C2 of EW project

Last update on 07 March 2019

NATO UNCLASSIFIED
C2 of EW

C2 of EW is a project part of a larger


Capability Package (CP9C0107) that is CP 9C0107
Functional Services
intended to provide C2 systems for NATO for C2 of Operations
static and deployed HQs.

The EW package (Project 0IS03083) is


one of 16 packages in the overall project.

The project is described as incremental


in nature.

NEDB-NG is the first increment

C2 of EW Functional Services to be
implemented as Addendum to the larger
CP (additional Increments)

NATO UNCLASSIFIED
Project team

ROLE RESPONSIBLE
CAPCO SACT Supported by
MISPO ACT/SEE NATO Electronic Warfare Working
OCO SHAPE/JEWCS Group as tasked by
NEWAC
HN NCIA (proposed)

Responsibilities detailed in
Bi SC Capability package directive 085-001

CAPCO - Capability Coordinator


MISPO - Mission Sponsor
OCO - Operational Coordinator
HN - Host Nation

NATO UNCLASSIFIED
Purpose

The purpose of Project 0IS03083 is to develop a suite of EW C2 tools

“C2 of EW will provide integrated tools for electronic


warfare threat assessment, response planning, and
coordination of force deployment, operational
reporting, and cueing to other functional services.
This capability will be used to plan, coordinate, and
monitor EW operations. “

NATO UNCLASSIFIED
Incremental implementation

Increment 3
C2 of EW FS
Increment 2 spiral 2
C2 of EW FS
spiral 1
Increment 1
NEDB NG

2020 2023 tbd

NATO UNCLASSIFIED
Increment 1 - NEDB NG

• NEDB (20 yrs old)


replacement
• Actual technologies
• Foundation data
provider for C2 of EW

NATO UNCLASSIFIED
Increment 2
MINIMUM MILITARY REQUIREMENTS:

•Support shared Situational Awareness


•REMP creation and distribution
•EOB Management
•Electronic Attack planning and execution
•Electronic Surveillance planning and execution
•Interoperability with other disciplines
•EW information exchange

Business processes
Use cases
User stories
User requirements

NATO UNCLASSIFIED
Increment 2 – C2 of EW s1

NATO UNCLASSIFIED
Planning
NATO & NATO Nations
considerations NCOP
EW FS
CESMO Plan Direct Monitor Assess
REMP RAP
Etc. RMP
RLP
ROE
EOI ECM
Core GIS
TGT
LIST
CRM REMP
7NNN Ad hoc
ES Feeds

HPTL
ICP
TS-EOB Partners Partners
Non-NATO Force Elements

Displayable
JRFL
Caveats
EOI

EME
ECM Non-NATO
EMO CEL MIJI Caveats ECM
TGT EOI MIJI EW
NATO EW Plan
LIST TGT
MSG MSG LIST

C-EOB - format
Mission Network (SECRET)
I-
EOB

RC- INT CR Caveat


MIJI
NEDB Spectrum
M
s
IED XXI
NATO
-NG Collaborativ
SMIR
DB e Functional
Services Online NARFA EMBC
Foundational Information
Host
REMP
REMP is defined as a complete and seamless depiction of the electromagnetic environment aiming at
positively identifying and continuously tracking all the emitters and associated platforms and weapons in
the area of responsibility. The REMP concept will facilitate an easier integration of EW in the operational
planning processes. REMP is envisaged to be centrepiece of the C2 of EW output, a valuable addition to the
NCOP and will support the overall decision making cycle.

REMP – the interface that connects EW assets into the decision making process

NATO UNCLASSIFIED
USERS?
SHAPE
EW Staff NATO JEWCS
C2 EW C2 EW
of of

JFCs / JFT HQs EW C2 elements:


EW C2 elements -EWCC or
C2
of
EW -SEWOC or
-EMB
C2 EW C2 of EW
of
AIRCOM, LANDCOM, MARCOM, SSCs Integrated management
EW C2 elements of:
- REMP
C2 EW - EOB
of
- EA/ES/ED
- EW info exchange

NATO, national capabilities


EW C2 elements
NATO, National
EW C2 systems
Background, status
2012: ACT published “Project Baseline Document” including the C2 of EW and NEDB NG user
requirements (URs);
2013: The Host Nation (NCIA) accepted only NEDB-NG part; C2 of EW was not ready;
NEWWG was tasked to refine the URs for the C2 of EW in support of ACT;
2013-2016: NEWWG developed the UR s.
2017: NEWAC approved the URs, however due to the project size, ACT recommended to prioritize
the critical ones as Increment 2 of the C2 of EW as CP addendum 4 (Increment 1 is NEDB
NG);
2017: NEWWG developed a set of Minimum Military Requirements, based on a set use cases and
user stories. The MMRs were endorsed by ACO and submitted to ACT.
Jan 2018: ACT finalized the CP Addendum documentation which includes requirements definition,
resource proposal, Project Data Sheet and the O&M plan.
30 Jan 2018 CP Addendum was submitted to NATO HQ for screening
Next major milestones: as of now the CP was provided to NATO HQ in January 2018. The next
step is JSSR approval by the NOR/IC (anticipated in March 2019). Following this funding
would be approved by the NOR/IC (anticipated in Apr/May 2019). Project Proposal approval
is anticipated in Apr 2020 and IFB by Oct 2020.

NATO UNCLASSIFIED
Summary

Documentation for the C2 of EW Increment 2


is being screened at NATO HQ in preparation
to NAC approval and project implementation.

NATO UNCLASSIFIED