You are on page 1of 14
Solution of Problent Coefficient of uwisor midy (Cu) is defined as the. ratio of Deo do De i the soik The physica meaning of Cane = vod) is unidorm (only singe size particles are prese’d). . gige dishribubion- From the ques soil sample. ee" Ee oo. SS | sieve no. | siave site y Finer | Cumulative 7 retadn | my | fi) ee | #4 | {oof D = He a3 oon ; = HG KT S | #20 3 | 7 _ | 450 wm I 28 [we ow | oe | — | 4k 200 6 0 ORS ul €9 : — — From the fable we can see, no soil ample retaine onthe sieve FE4. That means there is no gravel in the said sample. Again, 62% soil Jomple retained on the sieve H)00. $0, the soil sample cowfained, 68. Sand. And, 32% Seid sample passes theowgd i Sieve tb joo. $0, the said ganple conbined 327. Fine pawdicks. Given Data, Dry unit weigh = 178 KN jv? Mois ture Covdertt = F247 Bulk densidy = 18-9 KM /n? Dry Densidy = Bulk densi = (8-9 1+ Moisture covtort [+ 0 1PL = 16:13 kv? To achive the veguined by unit weight of 1K8 KA? we need fo increase The density by a factor of : Factor = Repined dy wit weg! 196 _ ju104 Dey density 16-13 $0, we need 42 ineneate the densish. by lo-4y. Volume of soul reguived - fren Volume = Length x wi tJ 0104 = [1000 x{EREX (6496) ] KOH1OF S 13520 Numbex of drips required foe the dump Huck; Payload Capoudy = 20 dons Masinam load capacitg = 90% * Maximum loaded weight = 220X907. = Assume, the soil bnsity wb Aoneh,3 18 dors "Volume of soil per wip = at = 2s mm? \ wel 2 Dee Number ef Hip regi 12s = 1201-7R x [202 Nos, Cost eetetation cost of sol = Volume x Rate = 13520 .X }00 = 1352000 tk cosh of ump truck pedo = No, of Wripex Time fer trip ye rentd rate = 1202% 2 K 2000 = 490¢000 tk Cost of labour = Volume x Labow charge 1520 X42 iss2o tk y V Tob cost = cost of coil + Cost of damp Auch rod + cot of fabour a (\952000 + 4908 00° 13 ere tk = 6173520 tk Solution of Problem -3 EES trodden" >. Hetght of oth = pem = 10 Vv p2so Be plot area = 26 acres = 7 plot area x healt af so Volume of sot weguired eS = joleso x = \si8gs D . Bulk densiz g dency = | + ™oisdure. conlent 8 eae Kl/n* 1+ 0-124 weight of solid peguived Num ber of trips veguined = Volume. f s0id by doy = lbs % 14-95" = 2270S 3lkN = 227053 teton weight of soit ~ Capa clump az = 242053) 25 zo 3190+ 5625 drips ) i} % UBI9! drips Cost of dump duck went = 113194 y 2% 2000 = 22638200 tk Cost of Lebow tor placing and compaction = jsregext = 15b7e tk Todad cosh of Sibleg works = fagsneone + #187) = 2265 33925 tk Shin trols 4 Reguined volume of euth material = sKloroX 2:(o6t)Ke = 650000 m? Let a deuap track Can Corry 20 nm” easth wuahesials No, ef dvips reguimed = ie 32500 Nos, Sife~ dt . “ox “Tans portation cost 2 Bee = 294376 000 +k compaction cosk = 1x 650000 = 650000 HK B5025000 tk ToRA cost = (2043780 pésoete) = Sike- 2! : : 32500 X 3OSOX3AXL Trans portation cot = a = 35 pbrs00 tk Conpaction cost a 4.) x £0000 2 HEI Tk ph cst - (ss v6ees00 + Fis0e0) fh 359372500 tk " Again, Site -1 consists a well greed soil, but side-» Consists poor dy graded col , aks the cost, he Considenna the material € cart wader peconmendation jefe fe borwouig ts side-L. Solution of probden — 5 From gree ize dicdibubion curve, we ga- gmm Mean grain RE, Deo = 0°07 The coeffciet of anifor ity Cu = Deo Die 0-13 oy ads D-Ol4 = 9-28 a Dao The coefficient of curvedure, fc ce ‘60 to od (0 047, ~ ~“ol8 XO-Ol4 e227 From coefficient of wife mit (ea) and. Cooffieiet of curvature Wwe Can me dhe soil ab Qa well grade? soil, Solution of Probdem —6 To estimate fhe chanee ln stress, We Can use Boussinesg7s formula fr poivt Load stress distrib tion, 6,2 a | [i + ey” are” in < vertical fress Q= Verdi cok load v= vadtad distance from the Lead fo the past 2 = vertical distance from tHe dead 4 te print = (off Here, g= zs00lb, rea vz=( +3) 0 Oz 2 a ar” “Te Fer i 7 _ 2X 7570 = axe * 34:93 [b/ty” " Given, Po 1% kWl/n® @- 059 Stress at the op of riverbed = Yh HINER IB 306 is Stress al the op of niverbed during eet = xh = IFX (eth = 331-5 kn yh— (%%x9) 306 - (2-81x0-59) = 30021 kis Depth Effe chive tres 6b vows Effective dress in mentoon = gh-(%ex9) sas (9H X09) 232508 ki/m* Depth of jhe Lyuest point = (1245) = 23% stress at the dowest poirot = Sh = wig x23 = 39) Kye sfress at the Insest pond lh nongooh eho 1X (234 FS) = 416 S iyo Effec dive stress at the bwest- part = gh — (wre) = pal (9:81 2D) = BEE 21 kN at te dovestooink- Effective shes tH mongon = 4/6. — (Hxe) 2 4lb-5 - (24x 0-59) = 4lo-FI KN/m Seltion of problem -8 Given > He . 3m, €. 7082, Lt = 44 dd =20r , ‘Av — a he index, *. Compwe csion Ce = 0-009 (LL —le) =o -009( 44-10) = 0308 Effective overburden presstve? C= BBR 42% (6-9-8) a 2 (82-78) = jor 343 wn [we we know, consolidation getllenert F ; L 6+ bye Se = Ve. ve G' er ee ~ tro poe d Jol 343 = 49 mn = 0047 ™ =

You might also like