Datc
To.
S IT,
l,lascd on Sitc hspcction. u,ith rcspcct to Layout / cach of thc BuiltlinglWing ot thc afotesaid Rcal Lslatc Project .
I ccrti[y that as on the date oI lhis ccrtificatc, the Pcrccntagc of Work donc for cach ol thc building/Wing of the
Rcal Estatc Projcct under MahaREP-A is as per Tablc A hcrcin below. The pcrccntagc ol thc work execulcd with
respect to each of the activity of the entire phase is detailed in Table ts.
't'A B1.E-A
Lavout i ljuilding lWing Number' (ro bc prepared scparalcly for each Layout rBuilding /Wing ofthc Projcct)
l Excavation
4 PlinLh
5 Stilt Floor'
cERrq llrs{ lTq[, qHrerr{Ul rIIrT irlT-i[,, fuilq{ ea, ?o?l/ts t, vr* rsYr
q Staircases. l.ifts Wells and [,obtries al cach Floor levcl Ovcrhead and
llnderground Water Tanks
ll. Installation of Lil'ts. water punrps, Firc Figtrtirg Fittings and Equipment as
pcr CFO NOC, Blcctrical fittings, ;lechanical cquipmcnt, compliancc to
conditions of cnvironmcnt/CRZ NOC. Finishhrg to cntrancc lobby/s. plinth
protectio , paving ofareas appurtenant to Buildirlg^Ving. Cornpound Wall
and all other requireurents as may be lequired to complete project as per
specifications in aSreement of Sale. Any other aclivities.
.tAI}LE-B
Common Areas (Intcrnal and Extcrnal Dcvelopmcnt Works) in respcct of the Rcgistcrcd Phase / Projcct
Nunr ber
) Water Supply
3 Sewerage (Chatnber,
6 Street Lighting
7 Community Buildings
Disposal
t0 Water conservation /
Rain water harvesting
u Energy managemcnt
Yours Faithfully,
Signanrre ofPromoter
Name:
Date: