L - FA - Niel T. - WK04 - NPCC PLB 648 Quality System Deliverables
L - FA - Niel T. - WK04 - NPCC PLB 648 Quality System Deliverables
2-WI-09-ISSD
Compliance
Reference
Item No Item Assessed (SAIC,SAES. Sch. Q. . ETC) Finding Root Cause Corrective Action Corrective Action Completion Remarks
YES NO N/A
Ref.approval letter
1 Approved Electrical and Instrument Inspector no.991/22021 per Schedule Q √
ATT. I para 3.3 and 3.3.12
Special process work procedures for cable gland, seal, and conduit Ref.dwg.no.9226-9228-PP-ON--
3 installation 003 per Att.IV to Schedule Q √
table no.17
Contractor QC: Name: Saseendran Positive Comments / Opportunity for improvement:The following documents mentioned above were reviewed and found acceptable per the contractor's approved schedule Q ATT. V requirements.
8.2-WI-09-ISSD