You are on page 1of 45

PRODUCT CATALOGUE

ENGINEERED
BUILDING
SOLUTIONS

BUILDING TOMORROW, TODAY


PEBSTEEL AT A GLANCE
04 An Industry Leader
06 Our Values
07 Our Vision And Mission
08 Our Fabrication Facilities

OUR SOLUTIONS & PRODUCTS


SOLUTIONS: SERVICES
10 Process
12 Quality Control

SOLUTIONS: SYSTEMS
14 Pre-Engineered Building
16 Structural Steel (STS)

SOLUTIONS: PRODUCTS
18 Standard Framing System

19 Sub-Structural Framing System


20 Diversified And Mega Structure
21 Fascia
22 Ridge Ventilator (RV)
24 Crane Runway Beam
25 Bracing System
26 Canopy
27 Mezzanine Floor
28 Other Items

Accessories
31 Door
32 Flashing And Trim
33 Connection Bolt And Fastener
34 Other Items

Sheeting Components: Profiles


35 PebRoof™
36 LokSeam®
38 PebSeam128®
39 PebWall®
40 PebLiner™
41 PebDek®

Sheeting Components: Materials


42 Silver270®
45 Alu-Zinc™
46 Hyper180®
47 AluPeb®
48 PebLeed™
50 GalvaPeb™
51 PebFoam™
52 PebInsul™

CASE STUDIES
53 Case Studies

PROJECT REFERENCES
61 Project References

1
Pebsteel At A Glance

2 3
PEBSTEEL AT A GLANCE

An Industry Leader 28+


Years in the industry

A Reliable Partner in Engineered Building Solutions


10 50+
from Design, Fabrication, and Installation Regional sales offices Countries where our projects locate

Pebsteel is a global enterprise specializing in providing solutions for Pre-Engineered Buildings and

1,400+ 100+
Structural Steel. Founded in 1994 and backed by Japanese shareholders (Okaya & Co., Ltd. and Nippon
Steel), Pebsteel operates in 10 regional sales offices and has headquarters in Vietnam. Our team is 1,400+
strong and is made up of certified engineers and dedicated business personnel with a deep understanding
of our customers’ needs.

Passionate and energetic employees In-house engineers

100,000MT+
Yearly total capacity

$100,000,000+
Average yearly revenue

$85,000,000+
Bank facilities

4 5
PEBSTEEL AT A GLANCE PEBSTEEL AT A GLANCE

Our Values Our Vision


We aim to become the benchmark in the steel
building industry, through innovative, safe,
and sustainable solutions.
Effective
Continuous innovative design of new systems,
technology, services and processes tailored to

Solutions
Our Mission
the customer’s needs.

Optimization and updating of current solutions


to ensure maximum efficiency and benefits for
all customers.

Empowering people and businesses through


Committed better engineered spaces.
We maintain customer support at every stage of the
process. Our support does not expire. We maintain

Partnerships
permanent loyalty to our customers.

At Pebsteel, integrity is of paramount importance.


We are transparent and honest, and dedicated to
the success of all customers, shareholders and
stakeholders.

Dynamic
Our highly specialized team provides the customer
a personalized experience.

Teamwork A well-oiled machine, our experienced workforce


eliminates customer stress.

6 7
PEBSTEEL AT A GLANCE

Our Fabrication
Our Solutions & Products

Facilities

7
Standing By To Serve

With six factories in Vietnam and one in Myanmar,


covering a total of 11,5 hectares of land, Pebsteel
maintains an inventory of 15,000 MT of steel ready
to go, equivalent to three months worth of building
materials, allowing for a prompt start to any project.

Capable of producing more than 100,000 MT/year, Fabrication facilities


we can carry out building projects of any size and in 2 countries
regularly handle mega structures of over 20,000 MT.

8 9
SOLUTIONS: SERVICES

Latest Software
Process
4. DETAILED DRAWINGS Optimization In Design
Our professional design team create detailed
plans and send them to the factories. Our certified team of in-house engineers use state-
of-the-art software and follow the latest international
design codes to optimize the weight, utility and
functionality of buildings.

Fast and Efficient Process Providing only the very best solutions is a core
principle in Pebsteel’s engineering practice, as we aim
We believe professionalism and customer to go above and beyond our customer’s expectations.
satisfaction are everything. From design to
fabrication, erection, and post-sales assistance,
we are always by your side.

International Design Codes


5. FABRICATION
Building materials are fabricated, tested, and

AWS ASCE
1. CONCEPT DESIGN perfected across multiple factories in Vietnam
Following initial consultations, it’s time to get to work. prior to shipping.
We work with you to put forward effective solutions.

Welding code Building code

2. PROPOSAL DRAWINGS
At the design stage, we work out architectural
6. INSTALLATION
Materials are packed, marked, and shipped to the
site. Your building is installed under on-site Quality
IBC MBMA
designs, as well as cost and schedules. Control supervision. International building code Fabrication & erection tolerances

AISC AISI
Design code Cold formed design code

3. CONTRACT AWARDED 7. WARRANTY


Once an agreement is reached, we sign a contract We built it. We maintain it. At Pebsteel we regard our
and get the ball rolling. clients as family; we’ve got you covered.

10 11
SOLUTIONS: SERVICES

Quality Control
Premium Low Maintenance
With stringent Quality Control implemented
throughout the process, we ensure our finished

Products And Operating Costs


products are of the highest quality, requiring only
periodic cleaning.

Our versatile range of superior quality materials Part of the design process ensures that Pebsteel
are imported from Japan, Korea, and China, are all buildings come with outstanding insulation, and as
qualified with ASTM standards, and comply with a result are energy efficient and protected against
the latest international design codes. water leakage.
Top of class paint quality
Paint from top global brands is applied to all Our ongoing maintenance and reliable warranty
products to achieve the strongest durability and provides our customers with peace of mind.
cleanest aesthetics.

Our highly-skilled welders and engineers are


supervised to ensure fabrication is completed to
industry-recognized standards and quality plans.

Our in-house Quality Assurance and Control team

10
inspect all materials thoroughly, ensuring product
perfection before shipment. Shot blasting for all jobs

Our on-site managers, Site supervisors and


Safety supervisors attend every project, ensuring
accidents and damage are entirely avoided.

Nothing Left
Year structural warranty

3 2
To Chance
Dry film thickness assurance

With competent workers and a strict emphasis


on Quality Control and Machine Maintenance, we
skillfully anticipate and eliminate problems at
the source.

All products are scrutinized through magnetic


particle testing and ultrasonic testing before Year no leak warranty Year materials warranty
delivery, and all cleaned through shot blasting,
assuring only the highest standards. Dimensional, visual assurance and magnetic testing (MPI)

12 13
PRE-ENGINEERED BUILDING Pre-Engineered Building

With over 6,000 buildings delivered in over 50


countries, Pebsteel sets the industry standards for

Pre-Engineered Building
engineering and fabrication.

Pre-Engineered Building systems (often used for


factories, shipyards, aircraft hangars etc.) allow for
flexibility in design, so we can optimize the building’s
utilities for aesthetics and end-user experience.

14 15
STRUCTURAL STEEL (STS)

Structural Steel (STS)

Pebsteel use STS for complicated and heavy We have partners all over Asia. With our partners
structures, these include skyscraper, airport at Steel Mills and Stockist we can ensure the
terminals, oil and gas projects to name a few. availability for conforming of any type of steel
In such cases where projects are pre-designed products conforming to ASTM, JIS, BS, EN,
based on standard rolled steels, the STS group AS/NZS standards.
will accommodate:

1. Estimation In cases where availability is not in line with the


2. Sourcing project schedule, we are able to fabricate Built-up
3. Over-all project management sections that will meet or exceed the properties of
4. Detailing of shop, assembly, installation drawing Steel products used.

The group will generate accurate estimates and


provide competitive bids enabling Pebsteel to be
within the business of Structural Steel fabrication.

We supply various fabricated Hot Rolled Steel Sections conforming to

ASTM A36 SS490


A572 Grade 50 EN S275JR
JIS SS400 S355JR

Structural Steel (STS) Vietcombank Tower, Vietnam.


STS can be applied to large-scale
projects such as airport terminals,
In addition to Pre-Engineered Buildings, we also skyscrapers, and sports stadiums..
offer STS systems.

Pebsteel uses STS for complicated and heavy


structures (such as skyscrapers, airport terminals,
oil and gas projects).

16 17
STANDARD FRAMING SYSTEM SUB-STRUCTURAL FRAMING SYSTEM

Standard Framing System Sub-Structural Framing System


EXTERIOR RIDGE CAP

PURLIN RIDGE LINE ROOF SHEETING


ROOF PANEL
EXTERIOR RIDGE CAP INSIDE FOAM
EAVE STRUT EAVE STRUT FLASHING
ROOF PANEL CLOSURE
PURLIN
FLASHING
PURLIN TRIM
CURVED PANEL BACK UP PANEL
EAVE GUTTER FASCIA OUTSIDE
EAVE SHEETING
ROOF PANEL
GUTTER FASCIA FOAM CLOSURE ANGLE
BRACKET
GIRT RAFTER RAFTER RAFTERSPLICE
TYPICAL TYPICAL RIDGE VALLEY
EAVE HEIGHT

CONNECTION TYPICAL RIDGE


CONNECTION GUTTER MAIN FRAME
DOWNSPOUT CONNECTION
WALL COLUMN DOWNSPOUT
SHEETING BOLTS CONNECTION BOLTS CONNECTION
STRAP
TYPICAL SPLICE RAFTER
STRAP
CONNECTION CANOPY H.S BOLTS
FINISHED FLOOR LEVEL WALL PANEL
WALL PANEL MAIN FRAME COLUMN RAFTER
COLUMN

BUILDING WIDTH WALL PANEL MAIN FRAME COLUMN


WALL PANEL
Curved Fascia
Typical Cross Section
RigidFrame
Rigid Frame With
WithBy-Pass
By-PassGirts
Girts
CAP FLASHING
FASCIA

CONCRETE INSIDE FOAM


GIRT
Canopy
(NOT BY PEB) CLOSURE POP RIVETS

FLASHING BOLTS
EAVE
TRIM TRIM ROOF PANEL BRACKET PANEL
RC COLUMN NOT BY PEB
PEB DECK PANEL
CLOSURE
OUTSIDE SHEETING CLOSURE
FOAM CLOSURE EAVE ANGLE
CONTINUOUS VALLEY GUTTER
EDGE ANGLE GUTTER CLOSURE
BUILDING WIDTH MAIN FRAME FLOWABLE MASTIC
BUILDING WIDTH ROOF
EAVE PANEL
MAX. PRACTICAL WIDTH=100m MAX. PRACTICAL WIDTH=80m MEZZANINE BEAM TRIM MASONRY NAIL INSULATION PURLIN
CLOSURE TRIM ROOF PANEL
MEZZANINE JOIST H.S BOLTS CLOSURE TRIM
Built-up Curved Rafter (BU) PebTruss (PT)
CANOPY
RAFTER VALLEY GUTTER
WALL PANEL
MAIN FRAME
WALL PANEL DOWNSPOUT RAFTER
RIDGE LINE
COLUMN
WALL PANEL STRAP

MAIN FRAME
COLUMN
Sidewall Roof Extension RAFTER
Mezzanine Joist Connection Canopy ABCHOR BOLTS

to Mezzanine Beam
CONCRETE COLUMN
Parapet Fascia
(NOT BY PEB)
BUILDING WIDTH BUILDING WIDTH

MAX. PRACTICAL WIDTH=180m MAX. PRACTICAL WIDTH=60m


CONCRETE
Clear Span (CS) Single Slope (SS) CONCRETE (NOT BY PEB)
ROOF PANEL
FLOWABLE
(NOT BY PEB) MASTIC CLOSURE TRIM
RIDGE LINE CONTINUOUS Roof System With Insulation
PURLIN
MASONRY
CONTINUOUS EDGE ANGLE NAIL
EDGE ANGLE
PEB DECK PANEL
PEB DECK PANEL VALLEY
GUTTER INSULATION

MEZZANINE JOIST MEZZANINE JOIST


MEZZANINE JOIST MEZZANINE JOIST RAFTER CONCRETE
WALL PANEL (NOT BY PEB)
WALL PANEL MEZZANINE BEAM ABCHOR BOLTS
MEZZANINE BEAM
WIDTH MODULE WIDTH MODULE
COLUMN
BUILDING WIDTH COLUMN
BUILDING WIDTH CONCRETE COLUMN
(NOT BY PEB)
PEB DECK PANEL
MAX. PRACTICAL WIDTH=150m MAX. PRACTICAL WIDTH=80m
Mezzanine Beam Connection to Main Frame Column
Multi-Span “1” (MS-1) PebHybrid (PH) Mezzanine Beam Connection CONTINUOUS

to Main Frame Column EDGE ANGLE


Roof System With Insulation
RIDGE LINE RIDGE LINE
MEZZANINE BEAM
ROOF PANEL RAKE TRIM
EAVE TRIM ROOF PANEL
RAKE TRIM MEZZANINE JOIST
ROOF PANEL CLOSURE
RAKE EAVE
CHANNEL GUTTER
RC COLUMN NOT BY PEB RAKE WALL PANEL
CHANNEL EAVE
RAKE ANGLE RAKE TRIM TRIM
SOFFIT PANELS RAKE TRIM CLOSURE TRIM COLUMN
RAKE ANGLE
BUILDING WIDTH POP RIVETS
ENDWALL PANEL SOFFIT
WALL PANELS
PANEL
CLOSURE TRIM
ENDWALL PANEL POP RIVETS DOWNSPOUT

Mezzanine Joist Connection to Mezzanine Beam


MAX. PRACTICAL WIDTH=360m MAX. PRACTICAL WIDTH=65m
STRAP
CLOSURE TRIM
Multi-Gable (MG) Roof System (RS)
Endwall Roof Extension With Soffit
Endwall Roof Extension With Soffit Sidewall Roof Extension

18 19
SUB-STRUCTURAL FRAMING SYSTEM

Diversified And Mega Structure Fascia

A fascia system in a Pre-Engineered Steel Building Pebsteel offers five standard fascias:
enhances the appearance and transforms it from an
ordinary-looking structure into an attractive building. Vertical fascia
Bottom curved fascia
Although the main purpose of a fascia is to Top and bottom curved fascia
conceal part or all of the gable roof, proper color Center curved fascia
coordination of the fascia sheeting, soffit, trims, Parapet fascia
gutters, and downspouts, generally enhances the
aesthetics of the building and gives it a distinct
appearance.

Laced column Double crane beam

FASCIA CAP FLASHING


GIRT
FLASHING POP RIVETS
BOLTS
CURVED BRACKET PANEL
PANEL FASCIA CLOSURE
BACK UP PANEL
FASCIA VALLEY GUTTER
BRACKET ROOF PANEL CLOSURE
ROOF
PANEL
VALLEY
GUTTER

MAIN FRAME
RAFTER
RAFTER
WALL PANEL
MAIN FRAME
COLUMN COLUMN

Box rafter Curved steel frame

Built-up curved rafter Megabeam Heavy column Curved fascia Parapet fascia

20 21
SUB-STRUCTURAL FRAMING SYSTEM
RAIN
WATER

Ridge Ventilator
WIND
(RV) WIND

HOT AIR HOT AIR

Ventilation equipment comes in two categories: Inlet Product Features


equipment and Outlet equipment. Ridge ventilator is
a necessity to ensure proper circulation of air. Reduce heat build-up
Reduce gaseous by-products from the
manufacturing process
Reduce flammable fumes to avoid risks of fire
Increase the performance of the ventilation
system in Pre-Engineered Buildings
Optimize energy use of air conditioners and
save operations costs

Huge RV system
RAIN WATER
HOT AIR

HOT AIR

Bird screen Front view

HOT AIR

5000
WIND

FRESH AIR
Mesh for RV Top view (RV3.0)
Pebsteel’s RV

22 23
SUB-STRUCTURAL FRAMING SYSTEM

Crane Runway Beam Bracing System

A crane system greatly improves the material Product Features Bracing systems are furnished along the length of Product Features
handling productivity within a building, promotes the buildings, this provides longitudinal stability due
safety, and allows more efficient utilization of space Improve the material handling productivity in to the weakness of the building structure in that Anti-rust and beautiful gable
by reducing or eliminating traffic due to forklifts and industrial buildings direction. (EN 12385 or GB/T20118-2006 or equivalent)
side loaders. Ensure safety and optimize space Fu=177 kN/cm2 Hot Dip Galvanized
Flexible crane beam structures for different The main purpose of a bracing system is the X Bracing: Galvanized bracing
crane system transmission of lateral forces due to wind, cranes, Flange Bracing: Galvanized flange bracing
earthquakes, etc. from their point of application to
the structure all the way to the column bases and
eventually into the foundations.
UP TO 300 TON CRANE RIGID FRAME
Pebsteel standard bracing systems are Diagonal
X-Bracing, Portal Bracing and Minor Axis Bending.

CRANE BRIDGE

CRANE BEAM
35m

HOIST
COLUMN BRACKET

FINISHED FLOOR LEVEL

48m

Galvanized cable bracing Gavalnized sag arrestor Cable braced at roof

Top running crane Galvanized flange bracing Cable braced at wall Flange bracing

24 25
SUB-STRUCTURAL FRAMING SYSTEM

Canopy Mezzanine Floor

Canopies are narrow roof systems that provide Product Features A mezzanine is an elevated flooring system located Pebsteel’s structures consists of built-up or hot
various functions such as a shade to block direct inside the outer shell of a steel building. The most rolled main mezzanine beams that support built-
sunlight on the building walls; an extended cover to Block direct sunlight and rainwater to protect common uses of a mezzanine are to serve as a up, hot rolled or cold-formed mezzanine joists
protect the buildings against the rain; and a cover at the walls storage area or to accommodate offices. which, in turn, support a metal deck. A reinforced
entrances of the buildings or adjacent to the walls Provide a temporary car shelter concrete slab (not supplied by Pebsteel) is cast
for car parking. Enhance the aesthetic appearance with soffits on the metal deck. A reinforced concrete slab (not
and trims supplied by Pebsteel) is cast on the metal deck as
the finished surface.
The standard Pebsteel canopy consists of built-up
tapered, hot-rolled, or cold-formed canopy rafters Learn more about
that cantilevered from the main frame columns Mezzanine Decking Profile in the page 41
or from the end wall columns. Rafters can handle
200mm-deep purlins to support the roof panels.
The roof panels of canopies normally match the
main roof of the building. Canopies are designed
to accommodate flashing and gutters of the same
material used for the main building.
Curved canopy Composite decking

Wide canopy up to 24m Mezz: column, beam, joist, deck

26 27
SUB-STRUCTURAL FRAMING SYSTEM

Other Items

Handrail Staircase Cage ladder (inside) Cage ladder (outside)

Catwalk Steel grating Composite beam Composite roof with sub purlin

Roof liner Hanging staircase without column Partitions Checkered plate

28 29
SUB-STRUCTURAL FRAMING SYSTEM ACCESSORIES

Other Items Door

Reclaimer Pipe rack Double sliding doors & pilot door Double sliding door with curved canopy

Tripper beam Huge truss jack beam, 48m Hangar door (height: 26m) Roll up door

Multi-level crane beam Conveyor system Special size door Personnel door

30 31
ACCESSORIES

Flashing And Trims Connection Bolt And Fastener

The aesthetic appearance of a Pre-Engineered Steel The most common trims of Pebsteel which are Product Features Anchor Bolts:
Building is enhanced by the appropriate flashing roll-formed from 0.5mm thick (nominal) pre-painted JIS G3101 - SS400 (or equivalent) Fu=40.0 kN/cm2
and trims. They are sheet metal closures designed AluPeb® sheeting coils include: Galvanized anchor bolts
primarily to provide weather tightness and neat Galvanized primary and secondary
appearance at corners and junctions of a building. Sheeting coils include: connection bolts High Strength Bolts:
Eave trims Galvanized sheeting fasteners: screws ASTM A - 325 type 1 (or equivalent), hot-dip
Gable trims galvanized
Corner trims

Machine Bolts:
DIN 6921 - Grade 4.6

Corner trims Eave trims


16 24

Anchor bolts (galvanized) 3 nuts Hillside washer (galvanized) Galvanized fasteners with 19mm EPDM
& 2 washers washer

Gable trims Gable trims Hot-dip galvanized bolts & nuts Nuts for anchor bolts Plastic cover for anchor bolts

32 33
ACCESSORIES SHEETING COMPONENTS: PROFILES

PebRoof
Other Items ™

Roof Wall
PebRoof™ For Walls And Canopies

Smart Choice For All Roofs

PebRoof™ is a panel commonly installed on roof slopes as low as


8%, it can be installed as a metal roof over both purlins and decked
applications. The PebRoof™ panel can be installed vertically or
horizontally as a wall panel. PebRoof™ can be easily applied for
fascias, liners, walls, soffit, ridge vent and canopies.
PebRoof™ For R.V System
Louver Gutter & downspout Pebsteel employs high class fasteners with anti-corrosion resistance
for all projects. Screws for the roofing use are assembled with metal
and EPDM (ethylene propylene diene monomer (M-class)). Bonded
Washer with a diameter of 19mm.

Metal washers prevent the screw from over-driving as well as for


unscrewing due to vibration of construction
3mm-thick EPDM rubber has good capability for anti-leaking

Washer T19 (EPDM), 3mm thick

19mm (T19)
Framed opening Translucent panel

(3+1)mm

55mm

1000

250 1 2 3
O/S
I/S 32

1. Pressure too weak


Expanded metal Hanging support
2. Pressure correct
3. Pressure too strong

34 35
SHEETING COMPONENTS: PROFILES 360o
SEALANT
SEALANT

LokSeam
SELF-LOCK
STANDING SEAM
ROOF 360o
® FIXING
SUPPORTER

Roof

Water Leak Optimum Solution For Building


LokSeam®, which has a FM Approved certification,
is a standing seam panel float on a system of sliding
clips that prevent damage from thermal expansion
and contraction.

Product Features

Full single piece roof length up to 120m without


end-lap joints
Resistance to strong winds up to 300km/hr
Heat expansion does not transfer to purlins:
Extra safety factor
No air or water leaks help to save energy and
operating costs

Installation

LokSeam® panels are joined at the side-lap with an


interlocking 25mm-high seam standing above the
major rib. Panel side-laps are seamed by a special
seaming machine. All panels are seamed together,
creating 360-degree double lock seams that
have machine-applied butyl sealant to ensure the
weather-tight and leak-proof joints.
Seamer

Double Lock Seam

470

66 65

Distance between clips only 470mm. Its standing seam design eliminates 80% of the through fasteners found
in normal systems to achieve greater weather resistance. LokSeam® panels have a width coverage of 470mm
with 66mm high ribs including the seam. The minimum roof slope of the LokSeam® roof panels is 3%.

Step 1 Step 2 Step 3

36 37
SHEETING COMPONENTS: PROFILES

PebSeam128 PebWall
® ®

Roof Wall

The Ultimate Roof Profile Enhance The Aesthetic Of The Building

SEALANT 900
CLIP 400
41
SEALANT O/S
PebSeam128® Roof System I/S YKK Factory, Vietnam
127
128

Z SUPPORT CLIP PebWall® is a through-fastened wall metal panel and is ideal for
commercial, industrial, and architectural wall applications.
Distance between clip only 400mm
Product Features

PebSeam128® is an anti-leak standing seam panel that is developed Full net coverage width is 900mm
from LokSeam® for wider roof systems. PebSeam128® panels provide High ribs (41-42mm) for greater load capacities
400mm width coverage with 128mm-high ribs including the seam. The Vertical installation can enhance the aesthetic
minimum roof slope for the PebSeam128® roof panel is 3%. of the building

The design of PebWall® provides superior load and span capacities


Product Features which often allow savings in the structural support system. PebWall®
can hide more screws to enhance the aesthetic of the building.
128mm-high ribs to prevent overflow of rainwater
Full single piece roof length up to 150m without end-lap joints Installation
Provides resistance to strong winds up to 220km/hr
Heat expansion does not transfer to purlin: Extra safety factor Install the panels straightly for the best water tightness without causing
No air or water leaks to save on energy and operating costs Seamer waves or distortions. Heineken Factory, Vietnam

38 39
SHEETING COMPONENTS: PROFILES

PebLiner ™
PebDek
®

Roof Wall Deck

Best Profile For Wall And Roof Faster And Easier Construction

PebDek®76 PebDek®55
895 832
PebLiner™ For Interior Walls
295 208

76 55

1000
125 125
O/S PebDek®, developed by Pebsteel, is a cold-formed corrugated steel profile supported by steel joints or beams.
18
I/S PebDek® is available only as 1.0mm-thick unpainted galvanized coated panels complying with the AS 1397
G350 Z275 coating standards that are subject to scratching and repeated friction during processing.

Product Features Basic Use


18
2 variables of mezzanine steel profiles: PebDek® is the steel decking profile that supports
Lapping Rib PebLiner™ For Roofs PebDek®55 & PebDek®76 the wet concrete for faster and easier construction.
Available in 1mm-thick unpainted galvanized
panels complying with the AS standards
Create a strong composite structure with Installation
concrete and metal reinforcement for mezzanine
PebLiner™ is the best profile for interior walls and roofs in Pre-Engineered Buildings. Each panel is 1000mm floors of Pre-Engineered Buildings Install the PebDek® panels straightly and fix screws
wide and is screwed to the frame. Full-height PebLiner™ panels run from the floor to the roof and attach to the Optimize materials to save costs to mezzanine beams.
eave purlins and rake rafters.

Product Features Installation

Optimum material for interior wall and roof sheeting Install the PebLiner™ panels
A light material that needs no extra support on the roof structure straight for the best water
Enhances the interior beauty of Pre-Engineered Buildings tightness without causing waves
Increase the lifespan of insulation materials or distortions.
PebDek® With Reinforcement Mezz: Column, Beam, Joist And Deck

40 41
SHEETING COMPONENTS: MATERIALS

Silver270 For Environments That Require Higher


®

Corrosion Resistance
Roof Wall Purlin

Ultimate Corrosion Protection


Technical Information

Corrosion factor (H₂O, O₂)


Coating film

Special coating film


1 Chemical treated layer

2 Zn - Al - Mg 270gr/m2 Zn coating layer


(both sides)

3 Base metal
Steel sheet
2 Zn - Al - Mg 270gr/m2
(both sides)

1 Chemical treated layer Shuts out factors of corrosion Corrosion suppression function Coating adhesiveness

Recommended End Use


Facilities and compost plants related to agriculture and dairy farming Fertilizer

Feedmill
Silver270® is only made in Japan and Korea. It is a Product Features
270gr/m2 Al, Zn, Mg coating panel, unpainted high Chicken / Cow sheds
quality solution. The corrosion resistance of Superior corrosion resistance
Compost houses and plants
Silver270® is enhanced by the composite effect of Superior scratch resistance
adding Al and Mg to the conventional Zn coating. Replacement for post hot dip galvanized Chemical products
products (Surface-treated in their final shapes) Buildings near Areas of salt damage (Concrete contact and close to Multi-storey parking garages
Resource-saving due to its long lasting and sea projects)
excellent corrosion resistance with a relatively Production halls
light coating
Environment friendly, Chromate free and Highway and railway related facilities in cold regions
satisfies all requirements of environmental
regulations such as RoHS and ELV
Typical Applied

PebHybrid® Girts Purlins

42 43
SHEETING COMPONENTS: MATERIALS

Alu-Zinc ™

Roof Wall

Bare AZ150 Anti-corrosive Coating

Animal Feedmill

1 Anti-fingerprint

2 Al-Zn coating 150gr/m2


Al 55%-Zn 45% (both sides)

3 Base metal
2 Al-Zn coating 150gr/m2
Al 55%-Zn 45% (both sides)

1 Anti-fingerprint

Alu-Zinc™ is 150gr/m2 Al-Zn coating, an unpainted Product Features


economical solution. The AZ150 coating will
guarantee excellent corrosion protection and is Scratch resistance
suitable for mild corrosive environments which Environmentally friendly, Chromate free and
Fertilizer Plant require corrosion resistance of acidic rain, dirt long lasting Alu-Zinc
staining and outdoor exposure.

Technical Specification

Base metal thickness (mm) Total coating thickness (mm)


0.45 0.50

Chicken / Cow Sheds

44 45
SHEETING COMPONENTS: MATERIALS

Hyper180 AluPeb
® ®

Roof Wall Roof Wall

No Color Change For 20 Years Provide Superb Durability In Color Retention


1 PebClean for anti-dust and special 1 PebClean for anti-dust and special
reflective PVDF 20µm reflecting Super Polyester 20 µm

2 Epoxy corrosion inhibitive Primer 2 Epoxy corrosion inhibitive Primer


coating 5µm coating 5µm

3 Chemical treated layer 3 Chemical treated layer

4 Al - Zn coating 180gr/m2 4 Al-Zn coating 150gr/m2


Al 55%-Zn 45% (both sides) Al 55%-Zn 45% (both sides)
5 Base metal 5 Base metal
4 Al - Zn coating 180gr/m2 4 Al-Zn coating 150gr/m2
Al 55%-Zn 45% (both sides) Al 55%-Zn 45% (both sides)
3 Chemical treated layer 3 Chemical treated layer
2 Epoxy corrosion inhibitive Primer 2 Epoxy corrosion inhibitive Primer
coating 5µm coating 5µm
6 Polyester 7µm 6 Polyester 7µm

AluPeb® panels are the most innovative, super Super Polyester Painted AZ150 Alu-Zinc™
durable, and environmentally friendly product
Hyper180® is very special, featuring an AZ180 Technical Specification to provide superb color fastness and corrosion The Zinc has a self physical property called Cathodic
coating and PVDF (Polyvinylidene Fluoride) paint. 5 = Highest performance 1 = Lowest performance resistance despite severe environmental conditions. reaction. Whenever any cut happens to the material
AZ180 coating is the Best Coating Protection for the adjacent side of the Zinc reacts with the external
severe corrosion (salt, alkaline, fertilizer, chemical, Weathering
properties
Hyper180® Acrylic
Silicon
Polyester
Polyester
Vinyl
Plastisol
Urethane Anodized Product Features environment (air, rainwater) which forms the ZnO₂
etc.) while PVDF paint has extremely good gloss Color
5 3 4 2 2 3 3
layer on the cut edges to protect the base steel
and color retention. Environmentally friendly product (Chromate-free) against oxidation (self-healing property).
retention
Gloss
retention
5 3 4 2 2 3 3
Optimal heat resistance & reflectance
Product Features Chalk
retention
5 3 4 2 2 3 3 Superb color fastness and corrosion resistance
Performance list
Performance list The Aluminum has good barrier protection while the
Long-term durability Zinc has good self-healing properties. Therefore,
Generic coatingcoating
Generic type type Humidity resistance
Humidity resistance General corrosion
General Color Color
corrosion Abrasion
Abrasion Gloss retention Formability
Gloss retention Formability Chalk Chalk
resistance (*)
resistance (*) performance resistance
performance resistance
Humidity
Excellent corrosion resistance the combination of these materials, which is
4 4 4 4 4 4 2 SiliconeSilicone
modified polyester Very good Very good Very good Very good Good Good Very good Very good
retention
modified polyester Very good Very good Very good Very good Very good Very good

Superb gloss and color retention Physical Silicon Vinyl


Zinc-Aluminum coated layer 150gr/m², provides
(*) includes resistance
(*) includes to severe
resistance natural natural
to severe and industrial environments
and industrial environments
Hyper180® Acrylic Polyester Urethane Anodized
properties Polyester Plastisol
Durable despite severe environmental conditions Weathering Performance optimum corrosion resistance for sheeting panels.
Weathering performance
Weathering performance

Abrasion
<Exposure test> test>
<Exposure

5 3 3 2 3 4 3
Exposure site: Miyazaki
Exposure Prefecture,
site: Miyazaki Japan Japan
Prefecture,

retention
Exposed: 10 years
Exposed: 10 years

Exposure
Impart
Color difference (E)
Color difference (E)

5 3 3 3 5 3 3
resistance
Generic coating type Silicone modified polyester
Higher Performance Of Hyper180®
Performance list Performance list

Test
Generic coating type Humidity resistance Generic General
coating corrosion
type Humidity
Color resistanceAbrasion General
Gloss
corrosion
retention Color
Formability
Abrasion
Chalk Gloss retention Formability Chalk
Film
Humidity resistance Very good
resistance (*) performance resistance resistance (*) performance resistance
5 2 2 3 5 4 2
PVDF Resin-based Coatings
flexibility Silicone modified polyester Very good Silicone Very
modified
goodpolyester Very
Verygood
good Very good Very good
Good Very
Verygood
good Very
Verygood
good Good Very good Very good

Exposure site:
Hardness 3 5 4 5 3 4 4 Miyazaki Prefecture,(*) includes resistance to severe natural and industrial environments
(*) includes resistance to severe natural and industrial environments General corrosion resistance Very good
Japan, Exposed: Weathering performance (*)
In all critical measures of performance, Hyper180®
Weathering performance

Mar 3 4 4 4 3 3 4 10 years
Color performance Very good
<Exposure test> <Exposure test>
Exposure site: Miyazaki Prefecture, Japan Exposure site: Miyazaki Prefecture, Japan

resin-based finishes deliver dramatically higher


Exposed: 10 years Exposed: 10 years
<Accelerated
<Accelerated weathering
weathering test> test>

Chemical Silicon Vinyl Abrasion resistance Very good


Sunshine
Sunshine weatherweather meterhours
meter 2,000 2,000 hours

Hyper180 Acrylic Polyester Urethane Anodized


performance than other coating products. Accelerated
® Color difference (E) Color difference (E)
resistance Polyester Plastisol
Gloss retention Good
Acids &
Alkalies
5 3 3 3 5 3 2 Weathering
Formability Very good
The charts below show relative comparisons based Oil stain 4 3 4 4 4 3 3
Test
on published evaluations of generic coatings and Chalk retention Very good
Water
Sunshine weather
the opinions of leading coating formulators. immersion
3 3 3 3 3 3 4 meter 2,000 hours (*) includes resistance to severe natural and industrial environments
<Accelerated weathering test> <Accelerated weathering test>
Sunshine weather meter 2,000 hours Sunshine weather meter 2,000 hours

46 47
SHEETING COMPONENTS: MATERIALS Lower Energy Consumption Technical Specification

In moderate to hot climates, compared to roofing Color SRI


Solar Thermal

PebLeed
reflectance emittance
material of similar color with lower solar reflectance,
PebLeed™ can reduce annual cooling energy

White Cream 82.00 0.69 0.86
consumption. PebLeed™ reduces peak roof
temperature by up to 5˚C for White Cream color.
Greater comfort while using less energy helps to Compared to other roofing materials of similar
reduce cost and is friendlier to the environment. colors with lower solar reflectance in moderately
Roof Wall hot climates, PebLeed™ can reduce annual cooling
energy consumption to save on operation costs

Best Heat Reflectance Coils


as well as being more environmentally friendly.

SRI (Solar Reflective Index) Solar Reflectance

PEB Blue 15 PEB Blue 17%


1 PebClean for anti-dust and special
Blue Tooth 24 Blue Tooth 24%
reflective Super polyester paint 20µm

2 Epoxy corrosion inhibitive Primer Green Tea 26 Green Tea 26%


coating 5µm
White Cream 82 White Cream 69%
3 Chemical treated layer

4 Al - Zn coating 150gr/m2 0 25 50 75 100 0 25 50 75 100


Al 55%-Zn 45% (both sides)
5 Base metal
4 Al - Zn coating 150gr/m2 Green building rating tool such as Leadership in Energy and Environment Design (LEED®) requires materials
Al 55%-Zn 45% (both sides)
3 Chemical treated layer with high SRI values. PebLeed™ offers higher SRI values thus complying to the green building requirements.
2 Epoxy corrosion inhibitive Primer
coating 5µm
6 Polyester 7µm

PebLeed™ is essential for reflecting the solar heat Product Features


on the roof and lower the surface temperature
by absorbing less heat from the sun. PebLeed™ Pebsteel’s best material for solar reflectance
panel results in reduced heat retention after a long High SRI value to meet LEED®’s standards for
hot day and helps to achieve cooler roof surface Green Buildings
temperatures. Enhance the insulation performance of LEED® Certificate From The United States Green Building PebLeed™ For Roofing
the building Council (USGBC)
Reduce roof temperatures up to 5°C
Environmentally friendly product (Chromate-free)

Taekwang Vina Factory, Vietnam Shoes Factory, Vietnam

48 49
SHEETING COMPONENTS: MATERIALS

GalvaPeb ™
PebFoam ™

Deck Purlin Roof Wall

Minimized Spangle Galvanized Purlin Green Energy Efficient Solution


PebFoamTM, the cross-linked polyethylene foam, ROOF PANEL
LokSeam®
is an energy saving product that always provide
the best insulation solutions without affecting
environment or human health. This is one of
1 Lightly oiled layer development in green technology.

2 275gr/m2 total Zn coating


(both sides)
Product Features
3 Base metal Extra-long lifespan and durability
2 275gr/m2 total Zn coating Odourless
(both sides)
Non-toxic hazards such as no plasticizers, CLIP FOR
1 Lightly oiled layer PURLIN
heavy metals, or formaldehyde LokSeam®
Excellent thermal insulation INSULATION
Improve energy efficiency PebFoam™

Ultra-low smoke emission Cross section


GalvaPeb™ is the 275gr/m2 hot-dipped Non-fibrous
Zinc-coated high tensile steel with Minimized 1 Metal 2 Trocellen 3 C-Purlin 4 Steel

Product Benefits
1

Spangle. GalvaPeb™ is the material to produce


Deck Heat Pro Frame
(Foil facing down)
2
3

purlins and girts Z & C of Pebsteel. 4

Eco-friendly
Product Features Energy saving
60
56.8°C

Temperature (°C)
55

Stable thermal conductivity


52.6°C R-Value: 0.39
50
45 47.9°C R-Value: 2.30

High durability and corrosion resistance Quick, easy, and neat to install
40 R-Value: 2.74

35

Lead-free Zinc coating material for No maintenance and made to last


30

GalvaPeb™ For Purlins 25

environmental friendliness and human health Contribute credit for green construction
20
11 12 13 14 15 16
Time

Eye-catching shiny gloss metallic appearance Roof

Fire Behaviour Technical Specification


Besides, GalvaPeb™ is a friendly material to the
environment and human health because it is lead-free. Technicadata Test Standard PebFoam™ Thickness (mm) Width (mm) Length (m)
This material also has a shiny metallic appearance Fire Rating
BS 476 PART
CLASS 0
5 1,2 80
6&7
and consistent surface for a better aesthetic. 10 1,2 45
Burning Test UL 94 HF-1
Spangle size can be affected not only by the Z Shaped Purlins Burning Test - Flame Spread
zinc chemistry and cooling rate but also by other And Smoke ASTM E 84 CLASS A
Developed Index
factors such as the smoothness of the substrate.
Consistently controlling spangle formation to a Ignitability Index 0

specified size, and then to verify the compliance, is Spread Of Flame Index AS/NZS 0
an extremely difficult task. The specifications for the Heat Evolved Index 1530.3 0
Z SHAPE C SHAPE
Zinc-coated (Galvanized) steel sheet is defined in Smoke Developed Index 1
AS 1397 as follows: Maximum Specific Optical
ISO 5659-2 Ds (MAX) < 50
Z & C Shaped Purlins Smoke Density Roof Insulation Roof & Wall Insulation For Hangar

50 51
SHEETING COMPONENTS: MATERIALS

PebInsul ™ Case Studies

Roof Wall

Project References
Efficient Heat Reduction With NFR-1 Facing

PebInsulTM is a highly efficient, lightweight, strong, PebInsul™ Installation Process: Rolling


resilient, and easy to handle flexible blanket And Stapling A Tab
insulation composed of fine, stable and uniformly
textured inorganic glass fibers bonded together by a
non-water soluble and fire-retardant thermosetting
and heat resistant resin. It is free of coarse fibers
due to its mineral composition.

Product Features

Greatly reduces heat gain or loss through the Step 1 Step 2


building envelope. It will not rot, disintegrate
or slump
NFR-1 Facing brighten the building interiors ROOF PANEL
due to its high light reflectance, reduce the cost
of interior lighting, contribute to an effective
vapor barrier and to the control of condensation INSULATION

and dripping moisture


NFR-1 Facing has no metal content, thus it
EAVE PURLIN
does NOT promote any corrosion when in direct Facing wider than insulation
contact with the steel Purlins/Beams/Cladding
Avoid future moisture problems by using a low INSULATION
ROOF PANEL

EAVE GUTTER
perm NFR -1ROOF facing
PANEL INSULATION

Reduces the moisture entering the fiberglass


insulation EAVE PURLIN

Enables the insulation to perform as intended INSULATION


INSULATION

Reduces the likelihood of water or moisture issues


EAVE GUTTER

Insulation detail at eave


EAVE PURLIN

INSULATION
EAVE GUTTER

Strong NFR-1 facing, No wire mesh needed Roof insulation Wall insulation

52 53
5 months in a row at
150% capacity

CASE STUDIES

Vinfast Automobile Factory Wood Furniture Manufacturing Plant

Building Type Factory Building Type Factory

Weight 11,790 MT Weight 13,000 MT

Location Vietnam Location Vietnam

Challenges This project had a strict project schedule, it required Pebsteel’s factories to work at 150% capacity for 5 months in a Challenges A large complex consisting of a factory, warehouse, office building, parking lot and housing handled by Pebsteel.
And Solutions row to stay on track with the general construction timeline. And Solutions In order to meet the aesthetic request from the investors, a sophisticated combination of Pre-Engineered Steel with
concrete and glass as well as horizontal wall panels were implemented. The project required complicated erection
Pebsteel also successfully optimized the usage of materials and altered the details to cater to climate conditions on methods and skillful workers to come to fruition.
Cat Ba island. Furthermore, steel frames were fabricated with a 20% elevated strength resistance property compared
to the original design without raising the production costs.

54 55
CASE STUDIES

Taekwang Vina Factory Okada Manila Hotel and Resort Complex

Building Type Factory Building Type Hotel and Resort

Weight 3,100 MT Weight 1,588 MT

Location Vietnam Location Philippines

Challenges The first Green industrial complex which was required to meet specific LEED® requirements. Pebsteel chose Challenges With a total built-up area of 690,000m², the Okada Manila Hotel and Resort (Formerly Manila Bay Resorts) is an
And Solutions environmentally friendly products and design solutions some of which included: PebLeed™ for the roof, And Solutions extremely complex project with a very demanding curved corridor design which makes it look so luxurious, like the
PebInsul™ for the insulation, and specially designed Wall and Roof ventilation systems. center point of a prosperous city.

All of these materials and systems promote energy saving and lessen factors that contribute to air, water, and Pebsteel is proud to be chosen as the steel structure supplier for the curved steel structure of glass corridor
land pollution. canopy. Our commitments enable us to deliver another impressive project and continuously achieve breakthroughs
in P.E.B designs.

56 57
CASE STUDIES

14-Storey Office Building Big Leap Palm Oil Processing Plant

Building Type Office Building Building Type Factory

Weight 11,800 MT Weight 3,800 MT

Location Philippines Location Indonesia

Challenges Was built with Pre-Engineered Steel construction technology to significantly reduce construction time. The frame Challenges Big Leap complex manufactures consumer products extracted from palm oil. This is one among many national key
And Solutions of the building is made of high tensile steel with a bay spacing of 10 meters, this allows for optimal use of space by And Solutions projects made under Foreign Direct Investment (FDI) in Indonesia in 2014.
creating a flexible design for other architectural purposes.
The construction of this project required the implementation of advanced technology and standards in design. A high
This is considered unique in the P.E.B industry as it is most commonly 1 to 7 floors maximum. This project was level in detailing/ shop drawings as well as high precision in fabrication and installation came together to make this
designed to withstand 250km/hour winds. Top Japanese consultants were asked for approval of the design and an extremely successful project. As a result, all of the Pre-Engineered Steel Buildings came on-line in 2015 with the
fabrication for this unique project. highest building being 68m.

58 59
PROJECT REFERENCES

Aircraft Hangar And Shipyard

Helicopter Hangar, Myanmar

Aircraft Hangar, Pakistan

CASE STUDIES

Lufthansa Hangar
Shipyard (24m High, 30 MT Crane), Vietnam Aboitiz Shipyard, Philippines

Building Type Aircraft Hangar

Weight 1,700 MT

Location Philippines

Challenges This is a super-sized aircraft hangar made with Pebsteel’s 128m wide Clear Span Frame. This mega structure enables
And Solutions many large aircrafts to be accommodated inside at the same time to undergo mechanical maintenance.

Pebsteel also supplied the sliding door system for this Hangar, which optimizes space and budget while ensuring the
highest quality standards.

Aircraft Hangar, Vietnam Shipyard (34m High), Vietnam

60 61
PROJECT REFERENCES

Farm And Agricultural Products

Animal Feed Mill, Philippines Agri King Tower, 47m High, Philippines

C.P. Vietnam Manufacturing Plant, Vietnam Animal Shed, Cambodia Rice Mill, Myanmar Animal Feed Mill, Myanmar

15M

Animal Shed, Philippines Nutritional Product Factory, 45m-high Tower, Vietnam Cow Barn, Indonesia C.P. Animal Food Factory, 15m Wide Canopy, Cambodia

62 63
PROJECT REFERENCES

Dairy Product, F&B, FMCG

Heineken Brewery Factory, Vietnam

Instant Coffee Factory, 42,5m High, Vietnam


Mild Seven Cigarette Factory, Myanmar Flour Mills, Indonesia

Pepsi Cola Bottling Plant, Philippines

Unilever Home Care Liquids Factory, Vietnam Anheuser-Busch Vietnam (Budweiser) Brewery Factory, Vietnam

64 65
Confectionery Factory, Myanmar

Brewery Factory, Cambodia

Dairy Farm, Vietnam The 2nd Largest Yakult Plant, Philippines

66 67
PROJECT REFERENCES

Distribution Center, Logistics, Warehouse Cold Storage

Smart Logistic Warehouse, Indonesia Cold Storage, Vietnam

Distribution Center, Myanmar Distribution Center, Vietnam Cold Storage Center, 90m Truss System, Myanmar Cold Storage, Indonesia

Samsung Electronics Ho Chi Minh Complex (SEHC) Storage, Vietnam Warehouse, Philippines Fishery Cold Storage, Vietnam Cold Storage and Processing, Myanmar

68 69
PROJECT REFERENCES

Electronics and Light Product Machinery, Automobile, Spare Parts

Camera Module Manufacturing Plant, Vietnam Electric Lighting Equipment Manufacturing Plant, Vietnam

Kenda Tire Factory, Vietnam

Automotive Wire Harnesses Factory, Vietnam Spring Manufacturing Factory, Cambodia


Denso Factory, Cambodia Semiconductor Manufacturing Plant, Vietnam

Electronics and Telecommunications Equipment Electronics Devices Manufacturing Factory, Cambodia Sailun Tire Factory, Vietnam
Manufacturing Factory, Vietnam

70 71
PROJECT REFERENCES

Mechanical Engineering, Metallurgy Medical and Pharmaceutical

Pharma Factory, Vietnam Pharmaceutical Factory, Vietnam

Doosan Heavy Industries Factory, Vietnam

Pharmaceutical Manufacturing Factory, Vietnam Medical Glove Factory, Thailand

Steel Mill (Phase 2), 5000MT, Bangladesh Steel Mill (Phase 1), 9000MT, Bangladesh

Steel Mill, Indonesia Steel Factory, Indonesia Omron Healthcare Vietnam Factory, Vietnam NSK Precision Factory, Vietnam

72 73
Oil and Gas, Energy and Chemical

Thermal Power Plant - 18,300 MT, Vietnam

Reliance Industries Refinery Factory, India Power Plant, Vietnam

Urea-Formaldehyde Resin Plant, Thailand Thermal Power Plant, Cambodia

Coal Shed, Indonesia Coal Shed - Thermal Power Plant, Indonesia

TOA Painting Warehouse, Indonesia Chemicals Warehouse, Malaysia Korea-Vietnam NPK Fertilizer Factory, Vietnam

74 75
PROJECT REFERENCES

Shoes, Leather Textile, Garment

Zipper Manufacturing Factory, Vietnam

Shoes Manufacturing Factory, Vietnam

Shoes Factory, Vietnam Footwear Manufacturing Factory, Vietnam

Rubber Glove Manufacturing Plant, Vietnam

Footwear Manufacturing Plant, Vietnam Shoes Processing Factory, Pakistan Garment Factory, Vietnam Textile Factory, Vietnam

76 77
PROJECT REFERENCES

Textile, Garment Wood, Furniture, Paper

Gain Lucky Factory, Vietnam

Paper Manufacturing Factory, Vietnam

Garment Factory, Vietnam Furniture Manufacturing Factory, Vietnam Wood Furniture Manufacturing Factory, Vietnam

Knitting and Garment Factory, Cambodia Glove Manufacturing Plant, Thailand Paper Manufacturing Plant, Thailand Warehouse and Office, Thailand

78 79
PROJECT REFERENCES

Aquafeed, Seafood Infrastructure (Public Buildings)

Agifish Factory, Vietnam Seafood Processing Factory, Vietnam Phnom Penh Airport Bus Terminal, Cambodia Church, Papua New Guinea

Seafood Processing Factory, Vietnam International School, Vietnam Sport Hall, Curved Roof, Vietnam

Seafood Processing Factory, Philippines Aquafish Factory, Philippines Sport Hall, International School, Myanmar Calamba Coliseum, Philippines

80 81
PROJECT REFERENCES

Commercial Building Material

Aeon Mall - Tan Phu Celadon, Binh Duong Canary, Long Bien, Binh Tan, Ha Dong (Vietnam), Phnom Penh (Cambodia)

Plastic Manufacturing Factory, Vietnam

Toyota Showroom, Philippines Seven-floor Sport Hall, Myanmar Warehouse, Philippines Plastic Factory, Vietnam

Airbase Spectators Venues, Saudi Arabia Si Mum Muang Market, Thailand Plastic Plant, Vietnam Porcelain Factory, Vietnam

82 83
Others
Vietnam
Myanmar

Philippines
Thailand
Cambodia

Wood Warehouse, Thailand Production Factory, Myanmar Indonesia

HEAD OFFICE
Unit 701, 7th Floor,
Menas Mall Saigon Airport,
60A Truong Son Street, Ward 2, Tan Binh District,
Ho Chi Minh City, Vietnam

Emperador Warehouse, Philippines HOTLINE


(+84) 908 883 531

EMAIL
marketing@pebsteel.com.vn

WEBSITE
www.pebsteel.com

VIETNAM FACTORY
Road No.1, Dong Xuyen Industrial Park,
Rach Dua Ward, Vung Tau City, Vietnam

MYANMAR FACTORY
Plot A10, Zone A, Thilawa Special Economic Zone
Unilab Factory, Philippines Buwon Vina Workshop, Vietnam (TSEZ), Yangon, Myanmar

84 85
Published May 2023

PEB STEEL BUILDINGS CO., LTD. Please scan the QR code


www.pebsteel.com to download this brochure

You might also like