WORKSHOP 03.

HIRAC
1. HAZARD IDENTIFICATION 2. RISK ANALYSIS / EVALUATION 3. RISK CONTROL (WITH RESIDUAL RISK ASSESSMENT)

DUE DATE PROPOSED CONTROL MEASURES


NO WORK ACTIVITY HAZARD POSSIBLE EFFECTS PROBABILIT SEVERITY RISK LEVEL (implementation of PROBABILIT SEVERITY RESIDUAL STATUS OF
. (SAFETY) Y Control Measures) Y RISK LEVEL MONITORING
Personal Protective
Engineering Control Administrative Control Equipment

1
FALL FROM INJURY/ FATALITY 5 5 25 IMMEDIATE ACTION
HEIGHTS

#VALUE!

2 ERGONOMICS BODY PAIN/ 4 3 12 WITHIN A WEEK

#VALUE!

3 WORKING AT HEIGHT FALL FROM HEIGHTS

#VALUE!

#VALUE!