GUIDELINES FOR PRE STRESSED CONCRETE WORKS (SLABS)
3-6
CED-Trakhees has the right to disqualify previously approved supy
case declination in product quality was noticed.
CED-Trakhees can limit the work quantity for any specialist contractor
based on the performance quality of the work that will be evaluated from
time to time.
All the submission of above subjects should be passed to CED via stand
ard cover letter cross referring to PTC & PTS, valid trade license, in PDF
format.
DOCUMENTS REQUIRED FOR OBTAINING PRESTRESS PERMIT
rs
wo.
re
12.
Consultant cover letter indicating the submission subject and description
of submission purpose , project ID, specialist and system IDs, details of
attached documents, etc
Specialist document: prequalification-trading license- system approval,
designer approval, site engineer, etc...
Undertaking letter from specialist for pre stressing work (design and ex-
ecution) approved by the consultant.
Design criteria explaining all design data.
Software license copy.
POF detailed drawings signed and stamped by specialist and consultant.
DWG drawings are required for review purposes.
List of submitted drawings.
POF calculation signed and stamped by specialist and consultant, includ-
ing gravity, lateral force and thermal calculations (If any).
3D models of the full structure te check the lateral force effects on P.T
slabs design.
P.T software models.
Latest approved structural drawings.
Third party report (If applicable).
(GUIDELINES FOR PRE CAST CONCRETE WORKS
3.6.1
PRE CAST SPECIALIST REGISTRATION
Precast concrete elements shall be produced by certified manufacturers,
with certification demonstrating the capability of a manufacturer to fab-GUIDELINES FOR PRE STRESSED CONCRETE WORKS (SLABS)
3.6.2.7 General considerations
LM Structural shall be designed for vibration as PCI S: 9.7.
Es Minimum total bearing width shall be 100mm; the design
of bearing shall be as per Section: 5. BS8110.
3 The pre cast design shall be complied with section § in BS
Bu0.
4 The pre cast system for slabs shall be with taping cane rete
inclusive minimum reinforcement mesh of T8-
200mm.
3.6.3 DOCUMENTS REQUIRED FOR OBTAINING PRECAST STRUCTURE PERMIT
te
Consultant cover letter indicating the submission subject and
description of submission purpose , project ID, specialist and
system IDs, details of attached documents, etc
Specialist document: prequalification-trading license- system ap-
proval, designer approval, site engineer, etc...
Undertaking letter from specialist for pre stressing work (design
and execution) approved by the consultant.
Design criteria explaining all design data.
Software license copy.
POF detailed drawings signed and stamped by specialist and con-
Sultant. DWG drawings are required for review purposes.
List of submitted drawings.
PDF calculation signed and stamped by specialistand consultant,
including gravity, lateral force and thermal calculations (Ifany).
30 models of the full structure to check the lateral force effects
on P.Tslabs design.
P.T software models.
Latest approved structural drawings.
Third party report (if applicable).