PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
26\07\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- ABHI TECH FAB & MACHINING PRIMER - GREY
Part No :- K.00132.195.01.00,K.00132.198.01.00 Final Coat 9002 & 9006
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 10\07\22 22\07\22 22\07\22 23\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED GREY 9002
6 Batch No. NOT REQUIRED
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50-60 80-100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 26\07\22 Date : 26\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
20\07\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- SHIDHI GIRI ENGINEERING. PRIMER - RED
Part No :- COA3165719,COA5019131,COA5019132. Final Coat 1013
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 90µ 200-270 µ min
TOP COAT Primer2ND Coat: 90µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 04\07\22 05\07\22 15\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED RED 1013
6 Batch No. NOT REQUIRED 2831826-1 2837241
7 Coating Manufacturer NOT REQUIRED JOTUN JOTUN
8 Min DFT (µm) NOT REQUIRED 170 220
9 Mean DFT (µm) NOT REQUIRED 180 250
10 Max DFT (µm) NOT REQUIRED 190 270
11 Final DFT Range NOT REQUIRED 170-190 220-270
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 20\07\22 Date : 20\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
26\07\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- ABHI TECH FAB & MACHINING PRIMER - GREY
Part No :- K.00132.195.01.00,K.00132.198.01.00 Final Coat 9002 & 9006
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 10\07\22 22\07\22 22\07\22 23\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED GREY 9002
6 Batch No. NOT REQUIRED
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50-60 80-100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 26\07\22 Date : 26\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
12\07\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- SAMARTH TECHNOCRAT PRIMER - GREY
Part Name :- M S TANK Final Coat IS 631
PART NO - ADA-1722034-02 , ADA-1722035-02
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: IS 631 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 07\06\22 08\06\22 09\06\22 11\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 00:30 - 03:00 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED Grey IS 632
6 Batch No. NOT REQUIRED 674 TCG\05\22\182
7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble
8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 12\07\22 Date : 12\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
03\07\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- BIJU INDUSTRIES PRIMER - GREY
Part Name :- M S TANK Final Coat IS 632
PART NO -
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: IS 632 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 28\06\22 29\06\22 30\06\22 02\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 13:30 01:00 - 03:00 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED Grey IS 632
6 Batch No. NOT REQUIRED 674 TCG\04\22\178
7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble
8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 03\07\22 Date : 03\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
6\07\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- BIJU INDUSTRIES PRIMER - GREY
Part Name :- M S TANK Final Coat IS 632
PART NO -
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: IS 632 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 02\07\22 03\07\22 04\06\22 05\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 13:30 01:00 - 03:00 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED Grey IS 632
6 Batch No. NOT REQUIRED 674 TCG\04\22\178
7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble
8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 06\07\22 Date : 06\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
1-Jul-22
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7001 / GREY
PRIMER
Customer Name :- ABHITECH Final Coat RAL
Part Name :- 9002
Part No :- K.07074.281.01 00
Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7001 / GREY PRIMER 30µ 60µ min
TOP COAT Top Coat: RAL 9002 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 27\06\22 27\06\22 27\06\22 30\06\22
2 Start Time-\End Time 12:50 - 17:30 18:50 - 20:15 21:50 - 22:10 11:30 -16:50
3 Drying time given for NOT REQUIRED 10 HRS 06 HRS 24 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7001 / GREY PRIMER 9006 9002
6 Batch No. NOT REQUIRED
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 7050 20 80
9 Mean DFT (µm) NOT REQUIRED 60 25 90
10 Max DFT (µm) NOT REQUIRED 70 30 100
11 Final DFT Range NOT REQUIRED 50 - 70 20 - 30 80 -100+
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 01-07-2022 Date : 01-07-2022 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
14/6/2022
Coating Specification (colour shade )
Coating Inspection Report Paint Cycle
Final Coat RAL 9010
Customer Name :- Toolcon Systems
Part Name :- Round Plate,Robot Riser.
Part No. :-
Surface Preparation Details Surface Rquirement - Shot Blasting SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
Interior Surface Primer Coat: GREY PRIMER 70 100µ
Exterior Surface Top Coat: RAL 9010 20µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 12\06\22 12\06\22 12\06\22 13\06\22
2 Start Time-\End Time 19:00 - 01:30 20:30 - 02:30 20:30 - 02:30 18:00 to 23:50
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 24 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED 7035 7035 9010
6 Batch No. NOT REQUIRED 880\147 880\147 856\545
7 Coating Manufacturer NOT REQUIRED Shiv Shakti Shiv Shakti Shiv Shakti
8 Min DFT (µm) NOT REQUIRED 70 40 100
9 Mean DFT (µm) NOT REQUIRED 80 45 110
10 Max DFT (µm) NOT REQUIRED 90 50 120
11 Final DFT Range NOT REQUIRED 70 - 90 40 - 50 100 - 120+
SA2.5 No Scales No run down / No run down / Uncover No run down / uncover
12 Visual Inspection and Rust observed Uncover observed observed observed
No dust and Blisters No run down / Uncover No dust and Blisters
observed observed observed
Prepared By : M.I.Ahmed Reviewed By :M.I.Ahmed Approved By :
Sign : Sign : Sign :
Date : 15-08-2021 Date : 15-08-2021 Date :
10
;
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
PRIMER - RAL 7032
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Final
Part Name :- AS PER ANNEXTURE Coat RAL 6034 / 1016
Part No. :-
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 27-Nov-21 27-Nov-21 27-Nov-21 28-Nov-21
2 Start Time-\End Time 19:10 - 22:05 22:10 - 2:10 22:10 - 2:10 16:10 - 22:30
Drying time given for
3 individual coat NOT REQUIRED 10 HRS 10 HRS 12 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /
PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 30 30 60
9 Mean DFT (µm) NOT REQUIRED 35 35 65
10 Max DFT (µm) NOT REQUIRED 40 40 70
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 60 - 70
No run down / No run down / Uncover No run down /
12 Visual Inspection SA2.5 No Scales Uncover observed observed uncover observed
and Rust observed
No run down / Uncover
No dust and Blisters observed No dust and Blisters
observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 28-11-2021 Date : 28-11-2021 Date :
;
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
PRIMER - RAL 7032
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Final
Part Name :- AS PER ANNEXTURE Coat RAL 6034
Part No. :-
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 28-Nov-21 28-Nov-21 28-Nov-21 29-Nov-21
2 Start Time-\End Time 12:10 - 4:05 4:30 - 7:30 22:10 - 2:10 17:10 - 21:10
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903
7 Coating Manufacturer 0 PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 30-11-2021 Date : 30-11-2021 Date :
;
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
25\06\22
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7035
Customer Name :- TOOLCON SYSTEMS Final
Coat RAL 9010
Part Name :- ROBOT RISER
Invoice No -
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7035 60µ min
TOP COAT Top Coat: RAL 9010 NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 22\06\22 23\06\22 23\06\22 24\06\22
2 Start Time-\End Time 23:50 - 03:20 09:30 - 10:30 11:30 - 12:30 17:10 -19:00
Drying time given for
3 individual coat NOT REQUIRED 10 HRS 10 HRS 12 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7035 7035 9010
6 Batch No. NOT REQUIRED
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85+
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 25\06\22 Date : 25\06\22 Date :
;
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
PRIMER - RAL 7032
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Final
Part Name :- AS PER ANNEXTURE Coat RAL 6034 / 1016
Part No. :-
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 29-Nov-21 29-Nov-21 29-Nov-21 30-Nov-21
2 Start Time-\End Time 16:10 - 18:05 18:40 - 20:30 18:40 - 20:30 11:10 - 13:10
Drying time given for
3 individual coat NOT REQUIRED 10 HRS 10 HRS 12 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
Verified with RAL Card Verified with RAL Card Verified with RAL Card
5 Colour NOT REQUIRED 7032 7032 6034 /1016
PC/21221903 /
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221902
7 Coating Manufacturer 0 PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
No run down / No run down / No run down /
12 Visual Inspection SA2.5 No Scales Uncover observed Uncover observed uncover observed
and Rust observed
No run down /
No dust and Blisters Uncover observed No dust and Blisters
observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 01-12-2021 Date : 01-12-2021 Date :
;
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
PRIMER - RAL 7032
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Final
Part Name :- AS PER ANNEXTURE Coat RAL 6034 / 1016
Invoice No - 1108
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 4-Dec-21 4-Dec-21 4-Dec-21 5-Dec-21
2 Start Time-\End Time 14:10 - 16:05 16:30 - 18:30 16:30 - 18:30 4:10 - 7:10
Drying time given for
3 individual coat NOT REQUIRED 10 HRS 10 HRS 12 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /
PC/21221902
7 Coating Manufacturer 0 PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
No run down / No run down / No run down /
12 Visual Inspection SA2.5 No Scales Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 05-12-2021 Date : 05-12-2021 Date :
;
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1122
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 6-Dec-21 6-Dec-21 6-Dec-21 7-Dec-21
2 Start Time-\End Time 14:50 - 16:20 16:30 - 18:30 16:30 - 18:30 9:10 -14:05
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
PC/21221903 /
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 08-12-2021 Date : 08-12-2021 Date :
;
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1126 , 1127
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 8-Dec-21 8-Dec-21 8-Dec-21 9-Dec-21
2 Start Time-\End Time 15:50 - 16:50 17:10 - 18:30 16:30 - 18:30 10:30 -14:15
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /
PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 10-12-2021 Date : 10-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1159 , 1160 , 1161 , 1162 , 1163 .
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 12-Dec-21 12-Dec-21 12-Dec-21 13-Dec-21
2 Start Time-\End Time 12:50 - 15:30 16:20 - 19:30 16:20 - 19:30 12:30 -15:15
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /
PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 14-12-2021 Date : 14-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1166 , 1167
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 13-Dec-21 13-Dec-21 13-Dec-21 14-Dec-21
2 Start Time-\End Time 14:50 - 17:30 17:40 - 20:30 17:40 - 20:30 12:10 -16:15
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
PC/21221903 /
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
12 Visual Inspection SA2.5 No Scales No run down / No run down / No run down /
and Rust observed Uncover observed Uncover observed uncover observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 15-12-2021 Date : 15-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. Coat RAL 6034 / 1016
Part Name :- AS PER ANNEXTURE
Invoice No - 1172
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 15-Dec-21 15-Dec-21 15-Dec-21 16-Dec-21
2 Start Time-\End Time 10:50 - 14:30 14:50 - 16:55 14:50 - 16:55 12:10 -16:35
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904 PC/21221903 /
PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 17-12-2021 Date : 17-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7032
Final
Coat RAL 6034 / 1016
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD.
Part Name :- AS PER ANNEXTURE
Invoice No - 1173 , 1178
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7032 30µ 60µ min
TOP COAT Top Coat: RAL 6034 /1016 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 16-Dec-21 16-Dec-21 16-Dec-21 17-Dec-21
2 Start Time-\End Time 12:50 - 14:30 14:50 - 15:55 14:50 - 15:55 12:30 -16:50
3 Drying time given for NOT REQUIRED 10 HRS 10 HRS 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7032 7032 6034 /1016 /
PC/21221903
6 Batch No. NOT REQUIRED PC/21221904 PC/21221904
PC/21221902
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 35 30 65
9 Mean DFT (µm) NOT REQUIRED 40 35 75
10 Max DFT (µm) NOT REQUIRED 45 40 85
11 Final DFT Range NOT REQUIRED 30 - 40 30 - 40 65 - 85
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 18-12-2021 Date : 18-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/06 REV.00
12-Jun-22
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - 7001
Final Coat
RAL - 9018
Customer Name :- thyssenkrupp
Part No :- H.20454.671.50.00
Invoice No - 2022-23\0093
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: GREY 60µ 100µ min
TOP COAT Top Coat: RAL 9018 60µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 10\06\22 10\06\22 10\06\22 10\06\22
2 Start Time-\End Time 10:00 - 10:40 11.00: - 12:30 11.00: - 11:30 19:00 -20:30
3 Drying time given for NOT REQUIRED 10 HRS 24 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL 7001 Verified with RAL 7001 Verified with RAL Card
9018
6 Batch No. NOT REQUIRED
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 40 80
9 Mean DFT (µm) NOT REQUIRED 45 90
10 Max DFT (µm) NOT REQUIRED 50 100
11 Final DFT Range NOT REQUIRED 40 - 50 80 - 100+
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : M.I.AHMED Reviewed By : M.I.AHMED Approved By :
Sign : Sign : Sign :
Date : 12-06-2022 Date : 12-06-2022 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
26-Jun-22
Coating Specification (colour
shade )
Coating Inspection Report Paint Cycle
PRIMER - RAL 7001 / GREY
PRIMER
Customer Name :- SHIDHIGIRI ENGINEERING. Final Coat RAL
Part Name :- 9001
Part No :- V.06929.311.01,V.06929.306.21,V.06929.306.01,V.06929.302.15,
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: RAL 7001 / GREY PRIMER 30µ 60µ min
TOP COAT Top Coat: RAL 9001 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 19-Dec-21 19-Dec-21 20-Dec-21
2 Start Time-\End Time 12:50 - 17:30 18:50 - 22:55 18:50 - 22:55 11:30 -16:50
3 Drying time given for NOT REQUIRED 10 HRS 06 HRS 24 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY AIR DRY
5 Colour NOT REQUIRED Verified with RAL Card Verified with RAL Card Verified with RAL Card
7001 / GREY PRIMER 9006 9001
6 Batch No. NOT REQUIRED
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 50 30 100
9 Mean DFT (µm) NOT REQUIRED 60 35 110
10 Max DFT (µm) NOT REQUIRED 70 40 120
11 Final DFT Range NOT REQUIRED 50 - 70 30 - 40 100 -120+
SA2.5 No Scales No run down / No run down / No run down /
12 Visual Inspection Uncover observed Uncover observed uncover observed
and Rust observed
No dust and Blisters No run down / No dust and Blisters
observed Uncover observed observed
13 Adhesion Cross cut Tape test OK OK OK
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 27-06-2022 Date : 27-06-2022 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
21-Jun-19
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- THYSSENKRUPP SYSTEM ENGINEERING INDIA PVT . LTD. PRIMER - GREY PRIMER
Part Name :- AS PER ANNEXTURE
Final Coat RAL 2009 / 9010 /
Invoice No - 1249 1023 .
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: GREY PRIMER 30µ 60µ min
TOP COAT Top Coat: RAL 2009 / 9010 / 1023 30µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat MACHING AREA PRIMER Top Coat
1 Date 24-Dec-21 24-Dec-21 N/A 26-Dec-21
2 Start Time-\End Time 17:50 - 21:30 20:40 - 22:55 N/A 11:35 -15:40
3 Drying time given for NOT REQUIRED 10 HRS N/A 12 Hrs
individual coat
4 Drying method followed NOT REQUIRED AIR DRY N/A AIR DRY
5 Colour NOT REQUIRED GREY PRIMER N/A Verified with RAL Card
2009 /9010 /1023
6 Batch No. NOT REQUIRED N/A
7 Coating Manufacturer NOT REQUIRED PIONEER N/A PIONEER
8 Min DFT (µm) NOT REQUIRED 35 N/A 65
9 Mean DFT (µm) NOT REQUIRED 40 N/A 75
10 Max DFT (µm) NOT REQUIRED 45 N/A 85
11 Final DFT Range NOT REQUIRED 30 - 40 N/A 65 - 85
SA2.5 No Scales No run down / N/A No run down /
12 Visual Inspection and Rust observed Uncover observed uncover observed
No dust and Blisters N/A No dust and Blisters
observed observed
13 Adhesion Cross cut Tape test OK N/A OK
Prepared By : Rishikesh Yadav Reviewed By : Rishikesh Yadav Approved By :
Sign : Sign : Sign :
Date : 28-12-2021 Date : 28-12-2021 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
28\06\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- CHALLENGER SWEEPER PVT LTD. PRIMER - GREY
Part Name :- WLDMNT SCISSOR. Final Coat RAL 9005
PART NO -155748,155749,204486,204487,204488.
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: RAL 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Sealant Top Coat
1 Date 26\07\22 26\07\22 27\06\22 27\07\22
2 Start Time-\End Time 09:00 - 11:20 12:00 - 13:00 08:30 - 09:00 17:00 - 14:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED Grey ESSR BOND ACR250 9005
6 Batch No. NOT REQUIRED Q0D2158011 Q0D1281075
7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble
8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 28\06\22 Date : 28\06\22 Date :
Sr discripyion tag
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
10\07\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- BIJU INDUSTRIES PRIMER - GREY
Part Name :- M S TANK Final Coat IS 632
PART NO -
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 µ 100 µ min
TOP COAT Top Coat: IS 632 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 06\07\22 06\07\22 07\06\22 08\07\22
2 Start Time-\End Time 09:00 - 11:20 12:00 - 14:00 01:30 - 03:00 11:00 - 14:00
Drying time given for
3 individual coat NOT REQUIRED 10 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED Grey IS 632
6 Batch No. NOT REQUIRED 674 TCG\04\22\178
7 Coating Manufacturer NOT REQUIRED AkzaNoble AkzaNoble
8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50 - 60 80 - 100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 10\07\22 Date : 10\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
20\07\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- SHIDHI GIRI ENGINEERING. PRIMER - RED
Part :- CO1134614-00,COA1134616-00,COA1134617-00,COA1134631,COA1134632,COA1134633,COA1134649 Final Coat 1013
COA1134659,COA2030097,COA2030099,COA2030102,COA2030104,COA2030107,COA3165716,COA3165717
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 90µ 200-270 µ min
TOP COAT Primer2ND Coat: 90µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Putty Top Coat
1 Date 04\07\22 05\07\22 15\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED RED 1013
6 Batch No. NOT REQUIRED 2831826-1 2837241
7 Coating Manufacturer NOT REQUIRED JOTUN JOTUN
8 Min DFT (µm) NOT REQUIRED 170 220
9 Mean DFT (µm) NOT REQUIRED 180 250
10 Max DFT (µm) NOT REQUIRED 190 270
11 Final DFT Range NOT REQUIRED 170-190 220-270
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 20\07\22 Date : 20\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
26\07\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- ABHI TECH FAB & MACHINING PRIMER - GREY
Part No :- K.00132.195.01.00,K.00132.198.01.00 Final Coat 9002 & 9006
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 10\07\22 22\07\22 22\07\22 23\07\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 11:00 - 13:00
Drying time given for
3 individual coat NOT REQUIRED 24 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED GREY 9002
6 Batch No. NOT REQUIRED
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 50 80
9 Mean DFT (µm) NOT REQUIRED 55 90
10 Max DFT (µm) NOT REQUIRED 60 100
11 Final DFT Range NOT REQUIRED 50-60 80-100
SA2.5 No Scales No run down / No run down /
12 Visual Inspection Uncover observed OK uncover observed
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 26\07\22 Date : 26\07\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
14\08\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- THYSSEN KRUPP PRIMER - 7032
Part No :- H.30606.131.70.215,H.30606.131.70.223,H.30606.131.70.226, As per challan. Final Coat - 9002
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 28\7\2022 11\08\22 11\08\22 13\08\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 13:10 - 15:30
Drying time given for
3 individual coat NOT REQUIRED 12 Hrs 12 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED 7032 7032 9002
6 Batch No. NOT REQUIRED PC/22231004 PC/22231004 PC/22231207
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 50 50 80
9 Mean DFT (µm) NOT REQUIRED 55 55 90
10 Max DFT (µm) NOT REQUIRED 60 60 100
11 Final DFT Range NOT REQUIRED 50-60 50-60 80-100
SA2.5 No Scales No run down /
12 Visual Inspection Uncover observed OK OK
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 14\08\22 Date : 14\08\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
31\07\22
Surface Rquirement -
Coating Inspection Report Paint Details
Primer Coat:-RAL-
7035 Top
COSTUMER NAME-HAOSEN AUTOMATION PVT LTD Coat: -RAL-1004 &9002
Part No :-HTEE122241.101.2034 & 101.2033 & 375.3013
Surface Preparation Details Surface Rquirement - BLASTING SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: -RAL-7035 Shivshakti 120µ
TOP COAT Top Coat: -RAL-1004 & 9002 40µ
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 13/12/2023 13/12/2023 14/12/2023
2 Start Time-\End Time 8:30AM-9:30AM 12:00PM-2:00PM 10:00AM-3:00PM
Drying time given for
3 individual coat Not Required 12HRS 12HRS
4 Drying method followed Not Required AIR DRY AIR DRY
5 Colour Not Required RAL-7035 RAL-1004&9002
6 Batch No. Not Required 2879/147 3069/1008
7 Coating Manufacturer Not Required SHIVSHAKTI SHIVSHAKTI
8 Min DFT (µm) Not Required 40µ 80µ
9 Mean DFT (µm) Not Required 50µ 90µ
10 Max DFT (µm) Not Required 60µ 100µ
11 Final DFT Range Not Required 40-60µ 80-100µ
12 Visual Inspection OK OK OK OK
13 Adhesion Cross cut Tape test
Prepared By : ROHIT PATEL Reviewed By : ROHIT PATEL Approved By :
Sign : Sign : Sign :
Date : 15/12/2023 Date : 15/12/2023 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
18\08\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- THYSENN KRUPP PRIMER - 7032
Part No :- H.30606.131.70.215,H.30606.131.70.223,H.30606.131.70.226, As per challan. Final Coat - Not requird
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 28\7\2022 18\08\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30
Drying time given for
3 individual coat NOT REQUIRED 12 Hrs
4 Drying method followed NOT REQUIRED AIR DRY NOT REQUIRED NOT REQUIRED
5 Colour NOT REQUIRED 7032 NOT REQUIRED NOT REQUIRED
6 Batch No. NOT REQUIRED PC/22231004 NOT REQUIRED NOT REQUIRED
7 Coating Manufacturer NOT REQUIRED PIONEER NOT REQUIRED NOT REQUIRED
8 Min DFT (µm) NOT REQUIRED 50 NOT REQUIRED NOT REQUIRED
9 Mean DFT (µm) NOT REQUIRED 55 NOT REQUIRED NOT REQUIRED
10 Max DFT (µm) NOT REQUIRED 60 NOT REQUIRED NOT REQUIRED
11 Final DFT Range NOT REQUIRED 50-60 NOT REQUIRED NOT REQUIRED
SA2.5 No Scales No run down /
12 Visual Inspection Uncover observed OK
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 18\08\22 Date : 18\08\22 Date :
PRIVANSA ENGINEERING PRIVATE LIMITED
Format No. PEPL/QA/01 REV.00
14\08\22
Coating Specification (colour
Coating Inspection Report shade )
Paint Cycle
Customer Name :- THYSSEN KRUPP PRIMER - 7032
Part No :- H.30606.131.70.215,H.30606.131.70.223,H.30606.131.70.226, As per challan. Final Coat - 9002
Surface Preparation Details Surface Rquirement - SA 2.5
Painting Scheme Paint Details Individual DFT FINAL DFT
PRIMER Primer Coat: 60 100+ µ min
TOP COAT Top Coat: 40µ NOT REQUIRED
Sr. No. Parameters Blasting Primer coat Machining Top Coat
1 Date 28\7\2022 11\08\22 11\08\22 13\08\22
2 Start Time-\End Time 09:10 - 11:20 11:00 - 14:30 11:00 - 14:30 13:10 - 15:30
Drying time given for
3 individual coat NOT REQUIRED 12 Hrs 12 Hrs 24 Hrs
4 Drying method followed NOT REQUIRED AIR DRY AIR DRY
5 Colour NOT REQUIRED 7032 7032 9002
6 Batch No. NOT REQUIRED PC/22231004 PC/22231004 PC/22231207
7 Coating Manufacturer NOT REQUIRED PIONEER PIONEER PIONEER
8 Min DFT (µm) NOT REQUIRED 50 50 80
9 Mean DFT (µm) NOT REQUIRED 55 55 90
10 Max DFT (µm) NOT REQUIRED 60 60 100
11 Final DFT Range NOT REQUIRED 50-60 50-60 80-100
SA2.5 No Scales No run down /
12 Visual Inspection Uncover observed OK OK
and Rust ob
13 Adhesion Cross cut Tape test
Prepared By : M I AHMED Reviewed By : M I AHMED Approved By :
Sign : Sign : Sign :
Date : 14\08\22 Date : 14\08\22 Date :