Professional Documents
Culture Documents
R07 HC3D02 MML 02 XX DWG Ci 55106
R07 HC3D02 MML 02 XX DWG Ci 55106
.50
1. All dimensions are in meters unless otherwise stated.
+4
CL-03
0
Ø160 HDPE
+5.00
+5.0
2. Coordinates are following UTM Zone WGS84-37N system.
00
1.50%
+4.
IL 4.07
0
3. This drawing to be read in conjunction with master plan,
.1
+5
IL 3.28 VILLA-03
IL=3.2540 roads, architectural, landscape and MEP drawings.
0.64.m³
+2.80
30
+4. +4.
VILLA 3-04 4. Contractor to liaise with the all building connection with
MEP drawing.
PE IL=3.16 IL 3.91 IL=3.81 5. Cleanouts shall be provided in storm water network at
0 HD CL-03
6 suitable location to the approval of the engineer.
Ø1
IL 3.37 0% 6. Access shaft shall be located at high ground level above
1.5
geocell.
+5.00
1.16.m³ 7. The roof outlets shall be connected to the storm water
network at minimum 0.75% of slope.
+4
PE
.0
CL-03 0 HD
0
SUITE 2-03
0
+5.00 .1
IL 2.97 +5 8. Geocell overflow should be located at lowest contour.
Ø16 IL=2.85
+3
%
0
+5.50
CL-03
+5.1
+2.70
+2.80
10. Contractor to refer design report appendices A.3 i.e. flood
+5.00
analysis results of 1 in 100+20% CC return period &
IL=3.83
4UNITS_1K1Q2A-01 update grading in co-ordination with Landscape
+5.0
N1
+6.0
Consultant/Engineer In charge, to avoid flooding for the
+5.5
IL 2.57
+5.0
0
+4.5
+3.50
1.97.m³ areas shown in the Flood analysis results.
0
0
0
+3.40
IL=3.86
+5.10
+3.30
1.53.m³
+4.90
+5.00
IL=2.46
50
VILLA-03
.
+4
CL-06
VILLA-01 N1
+5
.
00
+4.00
IL 3.88 +3.50
00
+ 5.
IL=1.66
IL=1.86 IL 1.71 +2.80
+3.00 Revision Notes:
50
+4.50 4. .70 1. Added annotations for the geocells.
VILLA-03
+
0.61.m³ +2.80
+2
CL-07
+2.70
2. Geocells added for LPG Yard, Water Sport Centre &
CL-07
0
+4.0
Heat Cool Pump Room.
3. Inverts and networks are updated to resolve clash with
.80
50
+2
+3.
building structures and waste water network.
.70
1.92.m³ VILLA-03
+2
+4
00
.0 0
4. Invert levels and pipe diameter are provided into
+3.
0
90
+4.5
IL=3.36
+4.50
+2 .
0
+5.0
.7
80
3.18.m³
+2
IL=2.16 0.66.m³
.
+4.50
+2
+5.5
0
IL=2.66
IL 3.51
VILLA 1-01
HDPE
0
+3.00 .9
0.42.m³ VILLA-03 CL-04 +3
1.50%
0
+2.8
+3.50 IL 2.36 IL 2.95
.00
0
+3.30
+2.9
+3.4
+2.70
IL 2.75
+4
Ø160
0
+4.00
0
1
1.12.m³ IL=2.86 +4.00
+4.
+3.50 0.72.m³ +3.90
+4.00 +3.00
IL 2.31
+3.50 IL 2.16 0 +2.80
1.75.m³ IL=2.93
.1
0
0.57.m³
+3
+4
.2
+3
IL=2.16
10
+4
.50
.0
IL=2.86
.00
+3.00
.
+2.6
0
+4
0 0
+4
+4.0
+3.00
.80
IL=1.66 +3
.90
+2
3 UNITS 1 TYPE 2 _01 IL=2.06
+4.00
0
+2.8
+2.60
CL-04
1SUITE 1 UNIT-02
.00
.0 0 +3
+5 CL-07 .50
CL-03
+2
+4
3.92.m³ IL=2.86 IL=1.86
.4
+4.0
0
VILLA 3-03 0
+3
+3.
6.10.m³ 0 5
.5
0
+4.5
0
+3.00 +3.00
N1 20/03/2023 ISSUED FOR CONSTRUCTION NT
+2.70
0
IL 1.93
+3.9
0
+2.9
+4.0
+4.10
N0 21/12/2022 ISSUED FOR CONSTRUCTION NT
+2.8
VILLA-01
0
0
IL=3.01 0.61.m³ 70
0.47.m³ + 2. Rev. Date Reason For Issue Chk
0.8
0
.0
+2
+4
+3
.5
0 +2
.8
0
IL 1.95
CONSTRUCTION DOCUMENTS
0
+5.0
0
+4
.0
+3
.50
Key Plan HW1
.00
+5.0 +4.00 +5
+4
0
0
.0
.5
+4
0
.00
0
+4
+3.0
IL=1.96 +4.5
0 +4
.0
0
+3.50 HC2
HW2
CL-02 +4.0
0 IL 1.73
+3.00
+
+3.00
PE
0
0 3.3 Program 4
2.76%
+4.
00
0.69.m³ .5 +
%
CL-05 +4
+3
0 Undergoing
.4
0 HD
+3
.4
+2.70
1.50
0
Coordination
+3.50
+2.80
+2.90
.00
+5.00
HC1
+4
IL 1.72
.50
Makkah
Ø16
CL-03
+3
IL=1.66
70
IL 2.52
+2.
+3.40 HW4
+4
.0
IL=1.50 N
0
.80
HE1
50
0.71.m³
+2
.70
.
+4
+2
4UNITS_4K-01 IL 2.65
.0
0 IL 1.81
+4
IL 1.75
+3.60
Legend
+3.6
0.70.m³
0
1.17.m³
+2.8
+3.40
0
0
Proposed Geocell
+4.50
+4.00
+3
IL 1.87 CL-03
.5
+4
0
.0 0
IL=1.66 Proposed 160mm OD HDPE
FOR CONTINUATION SEE SHEET NO. 05
+3.5
0
+3.50
Perforated Pipe
+3.00
Proposed Clean Out Shaft
SUITE 2-01
+2
0
0
.8
.7
.80
+2
+2
Proposed Access Shaft
.00
+2
.50
+4
.70
+3
0
Bioswale
.8
+2
CL-05 CL-02
N1 1.54m³
0
Bioswale Volume
.7
+2
IL=2.36
Ø160 HDPE
+2.90
1.00%
1.51.m³ 0.58.m³
0
+3.5
+2.80 .90
+4.0
0
.00
+4.5
+2
+3 .50
+4
.00
+3
.00
+3
5.36.m³
IL=1.65
2.03.m³
+2.8
0
+3.00
.80
+3
+2
+2.9
.00
.80
+2 .70
+2
0
+2
.6
+3
.50
+3.50 AOR/EOR
IL 1.90
+4
.0
IL 1.93 CL-06
0
.8
+2 0
+3
.5
+3
.50
. 00
+3
N1
0
.8
+2
Ø160 HDPE
+3
.0 0
Design Consultant
1.50%
+2
. 80
+2
.70 IL=1.70 +3
.00
Festival Tower
+3.0
+3.5 0 .00 .7
0
Dubai Festival City
0 +4 +2
+4.0
0
Dubai, UAE
50
+3.
T +971 (0)4 206 9111
dubai@mottmac.com www.mottmac.com
+2.80
Executive Architect/ AOR
Licence number - 1010348048
+2.70
+2.50
Riyadh11481,KSA King Abdul Aziz
District,Salah Al Din Al Ayobi Road
T +966 11 477 8384
+2.00
F +966 11 477 9793
Riyadh@khatibalami.com www.khatibalami.com
+1.70
Signature/Design Architect
+1.30
Client
+0.50
+0.30
+0.00
Project
SHURA
PROGRAM 07
HOTEL CENTRAL 03
-0.60
Drawing Title
Sheet 06 of 06
Model File Reference
R07-HC3D02-MML-02-XX-MOD-CI-55002
Makkah
Drawn By Checked By Approved By
AA NT FS
N
Project No Issue Date Scale at ISO A0
1:250
0 12.5m 25m
R07-HC3D02-MML-02-XX-DWG-CI-55106 N1
C:\Users\GAI103735\DC\ACCDocs\The Red Sea Development Company\R07 Shura Central Hotel 01-03\Program 07\01_WIP\HC3\HC3_08_CI-Civil &
Infrastructure\Drawings\R07-HC3D02-MML-02-XX-DWG-CI-55106.dwg Apr 12, 2023 - 8:50PM GAI103735