Professional Documents
Culture Documents
Inspection CCTV
Inspection CCTV
Action Records
Verification
Frequency
Personnel
Contractor
Contractor
Sl. Controlling
Consultant
Activity Acceptance Criteria
Main
MEP
No. Documents
Submittal approval
Specification/ Prior to Start S/E, Project Material approval
2 Material submittal approval status minimum X R A
Concept Design of activity Manager sheet
“Approved as noted”
1. Approved shop
Verify that the drawing/s used for Submittal approval
drawing Every new S/E, QA/QC
4. installation is approved, latest status minimum A1 A2 A2 -
2.Drawing approval section Engineer
revision & IFC stamped “Approved as noted”
sheet
1|Page
INSPECTION & TEST PLAN (ITP)
Client: Document No:
Project:
INSTALLATION OF CCTV SYSTEM Revision
LEGEND
X Document or Drawing Created A1 100% Inspection H Hold Point for Inspection or Test
R Review and Approval of Document A2 Random Inspection
A Approval of Documents W Witness Inspection
2|Page