Product Backlog, Sprint Schedule, and Estimation

Sprint Functional User User Story / Task Story Points Priority Team
Requirement Story Members
(Epic) Number
Sprint-1 Authentication and US001 As a user, I want to be able to log in 5 High Mahiyah &
Authorization securely Yasmine
Sprint-1 Authentication and US002 As an admin, I want to manage user roles 5 Medium Mahiyah &
Authorization and permissions Yasmine
Sprint-2 Dashboard Design US003 As a user, I want an intuitive dashboard 10 High Mahiyah &
and Layout layout Yasmine
Sprint-2 Storyboard US004 As a user, I want customizable widgets on 10 Medium Mahiyah &
the Storyboard Yasmine
Sprint-2 Data Integration US005 As a user, I want the system to integrate 10 High Mahiyah &
with external APIs Yasmine
Sprint-1 Data Integration US006 As a user, I want to import data from CSV 10 Medium Mahiyah &
files Yasmine
Sprint-1 Performance US007 As a user, I want the application to load 10 Medium Mahiyah &
Optimization quickly and I want to see real-time updates on Yasmine
the dashboard
Project Tracker, Velocity & Burn down Chart:

Sprint Total Story Duration Sprint Start Date Sprint End Date Story Points Sprint Release Date
Points (Planned) Completed (as on (Actual)
Planned End Date)
Sprint-1 30 6 Days 23-10-2023 29-110-2023 30 24-10-2023
Sprint-2 30 6 Days 28-10-2023 4-11-2023 30 30-10-2023

Velocity: Imagine we have a 10-day sprint duration, and the velocity of the team is 20 (points per sprint). Let’s calculate
the team’s average velocity (AV) per iteration unit (story points per day)

AV = (30/6+30/6) = 10