 - 14:30 14:50 - 15:55 14:50 - 15:55 12:30 -16:50

3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs


individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016 /
PC/21221903
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904
PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 18-12-2021 Date : 18-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/06 REV.00
12-Jun-22

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - 7001
Final Coat
RAL - 9018
Customer Name :- thyssenkrupp
Part No :- H.20454.671.50.00
Invoice No - 2022-23\0093
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: GREY 60µ 100µ min
TOP COAT Top Coat: RAL 9018 60µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 10\06\22 10\06\22 10\06\22 10\06\22
2 Start Time-\End Time 10:00 - 10:40 11.00: - 12:30 11.00: - 11:30 19:00 -20:30
3 Drying time given for NOT REQUIRED 10 HRS 24 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY

5 Colour NOT REQUIRED Verified with RAL 7001 Verified with RAL 7001 Verified with RAL Card
9018

6 Batch No. NOT REQUIRED


7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 40 80
9 Mean DFT (µm) NOT REQUIRED 45 90
10 Max DFT (µm) NOT REQUIRED 50 100
11 Final DFT Range NOT REQUIRED 40 - 50 80 - 100+
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : M.I.AHMED Reviewed By : M.I.AHMED Approved By :
Sign : Sign : Sign :
Date : 12-06-2022 Date : 12-06-2022 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
26-Jun-22

Coating Specification (colour


shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7001 / GREY
PRIMER
Customer Name :- SHIDHIGIRI ENGINEERING. Final Coat RAL
Part Name :- 9001
Part No :- V.06929.311.01,V.06929.306.21,V.06929.306.01,V.06929.302.15,
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7001 / GREY PRIMER 30µ 60µ min
TOP COAT Top Coat: RAL 9001 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 19-Dec-21 19-Dec-21 20-Dec-21
2 Start Time-\End Time 12:50 - 17:30 18:50 - 22:55 18:50 - 22:55 11:30 -16:50
3 Drying time given for NOT REQUIRED 10 HRS 06 HRS 24 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY

5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7001 / GREY PRIMER 9006 9001

6 Batch No. NOT REQUIRED


7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 50 30 100
9 Mean DFT (µm) NOT REQUIRED 60 35 110
10 Max DFT (µm) NOT REQUIRED 70 40 120
11 Final DFT Range NOT REQUIRED 50 - 70 30 - 40 100 -120+
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed

No dust and Blisters No run down / No dust and Blisters


observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 27-06-2022 Date : 27-06-2022 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. PRIMER - GREY PRIMER
Part Name :- AS PER ANNEXTURE
Final Coat RAL 2009 / 9010 /
Invoice No - 1249 1023 .
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: GREY PRIMER 30µ 60µ min
TOP COAT Top Coat: RAL 2009 / 9010 / 1023 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 24-Dec-21 24-Dec-21 N/A 26-Dec-21
2 Start Time-\End Time 17:50 - 21:30 20:40 - 22:55 N/A 11:35 -15:40

3 Drying time given for NOT REQUIRED 10 HRS N/A 12 Hrs


individual coat
4 Drying method followed NOT REQUIRED AIR DRY N/A AIR DRY

5 Colour NOT REQUIRED GREY PRIMER N/A Verified with RAL Card
2009 /9010 /1023
6 Batch No. NOT REQUIRED N/A
7 Coating Manufacturer NOT REQUIRED PIONEER N/A PIONEER
8 Min DFT (µm) NOT REQUIRED 35 N/A 65
9 Mean DFT (µm) NOT REQUIRED 40 N/A 75
10 Max DFT (µm) NOT REQUIRED 45 N/A 85
11 Final DFT Range NOT REQUIRED 30 - 40 N/A 65 - 85
SA2.5 No Scales No run down / N/A No run down /
12 Visual Inspection and Rust observed Uncover observed uncover observed

No dust and Blisters N/A No dust and Blisters


observed observed
13 Adhesion Cross cut Tape test OK N/A OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 28-12-2021 Date : 28-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
28\06\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- CHALLENGER SWEEPER PVT LTD. PRIMER - GREY
Part Name :- WLDMNT SCISSOR. Final Coat RAL 9005
PART NO -155748,155749,204486,204487,204488.
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: RAL 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Sealant Top Coat
1 Date 26\07\22 26\07\22 27\06\22 27\07\22
2 Start Time-\End Time 09:00 - 11:20 12:00 - 13:00 08:30 - 09:00 17:00 - 14:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED Grey ESSR BOND ACR250 9005

6 Batch No. NOT REQUIRED Q0D2158011 Q0D1281075

7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble


8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 28\06\22 Date : 28\06\22 Date :
Sr discripyion tag
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
10\07\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- BIJU INDUSTRIES PRIMER - GREY
Part Name :- M S TANK Final Coat IS 632
PART NO -
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: IS 632 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 06\07\22 06\07\22 07\06\22 08\07\22
2 Start Time-\End Time 09:00 - 11:20 12:00 - 14:00 01:30 - 03:00 11:00 - 14:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED Grey IS 632

6 Batch No. NOT REQUIRED 674 TCG\04\22\178

7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble


8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 10\07\22 Date : 10\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
20\07\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- SHIDHI GIRI ENGINEERING. PRIMER - RED
Part :- CO1134614-00,COA1134616-00,COA1134617-00,COA1134631,COA1134632,COA1134633,COA1134649 Final Coat 1013
COA1134659,COA2030097,COA2030099,COA2030102,COA2030104,COA2030107,COA3165716,COA3165717
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 90µ 200-270 µ min
TOP COAT Primer2ND Coat: 90µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 04\07\22 05\07\22 15\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED RED 1013

6 Batch No. NOT REQUIRED 2831826-1 2837241

7 Coating Manufacturer NOT REQUIRED JOTUN JOTUN


8 Min DFT (µm) NOT REQUIRED 170 220
9 Mean DFT (µm) NOT REQUIRED 180 250
10 Max DFT (µm) NOT REQUIRED 190 270
11 Final DFT Range NOT REQUIRED 170-190 220-270
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 20\07\22 Date : 20\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
26\07\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- ABHI TECH FAB & MACHINING PRIMER - GREY
Part No :- K.00132.195.01.00,K.00132.198.01.00 Final Coat 9002 & 9006

Surface Preparation Details Surface Rquirement - SA 2.5


Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 10\07\22 22\07\22 22\07\22 23\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED GREY 9002

6 Batch No. NOT REQUIRED

7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER


8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50-60 80-100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 26\07\22 Date : 26\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
14\08\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- THYSSEN KRUPP PRIMER - 7032
Part No :- H.30606.131.70.215,H.30606.131.70.223,H.30606.131.70.226, As per challan. Final Coat - 9002

Surface Preparation Details Surface Rquirement - SA 2.5


Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 28\7\2022 11\08\22 11\08\22 13\08\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 13:10 - 15:30
Drying time given for
3 individual coat NOT REQUIRED 12 Hrs 12 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED 7032 7032 9002

6 Batch No. NOT REQUIRED PC/22231004 PC/22231004 PC/22231207

7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER


8 Min DFT (µm) NOT REQUIRED 50 50 80
9 Mean DFT (µm) NOT REQUIRED 55 55 90
10 Max DFT (µm) NOT REQUIRED 60 60 100
11 Final DFT Range NOT REQUIRED 50-60 50-60 80-100
SA2.5 No Scales No run down /
12 Visual Inspection Uncover observed OK OK
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 14\08\22 Date : 14\08\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
31\07\22

Surface Rquirement -
Coating Inspection Report Paint Details
Primer Coat:-RAL-
7035 Top
COSTUMER NAME-HAOSEN AUTOMATION PVT LTD Coat: -RAL-1004 &9002

Part No :-HTEE122241.101.2034 & 101.2033 & 375.3013


Surface Preparation Details Surface Rquirement - BLASTING SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: -RAL-7035 Shivshakti 120µ
TOP COAT Top Coat: -RAL-1004 & 9002 40µ
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 13/12/2023 13/12/2023 14/12/2023
2 Start Time-\End Time 8:30AM-9:30AM 12:00PM-2:00PM 10:00AM-3:00PM
Drying time given for
3 individual coat Not Required 12HRS 12HRS

4 Drying method followed Not Required AIR DRY AIR DRY

5 Colour Not Required RAL-7035 RAL-1004&9002

6 Batch No. Not Required 2879/147 3069/1008

7 Coating Manufacturer Not Required SHIVSHAKTI SHIVSHAKTI


8 Min DFT (µm) Not Required 40µ 80µ
9 Mean DFT (µm) Not Required 50µ 90µ
10 Max DFT (µm) Not Required 60µ 100µ
11 Final DFT Range Not Required 40-60µ 80-100µ

12 Visual Inspection OK OK OK OK

13 Adhesion Cross cut Tape test


Prepared By : ROHIT PATEL Reviewed By : ROHIT PATEL Approved By :

Sign : Sign : Sign :

Date : 15/12/2023 Date : 15/12/2023 Date :


PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
18\08\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- THYSENN KRUPP PRIMER - 7032
Part No :- H.30606.131.70.215,H.30606.131.70.223,H.30606.131.70.226, As per challan. Final Coat - Not requird

Surface Preparation Details Surface Rquirement - SA 2.5


Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 28\7\2022 18\08\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30
Drying time given for
3 individual coat NOT REQUIRED 12 Hrs
4 Drying method followed NOT REQUIRED AIR DRY NOT REQUIRED NOT REQUIRED

5 Colour NOT REQUIRED 7032 NOT REQUIRED NOT REQUIRED

6 Batch No. NOT REQUIRED PC/22231004 NOT REQUIRED NOT REQUIRED

7 Coating Manufacturer NOT REQUIRED PIONEER NOT REQUIRED NOT REQUIRED


8 Min DFT (µm) NOT REQUIRED 50 NOT REQUIRED NOT REQUIRED
9 Mean DFT (µm) NOT REQUIRED 55 NOT REQUIRED NOT REQUIRED
10 Max DFT (µm) NOT REQUIRED 60 NOT REQUIRED NOT REQUIRED
11 Final DFT Range NOT REQUIRED 50-60 NOT REQUIRED NOT REQUIRED
SA2.5 No Scales No run down /
12 Visual Inspection Uncover observed OK
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 18\08\22 Date : 18\08\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
14\08\22

Coating Specification (colour


Coating Inspection Report shade )
Paint Cycle
Customer Name :- THYSSEN KRUPP PRIMER - 7032
Part No :- H.30606.131.70.215,H.30606.131.70.223,H.30606.131.70.226, As per challan. Final Coat - 9002

Surface Preparation Details Surface Rquirement - SA 2.5


Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 28\7\2022 11\08\22 11\08\22 13\08\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 13:10 - 15:30
Drying time given for
3 individual coat NOT REQUIRED 12 Hrs 12 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY

5 Colour NOT REQUIRED 7032 7032 9002

6 Batch No. NOT REQUIRED PC/22231004 PC/22231004 PC/22231207

7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER


8 Min DFT (µm) NOT REQUIRED 50 50 80
9 Mean DFT (µm) NOT REQUIRED 55 55 90
10 Max DFT (µm) NOT REQUIRED 60 60 100
11 Final DFT Range NOT REQUIRED 50-60 50-60 80-100
SA2.5 No Scales No run down /
12 Visual Inspection Uncover observed OK OK
and Rust ob

13 Adhesion Cross cut Tape test

Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :


Sign : Sign : Sign :
Date : 14\08\22 Date : 14\08\22 Date :