OBSERVATION REPORT
Jrwrcnane: _ [MASRAF AL RAVAN HEAD OFFICE PROJECT at SEEF LUSAIL QATAR
loate: pala [rive 030A
[Report No: [p-798/08s-098 [Disipine: lrchitectural
issued to: ME Takyect [Sub-Discptine: Repairing works around MEP boxes
ce: Mr Bleeson k. Specific Location: Corewall-2 Elevation 1 Zone-03
[Designation: [Construction Manager [cation Level-02 20 08
[ADE Engineer present (Y/N
(Corewall-2 ,Elevation -01, level -02 to 03 ) ,Kindh
Ithe attached photos .
This Site Observation is being issued for improper rectification around the MEP boxes
ly rectify at earliest as per approved method of statement ,refer to.
a
lamer brain ert —
oesenstion lawactreneer oats: sauna |
Sa lew ZY -—
Jesenaton farracwaraer lose loner €
fee IMr.Mahmoud Chahine Sen \
csaon fetncaorcer lowe fen ae
peor [eerste
owsentn lowe:
[ener
Os Of
Ite pe:
owserton fone:ZY @ -\=I5
Ns sao i cean pee (OLEAN ss
MASA ALANA TUMIEQaiay Arab Engineering bureau 2
OBSERVATION REPORT
Date: faevub2a Time: fioaoam 7
|Report No: [Ds-748/085-098 JDiscipine: |Architectural 7
ee