Anncxurc A
FORNI I
lsse Rcgulation 3l
ARCHITDC'I''S CDRTI FICATF,
(To bc subrnittcd at the timc of Rcgistlation of Ongoing Projcct and tirr withdrawal of Moncy fiont
Dcsignated Account)

Datc

To.

Thc (Narnc & Address of Prornotcr),

Subjcct: Ccltificatc of Pcrccntagc of CornplcLion ol Construction Work of 5]11qfu9$lgp91 having MahaRERA


RcgistrationNumbcr-(orrly.Applicablcalicrpro.;cctRcgistration)beingdcvclttpcdby
ot 's Narnc

S IT,

Ir We have undenaken assignment as Archit€ct /Licensed Surveyor of certilying Pcrcentage of


Conrplction ol' Construction Work of <Proiect Namc- having MahaRERA Rcgistration Nutnber
( Only Applicablc aftcl prolcct Rcgistration. bcing do,clopcd by lPt'omolcr's Namc.l

l,lascd on Sitc hspcction. u,ith rcspcct to Layout / cach of thc BuiltlinglWing ot thc afotesaid Rcal Lslatc Project .
I ccrti[y that as on the date oI lhis ccrtificatc, the Pcrccntagc of Work donc for cach ol thc building/Wing of the
Rcal Estatc Projcct under MahaREP-A is as per Tablc A hcrcin below. The pcrccntagc ol thc work execulcd with
respect to each of the activity of the entire phase is detailed in Table ts.

't'A B1.E-A

Lavout i ljuilding lWing Number' (ro bc prepared scparalcly for each Layout rBuilding /Wing ofthc Projcct)

Sr. Tasks / Activity Perccnragc of Actual Work


No I)onc
(2)
(t) ( s on date ol'ths
Ccflificatc)
(3)

l Excavation

2 Basemerts (if any)

3 Podiums (if any)

4 PlinLh

5 Stilt Floor'
cERrq llrs{ lTq[, qHrerr{Ul rIIrT irlT-i[,, fuilq{ ea, ?o?l/ts t, vr* rsYr

6 Slabs of Super Structure

7 lnrernal walls, Intemal Plaster, Floorings, I)oors and windows within


[:lats/Prenrises

8 Sanimry Fiuings u ithin the Flat/Preurises

q Staircases. l.ifts Wells and [,obtries al cach Floor levcl Ovcrhead and
llnderground Water Tanks

l0 Extemal plumbing and extemal plastcr, clcvation, completion of terraces


with waterproofing of the Buildinglwing,

ll. Installation of Lil'ts. water punrps, Firc Figtrtirg Fittings and Equipment as
pcr CFO NOC, Blcctrical fittings, ;lechanical cquipmcnt, compliancc to
conditions of cnvironmcnt/CRZ NOC. Finishhrg to cntrancc lobby/s. plinth
protectio , paving ofareas appurtenant to Buildirlg^Ving. Cornpound Wall
and all other requireurents as may be lequired to complete project as per
specifications in aSreement of Sale. Any other aclivities.
.tAI}LE-B

Common Areas (Intcrnal and Extcrnal Dcvelopmcnt Works) in respcct of the Rcgistcrcd Phase / Projcct
Nunr ber

Sr. No Common areas and facilitics Proposcd Perccntage of Dctails


Actual Work Done
(Yes / No)
(As on date ofthe
(l) (2)
Certificate)
(3) (s)
(4)

I Intemal Roads & Footpaths

) Water Supply

3 Sewerage (Chatnber,

lines, Septic fank, S'l'P)

4 Stofln Water Drains

5 Landscaping & Tree Planting

6 Street Lighting

7 Community Buildings

8 l'reatment and disposal of sewagc and


sullage water.
q cERrE yns{ E lrt otsrglrwt qrr qr-i[', ftC-+r rr, iotq/dq t, vrt' tqxr
9 Solid Waste
management &

Disposal

t0 Water conservation /
Rain water harvesting

u Energy managemcnt

t2 Firc protectlon and lire sal'cty


requircments

r3 Electrical mctcr roonr, sub-station,


receiving station.

l4 Othcrs (Option to Add more)

Yours Faithfully,

Signature & Name (IN BLOCK LETTERS) of L.S/ Architect

(License No. .............)

Agreed and Accepted by

Signanrre ofPromoter
Name:
Date: