7 PREDOROV / 7 TUNNELS

T1 6 714 m T5-6 505 m

T2 6 009 m T7 1 154 m

T3 335 m T8 3 808 m

T4 1 948 m

new RAILWAY link DIVAČA–KOPEr

Second track 3 VIADUKTI / 3 VIADUCTS

V 215 m V2 424 m
T1
MAP V3 630m

T3 V

T4

T5 6
Prestavitev obstoječega tira
T8 V2 T7 V1 T2 The relocation of the
existing track

Drugi tir med ENP Dekani


in Koprom, že zgrajenih
ca. 1,2 km
The Second track between
the Dekani power sub-station

ZEMLJEVID
and Koper, approx. 1.2 km
previously completed

Dolžina proge:
27,1 km

Drugi tir
Length of track:
27.1 km
nova železniška PROGA DIVAČA–KOPER Dolžina dostopnih cest:
22,8 km
Zemljevid / Map: Geodetska družba d. o. o. ∞ Julij /July 2019

Length of access roads:


22.8 km

2TDK, Družba za razvoj Sledite nam na / Follow us at: