You are on page 1of 1

1 2 3 4 5 6 7 8 9 10

KEY PLAN
F

F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

STREET 25M STREET 25M


4.50 5.00
20x10 in 20x12 in 20x18 in 25x18 in

1.60
40x18 in 40x20 in 40x20 in
ELECTRIC ROOM 30x18 in 40x20 in
2.20

2.20
2.40

7.5 TON 7.5 TON

ELECTRECITY ROOM

3.70
E

E
30*20 IN 30*20 IN
exhust air 1000 CFM exhust air 1000 CFM exhust air 1000 CFM
exhust air 1000 CFM exhust air 1000 CFM 17.85
exhust air 1000 CFM exhust air 1000 CFM
exhust air 1000 CFM

4.70 3.70
167 166 165 164 163 162 161 160 159 158 157 156 155 154 153 152 151 150 149 148 147 146 145 144

5.50
5.50

5.50

5.50

5.50

5.50

5.50

5.50

5.50
0.60 40x20 in
6.65

2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.60
exhust air 1000 CFM

1.00
5.50

5.40
168
3.90

HYPER MARKET STORAGE


40x20 in

23.90
5.50 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143
exhust air 1000 CFM

5.50

5.50
5.50

5.50

5.50

5.50

5.50
169
3.90

2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
40x25 in

exhust air 1000 CFM exhust air 1000 CFM


exhust air 1000 CFM exhust air 1000 CFM exhust air 1000 CFM exhust air 1000 CFM
exhust air 1000 CFM

4.70 4.00
2.40

20x20 in 20x10 in
D

D
22x10 in 30x20 in
50x30 in 50x20 in 40x20 in 40x20 in
2.50

170
4.00

exhust air 1000 CFM exhust air 1000 CFM


exhust air 1000 CFM exhust air 1000 CFM
2.50 2.50 2.50 2.50 2.50 exhust air 1000 CFM2.50 2.50 2.50 exhust air2.50
1000 CFM 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50
5.50 exhust air 1000 CFM 30*20 IN

30*20 IN
7.5 TON
2.50

5.50

5.50

5.50

5.50

5.50

5.50

5.50
7.5 TON
171
123 122 121 120 119 118 117 116 115 114 113 112 111 110 109 108 107 106 105 104

40x25 in
4.60

4.30

6.00
7.40

7.40
6.80
5.80
2.50

ADMINSTRATIVE ROOM

ADMINSTRATIVE ROOM
3.75

97 96 95 94 93 92 91
1.15

4.50

exhust air 1000 CFM


5.80 0.50 3.40 0.80 3.40 0.20
exhust air 1000 CFM exhust air 1000 CFM
GENERAL NOTES:
5.50

5.50

5.50

5.50

5.50
W.C
2.10

103 102 101 100 99 98 2.80


40x25 in
5 TON 4.80
3.70

1. This drawing shall be read in conjunction with all other


3.20

3.20

3.10 ADMINSTRATIVE ROOM 2.60 5 TON

2.50 2.50 2.50 2.50 2.50 2.50 3.10


C

C
50 cfm 50 cfm 20*20 IN

relevant architectural,structural & electrical drawings


50 cfm

ADMINSTRATIVE ROOM 1.70 20*20 IN 1.52 2.60 3.90 2.60 2.60 2.50 2.50 2.50
1.20 1.20
1.50
1.60

1.60
7.8%

7.8%
4.50 1.50 4.10
including those of other consultants.
4*4 in

10*6 in 10*6 in
1.30
4*4 in

4*4 in

WC 10*6 in 10*6 in
0.70

8.50
2.70

AXIAL E.FAN
1.30
1.50

50 CFM
4*4 in

2. It is the responsibility of contractors & manufacturers


4*4 in

2.00
1.40

4*4 in

1.30
3.20

10*6 in

to check all relevant site dimensions prior to the start

1.50
1.40
1.50

3.82 4.98 5.80 3.30 1.70 1.20 1.20 8.30 4.50 4.80 4.80 4.80 5.60
WC 1.50 OFFICE 4.10
1.70

AXIAL E.FAN 50 cfm


1.50

50 cfm 50 cfm
2.60
50 CFM
ADMNISTRATIVE ROOM of construction or manufacture.
4.20

4.20

4.20

4.20

4.20

4.20

4.20

4.20

4.20
2.00 2.30
3.70

5.80 W.C HOTEL LOBBY LEVEL


2.80
2.10

ADMINSTRATIVE ROOM STAFF ROOM LOW CURRENT ROOM boards room


3. All materials and components must be installed on site

1.30
FIRE PUMP ROOM
1.40

PUMP ROOM STAFF ROOM 4.00 5.50


CONTROL ROOM STAFF ROOM
exhust air 15000 CFM

10*6 in
exhust air 12000 CFM
40x30 in in accordance with manufacturer's instructions , shop
50x30 in exhust air 300 CFM

0.90 drawings and standard details.


A A
19.50

5.60

2.50
2.50

2.50

GARBAGE CHUTE

1.53
4. All dimensions are in millimeters unless noted

27.00
27.00

5.80 4.50
GARBAGE ROOM

otherwise.
B B
2.50 5 TON
2.50
(ELV-6) (ELV-4)
CONSULTANT
2.00

2.00

C 20*20 IN
C
11.00

D WATER TANK WATER TANK WATER TANK


2.50
(ELV-5)
2.50
WATER TANK WATER TANK WATER TANK D RIHAN DEVELOPMENT
(ELV-3)
2.00

2.00

E E CLIENT
13.20

13.20

13.20

13.00

13.00

13.00
F 0.60
F RIHAN DEVELOPMENT
G G
0.60

0.60
TANK TANK
OPENING OPENING

8.30 0.60
5.60

5.60

H H
B

B
6.00 5.55 5.55

I 2.50 2.50 I
0.60 0.60 5.55 0.60 0.60 5.55 6.00

U3
0.60

0.60

0.60

0.60

TANK TANK TANK TANK


OPENING OPENING OPENING OPENING

J J Enter address here

1 Date 1 Revision 1
REV. DATE DESCRIPTION FOR BY
ISSUED

ISSUE

PROJECT NO. 0001

PROJECT ARCHITECT
SCALE 1 : 200
DRAWN BY Author

CHECKED BY Checker
MANAGEMENT

Architect 18226 NORTH

Structural Engineer 46232

U³-MKC-DD-200-AR-DWG-0003
SHEET
200/1TITLE
A

A
1 02 GF - F.F.L +1.90
1 : 200
Ground Floor Plan
PRINTING DATE/TIME 10/26/2023 1:40:57 PM

1 2 3 4 5 6 7 8 9 10

You might also like